Item Descripción
1 01 OBRAS PROVICIONALES
2 01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m INCL. INSTALACION
3 01.02 ALQUILER DE OFICINA Y ALMACEN
4 01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO
5 02 SEGURIDAD Y SALUD
6 02.01 SEÑALIZACION EN OBRA DURANTE LA EJECUCION
7 02.02 EQUIPOS DE PROTECCION INDIVIDUAL
8 03 PISTAS DE CONCRETO
9 03.01 TRABAJOS PRELIMINARES
10 03.01.01 LIMPIEZA DE TERRENO MANUAL
11 03.01.02 TRAZO Y REPLANTEO PRELIMINAR
12 03.02 MOVIMIENTO DE TIERRAS
13 03.02.01 CORTE MASIVO DE TERRENO A MÁQUINA H PROM.=0.30 M A NIVEL DE LA SUB RASANTE
14 03.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
15 03.03 MEJORAMIENTO DE LA SUB-RASANTE
16 03.03.01 PERFILADO, RIEGO Y COMPACTADO DE SUB-RASANTE
17 03.04 BASE E=0.20m
18 03.04.01 RELLENO CON MATERIAL BASE (PRESTAMO)
19 03.04.02 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
20 03.05 PISTAS DE CONCRETO E=.20m
21 03.05.01 LOSA PAVIMENTO - ENCONFRADO Y DESENCOFRADO
22 03.05.02 LOSA PAVIMENTO - CONCRETO f'c=210 kg/cm2
23 03.05.03 LOSA PAVIMENTO - ACERO DE REFUERZO fy=4200 kg/cm2.
24 03.05.04 JUNTAS DE DILATACION
25 04 VEREDAS DE CONCRETO
26 04.01 TRABAJOS PRELIMINARES
27 04.01.01 LIMPIEZA DE TERRENO MANUAL
28 04.01.02 TRAZO Y REPLANTEO PRELIMINAR
29 04.01.03 DEMOLICION DE VEREDA ANTIGUA
30 04.02 MOVIMIENTO DE TIERRAS
31 04.02.01 RELLENO CON MATERIAL DE PRESTAMO PARA VEREDAS
32 04.02.02 EXTENDIDO, RIEGO Y COMPACTADO PARA VEREDAS
33 04.02.03 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
34 04.03 OBRAS DE CONCRETO SIMPLE
35 04.03.01 VEREDAS - ENCONFRADO Y DESENCOFRADO
36 04.03.02 VEREDAS - CONCRETO f'c=175 kg/cm2
37 04.03.03 JUNTAS DE DILATACION
38 05 MUROS DE CONTENCION
39 05.01 MUROS DE CONTENCION "MC-01"
40 05.01.01 TRABAJOS PRELIMINARES
41 05.01.01.01 LIMPIEZA DE TERRENO MANUAL
42 05.01.01.02 TRAZO Y REPLANTEO PRELIMINAR
43 05.01.02 MOVIMIENTO DE TIERRAS
44 05.01.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
45 05.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
46 05.01.02.03 RELLENO CON MATERIAL BASE (PRESTAMO)
47 05.01.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
48 05.01.03 CONCRETO SIMPLE
49 05.01.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
50 05.01.04 CONCRETO ARMADO
51 05.01.04.01 MUROS REFORZADOS INCLUYE ZAPATA
52 05.01.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2
53 05.01.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
54 05.01.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2
55 05.01.04.01.04 JUNTAS DE DILATACION
56 05.01.04.02 VEREDA DE CONCRETO ARMADO
57 05.01.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2
58 05.01.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO
59 05.01.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2.
60 05.01.04.02.04 BARANDA METALICA INC. PINTURA
61 05.02 MUROS DE CONTENCION "MC-02"
62 05.02.01 TRABAJOS PRELIMINARES
63 05.02.01.01 LIMPIEZA DE TERRENO MANUAL
64 05.02.01.02 TRAZO Y REPLANTEO PRELIMINAR
65 05.02.02 MOVIMIENTO DE TIERRAS
66 05.02.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
67 05.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
68 05.02.02.03 RELLENO CON MATERIAL BASE (PRESTAMO)
69 05.02.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
70 05.02.03 CONCRETO SIMPLE
71 05.02.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
72 05.02.04 CONCRETO ARMADO
73 05.02.04.01 MUROS REFORZADOS INCLUYE ZAPATA
74 05.02.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2
75 05.02.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
76 05.02.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2
77 05.02.04.01.04 JUNTAS DE DILATACION
78 05.02.04.02 VEREDA DE CONCRETO ARMADO
79 05.02.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2
80 05.02.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO
81 05.02.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2.
