Post on 21-Aug-2020
transcript
TRUene
CLG Ag
Meeting C
Project T
Venue B
Purpose •
•
Time IteNo
4.30pm 1
IteNo
2
IteNo
3
IteNo
4
IteNo
5
IteNo
6.30pm 6
ergy Ma
enda
CLG meeting
TRUenergy M
Big Hill Rural
To provid
To introdu
em o.
1 Welcom
em o.
2 Marulan
•
•
em o.
3 Introduc
•
•
•
em o.
4 Discuss
em o. Discussion
5 Other m
•
em o. Discussion
6 Next ste
rulan Pr
g
arulan
Fire Service,
e an update
uce the CLG
me and introd
n Project Upd
Latest newsproject
Questions a
cing the TRU
Purpose, fu
Terms of Re
Questions a
ion about the
points
matters
Report back
points
eps, thank yo
roject
Brayton Roa
on the Maru
and discuss
duction
date
s about the T
and answers
Uenergy Maru
nction, key r
eference
and answers
e CLG and M
k on matters
ou and close
ad, Brayton
ulan Project
its purpose,
TRUenergy M
ulan CLG
roles
Marulan Proje
from last me
e
function and
Marulan
ect
eeting
Ref No. 11
Date W20
Time 4.
d key roles.
Presenter
Elton Consu
Presenter
TRUenergy
Presenter
TRUenergy a
Presenter
All
Presenter
TRUenergy
Presenter
Elton Consu
1/2447
Wednesday 1011
30pm – 6.30
lting
and Elton Co
lting
14th Septemb
0pm
onsulting
ber
TRUene
CLG Me
Meeting F
Project T
Venue B
Purpose •
•
Participants
Wayne Urle
John Reyno
Antonia Ste
Catherine F
Wayne Hillie
Elizabeth El
Geoff Kettle
Ken McNally
Guy Fletche
Steven Burg
Marcello Dia
Graham Dow
Brendan Bla
Georgie Wh
Apologies
George Barn
Bernie Budg
Rosemary T
John Nacast
Maree Aboo
Simon Gilmo
Jason Gordo
Rodney Falc
Chris Stewa
ergy Ma
eeting N
First CLG me
TRUenergy M
Big Hill Rural
To provid
To introdu
olds
phenson
letcher
er
lis
e
y
er
gun
amante
wers
akeley
headon
nett and Joh
gen and Laur
Turner
tri and Maure
od
ore, Phil Ven
on
coner
art and Chris
rulan Pr
ote
eeting
arulan
Fire Service,
e an update
uce the CLG
n McKindley
ren Wilson
een Eddy
nton
Berry
roject
Brayton Roa
on the Maru
and discuss
Big Hill Rur
Landcare G
Dairy Road
Billyrambija
Local reside
Southern V
Mayor, Gou
Dairy Road
Billyrambija
Sydney Uni
TRUenergy
TRUenergy
Elton Consu
Elton Consu
Canyonleigh
Landcare G(represente
Marulan an
Marulan Pro
Office of th
Penrose Co
Wingecarrib
Goulburn F
Goulburn-M
ad, Brayton
ulan Project
its purpose,
ral Fire Brigad
Goulburn Offic
resident and
a Landcare G
ent, Big Hill a
Villages Group
ulburn-Mulwa
resident and
a Landcare G
iversity Land
y
y
ulting
ulting
h Community
Goulburn Officed by John R
d District His
ogress Assoc
he Hawkesbu
ommunity Ass
bee Shire Co
ield Naturalis
Mulwaree Co
function and
de
ce/Catchmen
d Diary Road
Group and loc
and member
p Co-ordinato
arree Council
d Diary Road
Group and loc
care Society
y Association
ce/CatchmenReynolds)
storical Socie
ciation
ry Nepean
sociation (re
ouncil
sts Society
ouncil (repres
Ref No. 11
Date W20
Time 4.
d key roles.
