ME 5575 PROJECT
December 20, 2010
Marque Cross
2
Project selected
• Building is to be placed in Phoenix, AZ.
• Building Area needs to be around 160,000 square feet.
• Building should fit within a 35,000 square foot lot, parking provided
3
Rules of thumb
• Heating/Cooling– Interior of office building
• AC in square feet per ton = 350• Heating in BTUH/CFM = 3
– Exterior of office building• AC wise = 275• Heating wise = 3
– On average• AC wise = 312.5• Heating wise = 3
4
Rules of thumb
• Capital Cost estimates– Cooling $1600 per ton– Fan/ductwork, system $7.65/CFM– Heating $2.65/CFM
• Annual Energy Use– Office building 30.5 KW/square foot– Sustainable electric 15 KW/square foot
5
Rules of Thumb
• Annual energy cost– Electric $.085/KWh– Gas heating $.75/them
• 400 CFM/ton estimation for air flow• 1.2 CFM/square foot for the area
6
Outdoor Condition
• Office building in Phoenix, AZ seemed closer to the Sky harbor airport.– Winter at 99% assuming 60% RH, DB
temperature 41.3 degrees F– Summer at 1%
• Cooling DB 108.3 degrees F• Evaporator WB 75.2 degrees F
7
Preliminary Calculations
• Sizing of air conditioning unit– 512 tons from calculations
• Size of heating system– 4,800 MBH required
• Air handling unit– Taking 512 tons of cooling and the
building area, Average size 198,400 CFM
8
Preliminary Calculations
• System Cost– $819,000 cooling cost– $525,000 heating cost– $1.5 million Equipment cost
• Anticipated Energy Cost– Electric at $.085, $414,800 cost– Sustainable, $204,000
• Should save $210,800 if using sustainable design
9
Building 3D view
10
Building footprint
• Given 160,000 square foot on 35,000 square foot lot– 14 story office building
• Aspect 3-to-1 X=3y– X1 = 186.99 ft Y1= 63.33 ft– X2 = 50 ft Y2= 60 ft– Floor-to-ceiling 10 ft
11
eQuest
• A baseline run followed by two different runs was performed using the eQuest program– Two runs
• 2 chilled and hot water coils with a standard VAV system with HW reheat
• Using evaporative cooling
12
eQuest First Run
13
eQuest First Run
14
eQuest First Run
15
eQuest First Run
• Equipment Used– Carrier Aqua flow 30xw chiller
• Electric hermetic– COP 6.1 -6.4– Supports up to 400 tons of cooling– Twin screw compressors– Full load at .631 kw/ton– Based on features, ASHRAE 90.1 compliant
– Global industry pt-399 boiler• Up to 95% efficiency• BTU range 122 -399 MBH• Natural gas or propane
16
eQuest First Run
• Equipment used cont.– Mokon water cooling tower
• All-season reliability• Supports from 8 tons and up
– Goulds A-c Series 2000 model 150• 200 hp motor• Flows up to 3100 GPM• Supports temperatures up to 250 degrees
F
17
eQuest Second Run
18
eQuest Second Run
19
eQuest Second Run
• Equipment used roughly the same with the exception of the evaporator– Aztec direct/indirect system
• Air delivery 1,500- 37,500 CFM• Energy efficient• Preferred sustainable method of cooling
– No compressors nor refrigerants– CFC-free cooling (Chlorofluorocarbon)
• Water saving
20
eQuest Run Comparison
21
eQuest Run Comparison
22
eQuest Run Comparison
23
eQuest Run Comparison