82 05.02.04.02.04 BARANDA METALICA INC. PINTURA
83 05.03 MUROS DE CONTENCION "MC-03"
84 05.03.01 TRABAJOS PRELIMINARES
85 05.03.01.01 LIMPIEZA DE TERRENO MANUAL
86 05.03.01.02 TRAZO Y REPLANTEO PRELIMINAR
87 05.03.02 MOVIMIENTO DE TIERRAS
88 05.03.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
89 05.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
90 05.03.02.03 RELLENO CON MATERIAL BASE (PRESTAMO)
91 05.03.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
92 05.03.03 CONCRETO SIMPLE
93 05.03.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
94 05.03.04 CONCRETO ARMADO
95 05.03.04.01 MUROS REFORZADOS INCLUYE ZAPATA
96 05.03.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2
97 05.03.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
98 05.03.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2
99 05.03.04.01.04 JUNTAS DE DILATACION
100 05.03.04.02 VEREDA DE CONCRETO ARMADO
101 05.03.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2
102 05.03.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO
103 05.03.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2.
104 05.03.04.02.04 BARANDA METALICA INC. PINTURA
105 05.04 MUROS DE CONTENCION "MC-04"
106 05.04.01 TRABAJOS PRELIMINARES
107 05.04.01.01 LIMPIEZA DE TERRENO MANUAL
108 05.04.01.02 TRAZO Y REPLANTEO PRELIMINAR
109 05.04.02 MOVIMIENTO DE TIERRAS
110 05.04.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
111 05.04.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
112 05.04.02.03 RELLENO CON MATERIAL BASE (PRESTAMO)
113 05.04.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
114 05.04.03 CONCRETO SIMPLE
115 05.04.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
116 05.04.04 CONCRETO ARMADO
117 05.04.04.01 MUROS REFORZADOS INCLUYE ZAPATA
118 05.04.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2
119 05.04.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
120 05.04.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2
121 05.04.04.01.04 JUNTAS DE DILATACION
122 05.04.04.02 VEREDA DE CONCRETO ARMADO
123 05.04.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2
124 05.04.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO
125 05.04.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2.
126 05.04.04.02.04 BARANDA METALICA INC. PINTURA
127 05.05 MUROS DE CONTENCION "MC-05"
128 05.05.01 TRABAJOS PRELIMINARES
129 05.05.01.01 LIMPIEZA DE TERRENO MANUAL
130 05.05.01.02 TRAZO Y REPLANTEO PRELIMINAR
131 05.05.02 MOVIMIENTO DE TIERRAS
132 05.05.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
133 05.05.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
134 05.05.02.03 RELLENO CON MATERIAL BASE (PRESTAMO)
135 05.05.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
136 05.05.03 CONCRETO SIMPLE
137 05.05.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
138 05.05.04 CONCRETO ARMADO
139 05.05.04.01 MUROS REFORZADOS INCLUYE ZAPATA
140 05.05.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2
141 05.05.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
142 05.05.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2
143 05.05.04.01.04 JUNTAS DE DILATACION
144 05.05.04.02 VEREDA DE CONCRETO ARMADO
145 05.05.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2
146 05.05.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO
147 05.05.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2.
148 05.05.04.02.04 BARANDA METALICA INC. PINTURA
149 05.06 MUROS DE CONTENCION "MC-06"
150 05.06.01 TRABAJOS PRELIMINARES
151 05.06.01.01 LIMPIEZA DE TERRENO MANUAL
152 05.06.01.02 TRAZO Y REPLANTEO PRELIMINAR
153 05.06.02 MOVIMIENTO DE TIERRAS
154 05.06.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
155 05.06.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
156 05.06.02.03 RELLENO CON MATERIAL BASE (PRESTAMO)
157 05.06.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
158 05.06.03 CONCRETO SIMPLE
159 05.06.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
160 05.06.04 CONCRETO ARMADO
161 05.06.04.01 MUROS REFORZADOS INCLUYE ZAPATA
162 05.06.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2
163 05.06.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
164 05.06.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2
165 05.06.04.01.04 JUNTAS DE DILATACION
166 05.06.04.02 VEREDA DE CONCRETO ARMADO
167 05.06.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2
168 05.06.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO
169 05.06.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2.