nt Manageme
d Community
cal landowne
of the Big H
or
l
d Community
cal landowne
n
nt Manageme
ety
presented by
sented by Ge
1/2447
Wednesday 1011
30pm – 6.30
ent Authority
y Alliance
er
Hill Fire Briga
y Alliance
er
ent Authority
y Elizabeth E
eoff Kettle, M
14th Septemb
0pm
y
de
y
Ellis)
Mayor)
ber
Chris Stewa
David Hump
Warren DenMal Moloney
Delise Freem
John Bell (Gand John Sh Discussion points
1 We The meeting
•
•
2 Int Brendan Blasuggested T Graham Dowthis project, Questions a
–
–
–
–
art and Chris
phries and Ke
nnis, Fai Moloy
man
General Manahaw (Mayor)
s
elcome and
g commence
Brendan BlaLiaison GrouMarulan comindependen Feedback wgovernmentmeetings ar
troducing th
akeley from ETerms of Ref
wers from TR, i.e. picking
and comment
Q: To confirinformation obligation toA: This is cand would l Q: If approameetings onA: Yes, the Q: In the lastations beistation). Thimpacts. ThA: The omiswith Origin two projectsdevelopmenprocess. Futhe Power Swill likely bethat make s
Berry
en Wray
oney and
ager)
introductio
ed at approxi
akeley from Eup (CLG), exmmunity. Hent facilitators
was sought ont stakeholderre held quart
he TRUener
Elton Consultference and s
RUenergy exup the proje
nts from CLG
rm, the CLG to and from
o respond tocorrect howeike to hear a
ached by a jon a website? minutes from
st meeting ang built at there was the
his issue doesssion of this about our tws are on diffent has attainerthermore, TStation. Origie compressedsharing a pip
Goulburn-M
Marulan an
Marulan Ru
Pejar Local
Upper Lach
on
mately 4:40
Elton Consultxplaining thee explained E
of this proce
n the currentrs). The grouterly.
rgy Marulan
ting gave ansuggested G
xplained thatect with prev
members to
is a group pm the commuo CLG commever TRUenerall types of co
ournalist, do
m CLG meeti
an issue was he same timesuggestion t
s not appearinformation w
wo pipelines erent timelined Project ApTRUenergy’s in has advised to provide
pe not feasibl
Mulwaree Co
d Region Ch
ural Fire Serv
Aboriginal L
hlan Council
pm. Opening
ting welcomeCLG will be
Elton Consultess.
t 4:30pm meup responded
n CLG
overview ofround Rules
t the CLG’s Tvious approva
o TRUenergy
ut together inity, but witents/suggestrgy wish to monstructive f
o we have pe
ings will be p
raised aboute in the samethat TRUener in the previowas not deliincluding sim
nes. TRUenerpprovals whiproject will h
ed that it is dstorage of n
le between t
ouncil (repres
amber of Co
vice
Land Council
g remarks inc
ed the groupTRUenergy’sing have bee
eeting time (d that there
f the CLG out(see attache
Terms of Refeals confirmed
y
in good faithhout “teeth”tions. maintain an ofeedback, eve
ermission to r
publicly availa
t possible cue area (i.e. Trgy should bous minutesberate. TRUe
milarity/dissimrgy’s project ilst Origin hahave a relativdeveloping a natural gas ohe two partie
sented by Ge
mmerce
cluded:
p for the firsts key vehicle en engaged b
which aims tare no objec
tlining its pued PowerPoin
erence reflecd.
by TRUener. That is, the
ongoing relaten when not
refer them to
able on TRUe
mulative impTRUenergy’s be liaising wit. energy has hmilarity of rouis more advas only recentvely short galong distancn the lateral.es.
eoff Kettle, M
t meeting of for interacti
by TRUenerg
to accommodctions to curr
rpose and funt presentati
ct the particu
rgy as a conde company d
tionship witht positive.
o the minute
energy’s web
pacts from twstation and
th Origin abo
had an openiutes. The coanced in thatly started thas pipeline floced large dia. It is these m
Mayor)
the Communng with the gy to be the
date rent timing if
unction, on).
ular situation
duit for oes not have
h the commu
s of these
bsite.