170 05.06.04.02.04 BARANDA METALICA INC. PINTURA
171 05.07 MUROS DE CONTENCION "MC-07"
172 05.07.01 TRABAJOS PRELIMINARES
173 05.07.01.01 LIMPIEZA DE TERRENO MANUAL
174 05.07.01.02 TRAZO Y REPLANTEO PRELIMINAR
175 05.07.02 MOVIMIENTO DE TIERRAS
176 05.07.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
177 05.07.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
178 05.07.02.03 RELLENO CON MATERIAL BASE (PRESTAMO)
179 05.07.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
180 05.07.03 CONCRETO SIMPLE
181 05.07.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
182 05.07.04 CONCRETO ARMADO
183 05.07.04.01 MUROS REFORZADOS INCLUYE ZAPATA
184 05.07.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2
185 05.07.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
186 05.07.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2
187 05.07.04.01.04 JUNTAS DE DILATACION
188 05.07.04.02 VEREDA DE CONCRETO ARMADO
189 05.07.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2
190 05.07.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO
191 05.07.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2.
192 05.07.04.02.04 BARANDA METALICA INC. PINTURA
193 05.08 MUROS DE CONTENCION "MC-08"
194 05.08.01 TRABAJOS PRELIMINARES
195 05.08.01.01 LIMPIEZA DE TERRENO MANUAL
196 05.08.01.02 TRAZO Y REPLANTEO PRELIMINAR
197 05.08.02 MOVIMIENTO DE TIERRAS
198 05.08.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
199 05.08.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
200 05.08.02.03 RELLENO CON MATERIAL BASE (PRESTAMO)
201 05.08.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE
202 05.08.03 CONCRETO SIMPLE
203 05.08.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
204 05.08.04 CONCRETO ARMADO
205 05.08.04.01 MUROS REFORZADOS INCLUYE ZAPATA
206 05.08.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2
207 05.08.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS)
208 05.08.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2
209 05.08.04.01.04 JUNTAS DE DILATACION
210 05.08.04.02 VEREDA DE CONCRETO ARMADO
211 05.08.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2
212 05.08.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO
213 05.08.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2.
214 05.08.04.02.04 BARANDA METALICA INC. PINTURA
215 06 OBRAS DE DRENAJE
216 06.01 CANALETA DE CONRETO (DRENAJE)
217 06.01.01 TRABAJOS PRELIMINARES
218 06.01.01.01 LIMPIEZA DE TERRENO MANUAL
219 06.01.01.02 TRAZO Y REPLANTEO PRELIMINAR
220 06.01.02 MOVIMIENTO DE TIERRAS
221 06.01.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
222 06.01.02.02 PERFILADO, RIEGO Y COMPACION DE SUB-RASANTE
223 06.01.02.03 RELLENO CON MATERIAL DE PRESTAMO
224 06.01.02.04 EXTENDIDO, RIEGO Y COMPACTADO
225 06.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
226 06.01.03 OBRAS DE CONCRETO SIMPLE
227 06.01.03.01 CANALETA - ENCONFRADO Y DESENCOFRADO
228 06.01.03.02 CANALETA - CONCRETO f'c=175 kg/cm2
229 06.01.03.03 JUNTAS DE DILATACION
230 06.02 CANAL DE RIEGO Y AGUAS PLUVIALES
231 06.02.01 TRABAJOS PRELIMINARES
232 06.02.01.01 LIMPIEZA DE TERRENO MANUAL
233 06.02.01.02 TRAZO Y REPLANTEO PRELIMINAR
234 06.02.01.03 DEMOLICION DE CANAL EXISTENTE
235 06.02.02 MOVIMIENTO DE TIERRAS
236 06.02.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
237 06.02.02.02 RELLENO CON MATERIAL DE PRESTAMO
238 06.02.02.03 EXTENDIDO, RIEGO Y COMPACTADO
239 06.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
240 06.02.03 OBRAS DE CONCRETO SIMPLE
241 06.02.03.01 CANAL - ENCONFRADO Y DESENCOFRADO
242 06.02.03.02 CANAL - CONCRETO f'c=175 kg/cm2
243 06.02.03.03 JUNTAS DE DILATACION
244 06.03 ALCANTARILLA DE CONCRETO
245 06.03.01 CAJAS RECEPTORA
246 06.03.01.01 TRABAJOS PRELIMINARES
247 06.03.01.01.01 TRAZO Y REPLANTEO PRELIMINAR
248 06.03.01.02 MOVIMIENTO DE TIERRAS
249 06.03.01.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
250 06.03.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
251 06.03.01.03 CONCRETO SIMPLE
252 06.03.01.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
253 06.03.01.04 CONCRETO ARMADO
254 06.03.01.04.01 CAJA - CONCRETO 210 kg/cm2
255 06.03.01.04.02 CAJA - ENCONFRADO Y DESENCOFRADO
256 06.03.01.04.03 CAJA - ACERO DE REFUERZO fy=4200 kg/cm2.