wo gas fired Origin’s
out these
ng discussioonclusion is tht the heir applicatiowing fuel tometer pipe tmain reasons
nity
f
of
e an
nity
n he
on o hat s
–
3 D
a) Project
Marcello Dsupply are
A brief his
•
•
•
•
•
•
Questions
–
–
–
Q: Have thenot indicateA: These dis
iscussion a
t overview
Diamante froeas and mark
story of the M
TRUenergsettlementThe currenwith commTRUenergconsultantsite. The prelimdevelopmeconsolidatenvironmevisual impTRUenergonsite andvolumes inthe MarulaTRUenergonsite befpreferred
s and comme
Q: Will yoA: The siteexcluding into a sed Q: What apipelines? A: The preThis amouTRUenergoutlined inQ: What aA: The preenvironmehas taken is engaginlandownera balance environmeTRUenergimpact. Note: A m
ese meetingse they have sscussions we
about the CL
m TRUenergkets (see atta
Marulan proje
y acquired tht and the fornt Project Apmon infrastruy have sincets to develop
minary findingent of 4 E Clted, and the ental impactspact of the sty’s proposal
d incorporatinn the area asan area. y will undert
fore finalisingpipeline rout
ents from CLG
u harvest wae’s permit dothat used inimentation p
are TRUenerg
evious projecunt varies byy’s current pn the Projectare your obligevious sponsental impact into conside
ng directly wirs we have tbetween wh
ental impactsy has tried to
map of the pr
s been held ispoken to TRere held in ea
LG and the
gy gave a brieached Power
ect was then
he Marulan srmal transferpprovals incluucture provise been reviewp a revised co
gs in the Conass turbines constructions (i.e. amounructures on tinvolves acc
ng an evapos the current
take preliming the concepte and will be
LG members t
ater onsite?oes not allowoily areas w
pond for clea
gy’s obligatio
ct sponsors hy a few Ha deproposal invo’s environmegations for thsors completeof the propo
eration propoith affected lried to take
hat has been s from any cho ensure tha
oposed pipel
n the last weRUenergy. arly August w
Marulan pr
ef overview rPoint presen
n given, with
site from Delr occurring ouded two sepsions. wing the devoncept plan
ncept Plan aron the one
n lay down arnt of surrounthe site.
cessing the Sration pond tt approvals re
nary Geotechpt layout. TRUe submitting
to TRUenergy
w TRUenergywhich will be ning before
ons for offset
had negotiateepending on olves having ental assessmhe easemented a detailedosed gas pipeosed vegetatandowners ointo consider approved byhange. As paat any chang
line route wa
eek? In prev
with their De
roject
of the compantation).
the following
ta Energy ann 1 March 20parately own
elopment sitthat benefite
re that the spad. This wirea to sit on nding vegetat
Southern Highto manage require water
study to conUenergy is alpipeline lice
gy
y to harvest wcaptured andbeing release
tting vegetat
ed an offset the final pipto clear less
ment. t with regardd environmeneline corridorion clearing on the pipelinration their ry the Governart of any che either has
as presented
ious convers
evelopment M
any’s custom
g points mad
nd Energy Au011. ned power st
te from a fresed from havin
ite is able to ll enable dupthe unused ption needing
hlands Wateeject water. r and waste t
nfirm the prolso talking to
ence applicati
water onsite.d treated seped into the W
tion clearings
package of aeline route tvegetation t
ds to offsettinntal assessmr. The offset along the pipne route. As equirements
nment, landhange to the a neutral or
in the meet
sations with O
Manager.
mer base, ser
de:
ustralia in lat
tations on ad
sh perspectivng a single o
o accommodaplicate infrastpad reducing to be cleare
er Pipeline to This will redto be trucked
oposal will beo landownerstion shortly.
. All storm wparately) wilWollondilly R
s for both the
approximatethat will be tathan the max
ng vegetationment which in
package alrpeline corridopart of our d
s however weholder requireproposed pippositive env
ting and is in
Origin they d
rvices and
te 2010, with
djoining pads
ve and engagowner of the
ate the tructure to bg the ed) and overa
supply wateduce traffic d in and out
e constructibs to finalise
ater (i.e. l be directed
River.
e site and
ly 45 Ha onsaken. ximum limits
n clearings?cluded the eady in placeor. TRUenergdiscussions we need to strements and tpeline route vironmental
ncluded in the
did
h
s
ging
be
all
er
of
ble
site.
e gy with rike the
e
–
–
–
–
b) Next st
Marcello D
• •
• •
• •
Questions
–
–
attached p Q: What aA: This is the naturadiameter. finalised. Questionslabelling oA: TRUenimpact onmeeting w Q: What sA: The Higreservoir tthe Powerneeded ascommence The abovelauncher toff-take po Q: Will thistorey comA: TRUenecompressodesigns fo
teps
Diamante fro
issuing puscoping recommenceundertakinengaging and InfrasdiscussingTargeting
s and comme
Q: Under CanyonleigA: The ProcommenceCanyonleiga local gov Q: Could TA: We havother oblig$100,000 the area acommunit
presentation.
are the dimenstill being de
al gas pipe toWe will advi
arose regarof the land ownergy has tak other lando
with a revised
sort of infrastghlands Sourto the Goulbur Station is yes it completee on detailed
e ground facto allow cleanoint where th
s include commpressor houergy will be cor is not requor their Proje
m TRUenerg
ublic notices iequired workes ng preliminaran Independstructure) forg the Concepopening of t
ents from CLG
the current Dgh Road? oject Approves. TRUenerggh road is a vernment res
TRUenergy cve not considgations, for ecommunity g
and working ty.
.
nsions of theetermined aso be within 4se you of the
ding the sidewners represken this issuewners howevd diagram.
tructure will rce Water Pipurn reservoiret to be detes the constru
d design of th
ilities that wining of the phe pipeline w
mpressors anuse. constructing uired at this ct.
gy explained
in local print ks to upgrade
ry geotechnicdent Environmr the Projectt Plan with tthe Marulan
LG members t
DA, does the
als require Tgy will maintpublic accessponsibility.
consider contdered ongoinexample, $30grant to the in the area,
e pipe? s part of the 450-600mm ae final meas
e of the roadsented in Slide on notice. ver we will re
you have to peline has pur. The exact ermined. Furuction and cohe pipeline c
ill be requirepipeline laterawould be con
nd a compre
a flow pipelistage. We a
key project a
media on the Canyonleig
cal surveys tmental Repre. the DepartmeProject webs
to TRUenergy
e company o
TRUenergy totain the roadss road and o
tributing to tng upkeep of0,000 contribUpper Lachlaso the comp
Concept Planand the wateurement at a
d the pipelinede 16 of the We are confeview this an
pump the wumps installedesign of thether work wiommissioningconnection.
ed for the natal and a sma
nnected to th
ssor house?
ine to the Pore not in a p
activities ove
he pipeline lich Road befo
to support thesentative (a
ent of Plannisite by the ne
gy
nly have obli
o seal Canyod for fair weaongoing main
he ongoing mf Canyonleighbution to thean Shire. TR
pany will have
n however wer pipe to be a future CLG
e is on and acPowerPoint pident that thnd will report
water and theed to flow wae equipmentith the Goulbg of their pip
tural gas pipeall shed. Theshe existing M
Origin is talk
ower Station osition to co
er the next th
cence applicare power sta
he proposed approved by
ng ext CLG mee
gations to u
nleigh road bar and tear duntenance of t
maintenanceh Road as a c Big Hill RuraUenergy will e an interest
we expect thee approximate
meeting onc
ccurate reprpresentation
he proposed rt back to the
e gas? ater from thet necessary tburn-Mulwarepeline before
eline would se would be
Moomba-Sydn
king about b
site which momment on O
hree months
ation ation constru
layout and Cthe Departm
eting in Dece
pgrade - but
before consturing construthe road will
e of Canyonlecontribution al Fire Brigad have emplot in supportin
e diameter ofely 150mm ice the design
esentation a. route does ne next CLG
e Wingecarribo flow wateree Council is
e work can
be a scrubbelocated at th
ney gas pipel
uilding a two
means that aOrigin’s plans
will include:
ction
Concept Planment of Plann
ember.
t not upkeep
ruction uction howevcontinue to
eigh Road? as yet but h
de and the oyees living inng the
f n n is
nd
not
bee r to s
er he line.
o
gas or
:
ning
–
ver be
ave
n
Questions history of
Specific co
•
•
•
•
•
•
•
Questions
–
–
–
–
A request follow-up.