257 06.03.02 ALCANTARILLA METALICA TMC 18"
258 06.03.02.01 TRABAJOS PRELIMINARES
259 06.03.02.01.01 TRAZO Y REPLANTEO PRELIMINAR
260 06.03.02.02 MOVIMIENTO DE TIERRAS
261 06.03.02.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
262 06.03.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
263 06.03.02.02.03 CAMA DE APOYO PARA TUBERIAS DE REDES EXTERNAS
264 06.03.02.02.04 RELLENO COMPACTADO MANUAL- CON MATERIAL DE PRESTAMO/ PROTECCION DEL TUBO
265 06.03.02.03 ALCANTARILLA METALICA TMC 18"
266 06.03.02.03.01 ALCANTARILLA TMC D=18" C=16 R=14 m/día
267 06.03.03 EMBOQUILADO DE CONCRETO
268 06.03.03.01 TRABAJOS PRELIMINARES
269 06.03.03.01.01 TRAZO Y REPLANTEO PRELIMINAR
270 06.03.03.02 MOVIMIENTO DE TIERRAS
271 06.03.03.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO
272 06.03.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km.
273 06.03.03.02.03 PERFILADO, RIEGO Y COMPACION DE SUB-RASANTE
274 06.03.03.03 CONCRETO SIMPLE
275 06.03.03.03.01 EMBOQUILLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m
276 07 SEÑALIZACION Y SEGURIDAD EN PAVIMENTO
277 07.01 SEÑALIZACION HORIZONTAL EN PAVIMENTO
278 08 PRUEBA DE LABORATORIO
279 08.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
280 08.02 DISEÑO DE MEZCLA
281 08.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO)
282 09 VARIOS
283 09.01 NIVELACION DE BUZONES EN GENERAL
284 10 FLETES
285 10.01 FLETE TERRESTRE
286 11 IMPACTO AMBIENTAL
287 11.01 IMPACTO AMBIENTAL
288289290291292293294295296297298299300301302303304305306307308309310311312313314315316317318319320321322323324325326327328329330331332333334335
336337338339340341342343344345346347348349350351352353354355356357358359360361362363364365366367368369370371372373374375376377378379380381382383
384385386387388389390391392393394395396397398399400401402403404405406407408409410411412413414415416417418419420421422423424425426427428429430431
432433434435436437438439440441442443444445446447448449450451452453454455
Und. Metrado Precio (S/.) Parcial (S/.)2,551.77
u 1.00 551.77 551.77
mes 5.00 300.00 1,500.00
glb 1.00 500.00 500.00
2,476.00
m 300.00 1.92 576.00
u 20.00 95.00 1,900.00
259,150.16
4,302.00
m2 1,800.00 0.25 450.00
m2 1,800.00 2.14 3,852.00
58,764.02
m3 1,598.37 7.94 12,691.06
m3 1,997.96 23.06 46,072.96
5,958.00
m2 1,800.00 3.31 5,958.00
28,875.60
m3 360.00 57.56 20,721.60
m2 1,800.00 4.53 8,154.00
161,250.54
m2 60.00 34.68 2,080.80
m3 360.00 388.96 140,025.60
kg 1,939.58 6.80 13,189.14
m 1,500.00 3.97 5,955.00
29,445.59
4,077.38
m2 426.20 0.25 106.55
m2 426.20 2.14 912.07
m2 213.75 14.31 3,058.76
2,609.78
m3 12.79 59.57 761.90
m2 426.20 2.89 1,231.72
m3 26.72 23.06 616.16
22,758.43
m2 64.35 33.45 2,152.51
m3 63.93 318.35 20,352.12
m 63.93 3.97 253.80
404,127.04
22,556.03
36.57
m2 15.30 0.25 3.83
m2 15.30 2.14 32.74
7,690.25
m3 45.90 57.70 2,648.43
m3 57.38 23.06 1,323.18
m3 57.38 57.56 3,302.79
m2 91.80 4.53 415.85
741.99
m3 3.06 242.48 741.99
14,087.22
11,986.11
m3 12.51 394.23 4,931.82
m2 53.95 46.59 2,513.53
kg 941.31 4.71 4,433.57
m 27.00 3.97 107.19
2,101.11
m3 1.28 394.47 504.92
m2 7.16 46.59 333.58
kg 67.30 4.71 316.98
m 9.00 105.07 945.63
17,432.73
30.59
m2 12.80 0.25 3.20
m2 12.80 2.14 27.39
6,120.77
m3 38.40 57.70 2,215.68
m3 48.00 23.06 1,106.88
m3 48.00 57.56 2,762.88
m2 7.80 4.53 35.33
620.75
m3 2.56 242.48 620.75
10,660.62
8,775.54
m3 9.67 394.23 3,812.20
m2 39.90 46.59 1,858.94
kg 642.25 4.71 3,025.00
m 20.00 3.97 79.40
1,885.08
m3 1.14 394.47 449.70
m2 6.38 46.59 297.24
kg 63.18 4.71 297.58
m 8.00 105.07 840.56
17,754.36
30.59
m2 12.80 0.25 3.20
m2 12.80 2.14 27.39
6,442.40
m3 38.40 57.70 2,215.68
m3 48.00 23.06 1,106.88
m3 48.00 57.56 2,762.88
m2 78.80 4.53 356.96
620.75
m3 2.56 242.48 620.75
10,660.62
8,775.54
m3 9.67 394.23 3,812.20
m2 39.90 46.59 1,858.94
kg 642.25 4.71 3,025.00
m 20.00 3.97 79.40
1,885.08
m3 1.14 394.47 449.70
m2 6.38 46.59 297.24
kg 63.18 4.71 297.58
m 8.00 105.07 840.56
83,537.07
69.79
m2 29.20 0.25 7.30
m2 29.20 2.14 62.49
34,574.19
m3 213.16 57.70 12,299.33
m3 266.45 23.06 6,144.34
m3 266.45 57.56 15,336.86
m2 175.20 4.53 793.66
2,832.17
m3 11.68 242.48 2,832.17
46,060.92