4 Oth
Report back
In the previstations. Gr
•
led to a broflooding and
omments inc
Canyonleigenough toThe most Road. The main easy to reCanyonleigthe heavy Goulburn-CanyonleigCLG memlimit and nper hour iTRUenergTRUenergdeveloping
s and comme Q: How faA: The En150 metrerequireme Q: What isA: ProposeProject Apadded. Q: When iA: We arestill subjec Q: Does thA: The Casite. TRUeconstructio
was made to
her matters
k on matters
ious communaham Dower
A number ocommissionwhere gas wslag and othquestion cainvestigated
ader discussd current use
cluded:
gh Road travo flood proof recent flood
issue with floeplace if damgh Road is a vehicles che
-Mulwaree Cogh Road. bers who resnotify the locs recommeny will be engy will consulg the upgrad
ents from CLG
ar will the panvironmentaes from the Went.
s proposed ted content inpprovals on t
is the start oe targeting Noct to TRUene
hat mean roanyonleigh ro
energy will taon is given.
o consult Go
s
s from last me
nity meeting rs from TRUe
of accidents hning phase ofwas releasedher materialsused five ded by the US G
sion about loce.
verses a floodthe road. Inwas higher
ooding is damaged; when lso a populaecking stationouncil is curr
side along Cacal traffic autded).
gaging a cont with local c
de of Canyon
LG members t
d be from thl AssessmentWollondilly riv
o go on the nclude the CLhe Departme
of constructiootice to Procergy board ap
ad constructoad upgrade arget comple
ulburn-Mulw
meeting
a question wenergy provid
have occurref the stationsd at high press from the coaths (undersGas and Elec
cal knowledg
dplain and isn 22 years, flothan seen in
mage to Cansealed this cr alternative n. rently respon
anyonleigh rothority of cha
sultant to excouncils and nleigh road.
to TRUenergy
he bank of tht supporting ver. TRUene
Marulan webLG meeting ent of Planni
on? ceed for conspproval.
ion starts imneeds to be
etion of the ro
waree Counci
was raised abded the follo
ed in the Units. An explosiossure (calledonstruction pstood to be ectricity Board
ge about Can
s prone to floood events o
n 40 years –
nyonleigh Rocould becomroute for he
nsible for ong
oad felt it imanges to the
xamine Canyothe NSW Ro
gy
he river? the Project A
ergy’s propos
bsite? minutes, prong website.
struction by 3
mmediately? completed boad upgrade
l’s road cons
bout accidenowing respon
ted States, pon occurred
d a blow dowprocess whenemployees/sud, who made
nyonleigh Ro
ooding. It hasoccurred fourwith water o
ad. The roade much more
eavy vehicles
going mainte
mportant to seroad during
onleigh Roadoads & Traffic
Approvals resed concept
oject updatesIn the future
31 March 20
before constre before or ar
sultants whic
ts in USA ganse:
particularly duduring clean
wn within the n a spark occub contractorthe following
oad specifical
s not been er times acrosover parts of
d is currentlye difficult.
s who are see
enance of the
et an appropthe project
d in the comc Authority (
equires the paplan will me
s, and links toe, newsletter
12. However
ruction commround Notice
ch TRUenergy
as turbine ele
uring the ning of the pi
industry) tocurred. The ars) and was g recommen
ly its conditio
elevated far ss the road. Canyonleigh
y gravel whic
eking to avoi
e whole of
priate speed (80 kilometr
ing few weekRTA) when
ad to be at leeet this
o the existingrs may be
r, this date is
mences on the to Proceed
y agreed to
ectricity
ipeline remove accident in
ndations
ons,
h
h is
id
es
ks.
east
g
s
he for
•
Questions a
–
–
–
–
–
– usin– whe– und– Ens
To our knowunderstandiprocess invodebris and sbuilt vent st
and comment
Q: What areA: As we prthe project and or expomanagementhe design i Q: Has a haA: The projdesign is finproject’s co Q: What areMarulan? A: TRUenerTRUenergy in time. Themanagemenfoam supprerural fire sestorages tha Q: I underswill not be mor emergentechnologie A: It is envibe able to roperation caensuring fasbe in a cleacircuit televonsite as barequirement Q: Will you be putting iteam may dA: Once theservices in mand systemprocedures strategies. Tour insurersenvironmen
ng products oen using natdertake ventisure a clear a
wledge an acing that we folved pushinscale. Once ctack by the p
nts from CLG
e your worstrogress the drisks during
osure. This wnt plan. A suis finalised.
azard analysiject’s environnalised a haznstruction an
e your hazar
rgy concept pwill not be p
e concept plant system thaession as reqrvices in moat will be ava
tand from thmanned 24 hcy situationss rely on ele
saged that Trespond to haapability whist reaction rered area, ha
vision cameraack-up in thets.
be able to sn place? As w
draw on us foe design is finmore technics that will bewill comply wThe station iss will do everntal safety. O
other than nural gas, to lng to avoid a
and safe env
ccident of thifollow differeg pipe scrubcleaned the ppipeline oper
members to
case scenardevelopment each stage o
will be develommary of th
s been carrienmental asseard analysis nd operation
d manageme
plan has madprogressing wan includes aat will conforquired. Oncere technical dailable to me
he last meetinhours a day. s if they arosctricity?
TRUenergy eazardous/emch will relay esponses to eve automate
as (CCTV). The event of a l
peak at the nwe are from or support. nalised TRUecal detail the e available towith Australis a very signrything we n
Once we have
natural gas tolimit the amoa hazardous
vironment du
is kind has nent processesbbers (pigs) tpipe was purrator.
o TRUenergy
rios in your pof the Maru
of developmeoped as part he key risks w
ed out? essment incluwill be comp
ns manageme
ent measure
de allowancewith approvaa comprehenrm to Austra
e the design detail the pro
eet potential
ng the plant Where woul
se? This area
mployees wimergency situ
sensor inforemergency e
ed fire proteche final desigloss of auxilia
next meetingemergency
energy will o proposed in
o meet potenan standards
nificant inveseed to do toe determined
o clear the piount coming cloud. ring the clea
ot occurred s in Australiathrough the prged of air us
y
planning for Tlan Project rent and mitigof the Projec
will be presen
uded a hazarpleted and reent plan.
s for storing
e for Diesel toals to use Diesive and aut
alian Standaris finalised Toposed fire mthreats.
will operate d people be has many b
ll be living auations quickrmation to TRevents and action equipmgn will includary power to
g about the eservices in s
utline to the ncident manantial threats.s, will be fulltment on the protect this
d our approa
peline. out
aning process
in Australia aa. At Tallawapipe with comsing natural
TRUenergy Misk registers gation strategct’s constructnted to the C
rd assessmenesults incorpo
diesel onsite
o be stored oesel as a backomated fire sds and includ
TRUenergy wmanagement
with very fecoming from
blackouts - w
nd working ikly. The site wRUenergy oputomated shent and be m
de batteries/so the site for
emergency surrounding v
CLG and theagement systAll hazard any automatic e part of TRUinvestment ch to safety
s.
and it is our rra the cleanmpressed airgas and a pu
Marulan? are created
egies to reduction and opeCLG in the fu
nt. Once TRUorated into t
e at TRUener
onsite howevk-up fuel at tsuppression de both wate
will outline to t system and
ew people onm to managewould monito
n the local awill have rem
peration centhutdowns. Thmonitored bysmall diesel gall emergen
services that villages, your
e local rural ftem water stnd emergencand include
Uenergy andand ensure and emerge
ning r to clean urpose
to identify ce impact erations uture once
Uenergy’s the
rgy
ver this point
er and the local
d water
nsite and hazards ring
area and mote res he site will y closed generators cy
you will r response
fire torages cy mitigation we and public and
ency
–
–
–
–
–
–
Brendan Blagroup would
•
Res
• Res • Res
procedures emergency Comment frif you are g A: Your com Comment frfire service Therefore thoperation st
Preliminary made.
Q: Is a timeA: The timeimpact on s Q: Can youA: TRUenerbe subject t Q: It is surpwould theseA: The Projeconstruction Q: Did TRUeA: No. TRUa parcel of lwith that or Q: During th100 decibelA: During codecibels quoAustralian Sincludes proapproved byProject App1:00pm on been given impact be re
akeley from Ed like followe
Community land adjace
sponse: This issues, espoption furth
Computer msponse: Comp
Additional insponse: Majo
TRUenergy wservices to d
rom CLG meoing to begin
mment has b
rom Wayne Uin this area ihe company tage (both in
discussions
etable for conetable for constakeholders
u confirm conrgy is targetinto TRUenerg
prising you ae not destroyect Approvaln on the site
energy purchUenergy is noland nearby rganisation a
he constructs? onstruction noted as an eStandards. A ocedures to my the NSW D
provals limits Saturdays unfor Sundays equired loca
Elton Consulted up. Respo
access to thnt to the devland is curre
pecially duringther with the
modelling of tmputer modell
nformation oor constructio
will meet witdo a site orie
mber: With rn constructio
een noted.