44,175.84
m3 52.83 394.23 20,827.17
m2 127.14 46.59 5,923.45
kg 3,677.16 4.71 17,319.42
m 26.65 3.97 105.80
1,885.08
m3 1.14 394.47 449.70
m2 6.38 46.59 297.24
kg 63.18 4.71 297.58
m 8.00 105.07 840.56
59,875.55
61.07
m2 25.55 0.25 6.39
m2 25.55 2.14 54.68
30,252.40
m3 186.52 57.70 10,762.20
m3 233.14 23.06 5,376.21
m3 233.14 57.56 13,419.54
m2 153.30 4.53 694.45
2,478.15
m3 10.22 242.48 2,478.15
27,083.93
25,414.85
m3 28.37 394.23 11,184.31
m2 86.19 46.59 4,015.59
kg 2,154.24 4.71 10,146.47
m 17.25 3.97 68.48
1,669.08
m3 1.00 394.47 394.47
m2 5.60 46.59 260.90
kg 59.07 4.71 278.22
m 7.00 105.07 735.49
104,308.16
87.24
m2 36.50 0.25 9.13
m2 36.50 2.14 78.11
43,217.53
m3 266.45 57.70 15,374.17
m3 333.06 23.06 7,680.36
m3 333.06 57.56 19,170.93
m2 219.00 4.53 992.07
3,540.21
m3 14.60 242.48 3,540.21
57,463.18
55,142.08
m3 66.03 394.23 26,031.01
m2 155.78 46.59 7,257.79
kg 4,622.07 4.71 21,769.95
m 20.99 3.97 83.33
2,321.10
m3 1.43 394.47 564.09
m2 7.94 46.59 369.92
kg 71.42 4.71 336.39
m 10.00 105.07 1,050.70
53,739.69
68.12
m2 28.50 0.25 7.13
m2 28.50 2.14 60.99
19,066.80
m3 115.43 57.70 6,660.31
m3 144.28 23.06 3,327.10
m3 144.28 57.56 8,304.76
m2 171.00 4.53 774.63
2,764.27
m3 11.40 242.48 2,764.27
31,840.50
28,435.28
m3 30.65 394.23 12,083.15
m2 121.65 46.59 5,667.67
kg 2,259.25 4.71 10,641.07
m 10.93 3.97 43.39
3,405.22
m3 2.14 394.47 844.17
m2 11.84 46.59 551.63
kg 92.01 4.71 433.37
m 15.00 105.07 1,576.05
44,923.45
87.95
m2 36.80 0.25 9.20
m2 36.80 2.14 78.75
13,205.35
m3 79.12 57.70 4,565.22
m3 98.90 23.06 2,280.63
m3 98.90 57.56 5,692.68
m2 147.20 4.53 666.82
1,784.65
m3 7.36 242.48 1,784.65
29,845.50
24,735.73
m3 27.80 394.23 10,959.59
m2 110.40 46.59 5,143.54
kg 1,827.36 4.71 8,606.87
m 6.48 3.97 25.73
5,109.77
m3 3.20 394.47 1,262.30
m2 18.08 46.59 842.35
kg 124.95 4.71 588.51
m 23.00 105.07 2,416.61
22,340.07
15,692.03
328.50
m2 137.45 0.25 34.36
m2 137.45 2.14 294.14
2,830.89
m3 20.62 57.70 1,189.77
m2 137.45 3.19 438.47
m3 6.87 59.57 409.25
m2 137.45 2.89 397.23
m3 17.18 23.06 396.17
12,532.64
m2 109.96 37.17 4,087.21
m3 24.05 333.01 8,008.89
m 109.96 3.97 436.54
3,726.20
174.52
m2 14.50 0.25 3.63
m2 14.50 2.14 31.03
m3 3.63 38.53 139.86
346.92
m3 4.35 57.70 251.00
m3 0.73 59.57 43.49
m2 11.60 2.89 33.52
m3 0.82 23.06 18.91
3,204.76
m2 52.20 37.17 1,940.27
m3 3.63 333.01 1,208.83
m 14.02 3.97 55.66
2,921.84
701.18
1.73
m2 0.81 2.14 1.73
59.87
m3 0.69 57.70 39.81
m3 0.87 23.06 20.06
7.27
m3 0.03 242.48 7.27
632.31
m3 0.40 394.47 157.79
m2 7.04 46.59 327.99
kg 31.11 4.71 146.53
1,477.00
9.89
m2 4.62 2.14 9.89
461.14
m3 5.08 57.70 293.12
m3 6.35 23.06 146.43
m 1.49 4.34 6.47
m 1.49 10.15 15.12
1,005.97
m 6.60 152.42 1,005.97
743.66
5.14
m2 2.40 2.14 5.14
59.58
m3 0.60 57.70 34.62
m3 0.75 23.06 17.30
m2 2.40 3.19 7.66
678.94
m3 2.80 242.48 678.94
1,143.90
m2 62.00 18.45 1,143.90
2,129.60
u 12.00 30.00 360.00
u 4.00 367.40 1,469.60
u 2.00 150.00 300.00
814.23
u 9.00 90.47 814.23
1,000.00
glb 1.00 1,000.00 1,000.00
4,061.33
glb 1.00 4,061.33 4,061.33
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRAPROYECTO : “MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA ÚLTIMA CUADRA DE LA CALLE CONDEBAMBA AL KM. 0.35 DE LA CALLE AYMAS DE LAS URBANIZACIONES CONDEBAMBA Y AYMAS, DISTRITO Y PROVINCIA DE ABANCAY, REGIÓN APURIMAC”FECHA : NOVIEMBRE DEL 2015
ITEM PARTIDAS UndS/. / MESES
MES 1 MES 2 MES 3 MES 4 MES 5 MES 601 OBRAS PROVICIONALES 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.0001.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m INCL. INSTALACION u S/. 551.77 S/. 551.77 (100%) 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0001.02 ALQUILER DE OFICINA Y ALMACEN mes S/. 1,500.00 S/. 363.98 (24.27%) S/. 248.00 (16.53%) S/. 248.00 (16.53%) S/. 232.00 (15.47%) S/. 248.00 (16.53%) S/. 160.02 (10.67%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0001.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb S/. 500.00 S/. 500.00 (100%) 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0002 SEGURIDAD Y SALUD S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0002.01 SEÑALIZACION EN OBRA DURANTE LA EJECUCION m S/. 576.00 S/. 81.17 (14.09%) S/. 107.93 (18.74%) S/. 107.93 (18.74%) S/. 100.97 (17.53%) S/. 107.93 (18.74%) S/. 70.07 (12.16%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0002.02 EQUIPOS DE PROTECCION INDIVIDUAL u S/. 1,900.00 S/. 653.13 (34.38%) S/. 1,246.88 (65.63%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003 PISTAS DE CONCRETO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 450.00 S/. 393.63 (87.47%) S/. 56.37 (12.53%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 3,852.00 0.00 S/. 3,852.00 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.02.01 CORTE MASIVO DE TERRENO A MÁQUINA H PROM.=0.30 M A NIVEL DE LA SUB RASANTE m3 S/. 12,691.06 0.00 S/. 12,691.06 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 46,072.96 0.00 S/. 46,072.96 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.03 MEJORAMIENTO DE LA SUB-RASANTE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.03.01 PERFILADO, RIEGO Y COMPACTADO DE SUB-RASANTE m2 S/. 5,958.00 0.00 S/. 5,958.00 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.04 BASE E=0.20m S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.04.01 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 20,721.60 0.00 S/. 20,721.60 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.04.02 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 8,154.00 0.00 S/. 8,154.00 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.05 PISTAS DE CONCRETO E=.20m S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.05.01 LOSA PAVIMENTO - ENCONFRADO Y DESENCOFRADO m2 S/. 2,080.80 0.00 S/. 2,079.38 (99.93%) S/. 1.42 (0.07%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.05.02 LOSA PAVIMENTO - CONCRETO f'c=210 kg/cm2 m3 S/. 140,025.60 0.00 0.00 S/. 131,539.40 (93.94%) S/. 8,486.20 (6.06%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.05.03 LOSA PAVIMENTO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 13,189.14 0.00 0.00 S/. 13,189.14 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0003.05.04 JUNTAS DE DILATACION m S/. 5,955.00 0.00 0.00 0.00 S/. 5,422.63 (91.06%) S/. 532.37 (8.94%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004 VEREDAS DE CONCRETO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 106.55 0.00 S/. 106.55 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 912.07 0.00 S/. 912.07 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.01.03 DEMOLICION DE VEREDA ANTIGUA m2 S/. 3,058.76 0.00 S/. 3,058.76 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.02.01 RELLENO CON MATERIAL DE PRESTAMO PARA VEREDAS m3 S/. 761.90 0.00 S/. 761.90 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.02.02 EXTENDIDO, RIEGO Y COMPACTADO PARA VEREDAS m2 S/. 1,231.72 0.00 S/. 1,231.72 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.02.03 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 616.16 0.00 S/. 616.16 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.03 OBRAS DE CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.03.01 VEREDAS - ENCONFRADO Y DESENCOFRADO m2 S/. 2,152.51 0.00 S/. 2,152.51 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.03.02 VEREDAS - CONCRETO f'c=175 kg/cm2 m3 S/. 20,352.12 0.00 S/. 20,352.12 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0004.03.03 JUNTAS DE DILATACION m S/. 253.80 0.00 S/. 253.80 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005 MUROS DE CONTENCION S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01 MUROS DE CONTENCION "MC-01" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 3.83 0.00 S/. 3.83 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 32.74 0.00 S/. 32.74 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 2,648.43 0.00 S/. 1,323.76 (49.98%) S/. 1,324.67 (50.02%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 1,323.18 0.00 0.00 S/. 1,323.18 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.02.03 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 3,302.79 0.00 0.00 0.00 S/. 3,302.79 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 415.85 0.00 0.00 0.00 S/. 415.85 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 741.99 0.00 0.00 S/. 