Urle, Captainis largely volwill need to
n terms of pr
with TRUene
nstruction avnstruction is will be prese
nstruction wing a notice ty Board App
re going to ty the tar? s clearly stipcan comme
hase the Daiot familiar wiis still owneds to the stat
ion period, w
noise levels mxample. All cConstruction
manage and Director-Gene
constructionnless otherwand public hl residents w
ting asked thonses were:
he river and rvelopment siently leased tng the constru
Community
the build. lling is not av
on the constron milestones
th local stakeentation and
respect thereon so soon.
n, Big Hill Ruunteers and be able to s
rocesses and
ergy indicate
vailable? still developm
ented to the
ill begin in Mto proceed oproval.
tar Canyonle
pulate that Cance.
sy Bank site?ith the Daisyd by Delta Entus of this sit
will the noise
may exceed construction n and Enviromitigate con
eral before con activity to 7wise approvedholidays. Showill be consult
he group if th
riverbank (foite. to a third pa
ruction periodonce constru
vailable at th
ruction phasies will be prov
eholders to dinduction.
e seems to b
ral Fire Brigamost people
suppress fire equipment)
e sufficient pr
ment and anCLG once it
March? n constructio
igh Road bef
anyonleigh r
? y Bank site honergy. You ste.
e level be hig
35 decibels oequipment wnmental Mannstruction noonstruction c7:00am – 6:0d by the Direould out of hoted.
here were an
or recreationa
arty and TRUed. However, Truction activit
his point in th
ng. ovided to CLG
discuss safety
be a lack of d
ade: As previe live away fronsite in bot.
reparations a
n outline of thhas been fin
on by the 31
fore heavy lo
oad will need
owever it is ohould make
her than 35
on occasionswill be silencenagement Plaoise impacts wcan commen00pm on weeector-Generaours work w
ny requests f
al use) throu
energy needsTRUenergy isties are comp
he project.
G meeting on
y. We will als
detail on you
iously explainrom the areath constructi
and planning
he program analised.
March 2011
oaders come
d to be seale
our understayour enquiri
decibels, for
s but not the ed in accordaan (CEMP) thwill be devel
nce on the Sitekdays and 8
al. No approvwhich has a n
for informatio
ugh TRUener
ds to consideris happy to epleted.
nce they have
so invite
r proposal
ned, the a. on and
are being
and its
. This will
in –
ed before
anding that es directly
r example
100 ance with hat loped and te. The 8:00am – val has oise
on that the
gy owned
er safety explore this
ve been
• Res
•
5 CloThe meetingand input. A(venue to bThursdays a
finalised.
A Plan of Msponse: A Pla
environmenManageme
Comment frfor Our NatTRUenergy when plann
ose and nexg closed at aA target datebe advised) wat 4:30pm w
anagement fan of Manage
ental impacts ent Plan and
rom Sydney ion) direct seto contact th
ning for the E
xt meeting approximatelye of Thursdaywith a note thill be a suita
for the rehabement can onare known. Twill be prese
University Laeeded part ohe CatchmenEnvironmenta
y 6:20 pm. By 8th Decembhat Wednesdble alternativ
bilitation of tonly be comp
This will formented to the
andcare: Conof the TRUennt Managemeal Manageme
Brendan Blakber has beenday is difficulve regular m
he constructpleted once thm part of theCLG after co
ntractors for ergy owned ent Authorityent Plan.
keley thankedn set by TRUet for some peeting date.
ion zone. he design is fe Project’s Enompletion.