741.99 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.01 MUROS REFORZADOS INCLUYE ZAPATA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2 m3 S/. 4,931.82 0.00 0.00 S/. 4,931.82 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 S/. 2,513.53 0.00 0.00 S/. 2,513.53 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2 kg S/. 4,433.57 0.00 0.00 S/. 4,433.57 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.01.04 JUNTAS DE DILATACION m S/. 107.19 0.00 0.00 S/. 107.19 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.02 VEREDA DE CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2 m3 S/. 504.92 0.00 0.00 0.00 S/. 504.92 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO m2 S/. 333.58 0.00 0.00 0.00 S/. 333.58 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 316.98 0.00 0.00 0.00 S/. 316.98 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.01.04.02.04 BARANDA METALICA INC. PINTURA m S/. 945.63 0.00 0.00 0.00 S/. 945.63 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02 MUROS DE CONTENCION "MC-02" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 3.20 0.00 0.00 0.00 S/. 3.20 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 27.39 0.00 0.00 0.00 S/. 27.39 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 2,215.68 0.00 0.00 0.00 S/. 2,215.68 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 1,106.88 0.00 0.00 0.00 S/. 1,106.88 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.02.03 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 2,762.88 0.00 0.00 0.00 0.00 S/. 2,762.88 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 35.33 0.00 0.00 0.00 0.00 S/. 35.33 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 620.75 0.00 0.00 0.00 S/. 620.75 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.01 MUROS REFORZADOS INCLUYE ZAPATA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2 m3 S/. 3,812.20 0.00 0.00 0.00 S/. 3,812.20 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 S/. 1,858.94 0.00 0.00 0.00 S/. 1,858.94 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2 kg S/. 3,025.00 0.00 0.00 0.00 S/. 3,025.00 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.01.04 JUNTAS DE DILATACION m S/. 79.40 0.00 0.00 0.00 0.00 S/. 79.40 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.02 VEREDA DE CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2 m3 S/. 449.70 0.00 0.00 0.00 0.00 S/. 449.70 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO m2 S/. 297.24 0.00 0.00 0.00 0.00 S/. 297.24 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 297.58 0.00 0.00 0.00 0.00 S/. 297.58 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.02.04.02.04 BARANDA METALICA INC. PINTURA m S/. 840.56 0.00 0.00 0.00 0.00 S/. 840.11 (99.95%) S/. .45 (0.05%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03 MUROS DE CONTENCION "MC-03" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 3.20 0.00 S/. 3.20 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 27.39 0.00 S/. 27.39 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 2,215.68 0.00 S/. 1,328.95 (59.98%) S/. 886.73 (40.02%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 1,106.88 0.00 0.00 S/. 1,106.88 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.02.03 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 2,762.88 0.00 0.00 S/. 2,762.88 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 356.96 0.00 0.00 S/. 356.96 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 620.75 0.00 0.00 S/. 620.75 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.01 MUROS REFORZADOS INCLUYE ZAPATA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2 m3 S/. 3,812.20 0.00 0.00 S/. 3,812.20 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 S/. 1,858.94 0.00 0.00 S/. 1,858.94 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2 kg S/. 3,025.00 0.00 0.00 S/. 3,025.00 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.01.04 JUNTAS DE DILATACION m S/. 79.40 0.00 0.00 S/. 79.40 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.02 VEREDA DE CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2 m3 S/. 