a previous wland. A requ
y and Sydney
d all participaenergy for theople to atte
finalised andnvironmental
wildlife projecuest was mady University L
ants for theihe next meetend. The gro
d all l
ct (Caring de for Landcare
r attendanceting of the C
oup agreed
e LG
oo
energy
Introducing theTRUenergyMarulan OCGTProject14 September 2OLt
Time
4:30pm
6:30pm
Item No
1
2
3
4
5
6
AGENDA
Topic
Welcome & Introductions
Marulan Project Update
Introducing the TRUenergy Marulan CLG
Discussion about the CLG and MarulanProject
Other Matters
Next Steps, Thank you and Close
PresenterBrendan BlakelyElton Consulting
Marcello DiamanteTRUenergy
Brendan BlakelyTRUenergy
Ail
Brendan BlakelyElton Consulting
TRUenergy - Marulan Community Update
Item 1: Welcome & Introductions
TRUenergy - Marulan Community Update
4
Item 2= Marulan Project Update
TRUenergy - Marulan Community Update
TRUenergy OverviewLFG Ei\ D
TRUenergy reta¡l markets
Coal-fired power station
Gas-fired power station(stage A)
Stage B (proposed)
Gas-fired power station
Offtake Coal-firedpower stations
Ofüake Gas-firedpower station
Development & managementof wind assets in Australia
10o/o equity in Paralana project
Proposal for solar powerstation
5
Customers
Yallourn
Tallawarra
Hallett
Delta Western Gentrader(Mt Piper & Wallerawang)
Newport & Jeeralang
Wind farmsWaterlooCathedral Rocks
Petratherm
Mallee Solar Park
2.8 million customer accounts
ÇA
4L,48O
435
500
203
2,400
966
r44
30
180
50lar Flagsh¡ps Program(proposed)
lhermal Power 5t¿tions
Renewables
Upslream Gas
& Gas Slorage
QLD
A_
.- Jeeralang
MelbourneHead Office
- ,tb'TASMÀNIAHobart a
c5MExplorat¡onAcreå9e
Waterloo
lona Gas storageIona gas storage
Eastern Star Gas
Upstream gas
22 PJ gas storage facility
207o permits
Equity in Queensland CSM developments
Newport
RETAIL ASSETS
ELECTRTCITY ASSETS (MW)
GAS ASSETS
TRUenergy - Marulan Commun¡ty Update
Marulan Project DevelopmentProject Background (Recap)
TRUenergy acquired the MarulanDevelopment Site from the State last yearwith formal transfer completed in March20tL.
The Marulan site was originally developed as2 stand alone & separately owned Projects(by Delta Electricity and Energy Australia) onthe same land title.
Site t: 2x OCGT ) Peaking Plant only
Site 2: 2x OCGT à CCGT Conversion
TRUenergy will continue to progressdevelopment of the Project and is conductinga concept review to identify improvementsthat can be made as a single owner of theproject and complete necessary connectionlicences.
II -.\',\.
\{LI
't ..
¡riu¡ulFrr I i1i-1 ri;_.J
.l
TRUenergy - Marulan Community Update
Concept Review r Site LayoutPreliminary Findings
. The existing approved site layout iswide enough to accommodate all 4 E
Class turbines on 1 site.
Benefits
Construction lay down area can sit onsecond site reducing habitat removal.
Second site can accommodateevaporation ponds which can be used toreduce trucking requirements for rejectwater.
Will require slight alteration to theproposed electrical line design but stillwithin the approved corridor.
Improved Visual.
TRUenergy will be discussing thisproposal with DoP once the conceptplan is finalised.
TRUenergy - Marulan Community Update
Concept Review r Services CorridorPrelim ina ry assessmentsindicate that changes to sitelayout can save at least 5 Ha invegetation. Savings generated from
relocating construction laydown area to within the sitelayout
Preliminary Geotech work willbe com pleted to fina liseconcept layout and proposedservices corridor.
TRUenergy will engage a DoPapproved IndependentEnviron menta I Representativebefore construction hascommenced.
)
Concept Review r GaslWater Pipeline RoutePipeline Routes still being finalisedwith landowners
. Working directly with affectedlandholders on identifying an agreedpipeline route to the Power Station
. Need to strike a balance btwgovern ment a pproved corridor,landholder requirements andenvironmental impact.
TRUenergy to submit pipeline licenceapplication once route is finalised.
. Advertisements will be issued at thetime of application.
TRUenergy - Marulan Community Update
10
1.
2.
3.
4.
5.
6.
Key Project Activities for next 3 months:
Scope the required works to upgrade Canyonleigh Rd.
Preliminary geotechnical surveys to support concept plan layout and services corridor.
DoP approval of the Independent Environmental Representative (IER).
Discuss concept with DoP.
Complete pipeline licence application.
Arrange Marulan Project website by early December 2011.
Subject to market conditions, TRUenergy is targeting Power Station Commercial Operationin 20L4.
:\.: TRUenergy - Marulan Community Update
11
Item 3: Marulan CLG
TRUenergy - Marulan Community Update