449.70 0.00 0.00 S/. 449.70 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO m2 S/. 297.24 0.00 0.00 S/. 297.24 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 297.58 0.00 0.00 S/. 297.58 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.03.04.02.04 BARANDA METALICA INC. PINTURA m S/. 840.56 0.00 0.00 0.00 S/. 840.56 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04 MUROS DE CONTENCION "MC-04" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 7.30 0.00 S/. 7.30 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 62.49 0.00 S/. 62.49 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 12,299.34 0.00 S/. 1,366.12 (11.11%) S/. 7,060.73 (57.41%) S/. 3,872.49 (31.49%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 6,144.34 0.00 0.00 0.00 S/. 6,144.34 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.02.03 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 15,336.86 0.00 0.00 0.00 0.00 S/. 15,305.00 (99.79%) S/. 31.86 (0.21%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 793.66 0.00 0.00 0.00 0.00 S/. 792.01 (99.79%) S/. 1.65 (0.21%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 2,832.17 0.00 0.00 0.00 S/. 2,832.17 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.01 MUROS REFORZADOS INCLUYE ZAPATA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2 m3 S/. 20,827.17 0.00 0.00 0.00 0.00 S/. 20,827.17 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 S/. 5,923.45 0.00 0.00 0.00 S/. 4,105.44 (69.31%) S/. 1,818.01 (30.69%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2 kg S/. 17,319.42 0.00 0.00 0.00 S/. 12,700.70 (73.33%) S/. 4,618.72 (26.67%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.01.04 JUNTAS DE DILATACION m S/. 105.80 0.00 0.00 0.00 0.00 S/. 105.80 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.02 VEREDA DE CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2 m3 S/. 449.70 0.00 0.00 0.00 0.00 0.00 S/. 449.70 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO m2 S/. 297.24 0.00 0.00 0.00 0.00 0.00 S/. 297.24 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 297.58 0.00 0.00 0.00 0.00 0.00 S/. 297.58 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.04.04.02.04 BARANDA METALICA INC. PINTURA m S/. 840.56 0.00 0.00 0.00 0.00 0.00 S/. 840.56 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.00
PRESUPUESTOS/.
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRAPROYECTO : “MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA ÚLTIMA CUADRA DE LA CALLE CONDEBAMBA AL KM. 0.35 DE LA CALLE AYMAS DE LAS URBANIZACIONES CONDEBAMBA Y AYMAS, DISTRITO Y PROVINCIA DE ABANCAY, REGIÓN APURIMAC”FECHA : NOVIEMBRE DEL 2015
ITEM PARTIDAS UndS/. / MESES
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6PRESUPUESTO
S/.
05.05 MUROS DE CONTENCION "MC-05" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 6.39 0.00 S/. 6.39 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 54.68 0.00 S/. 54.68 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRAPROYECTO : “MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA ÚLTIMA CUADRA DE LA CALLE CONDEBAMBA AL KM. 0.35 DE LA CALLE AYMAS DE LAS URBANIZACIONES CONDEBAMBA Y AYMAS, DISTRITO Y PROVINCIA DE ABANCAY, REGIÓN APURIMAC”FECHA : NOVIEMBRE DEL 2015
ITEM PARTIDAS UndS/. / MESES
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6PRESUPUESTO
S/.
05.05.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 10,762.20 0.00 S/. 1,373.42 (12.76%) S/. 7,098.47 (65.96%) S/. 2,290.31 (21.28%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 5,376.21 0.00 0.00 0.00 S/. 5,376.21 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.02.03 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 13,419.54 0.00 0.00 0.00 0.00 S/. 13,419.54 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 694.45 0.00 0.00 0.00 0.00 S/. 694.45 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 2,478.15 0.00 0.00 0.00 S/. 2,478.15 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.01 MUROS REFORZADOS INCLUYE ZAPATA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2 m3 S/. 11,184.31 0.00 0.00 0.00 S/. 11,184.31 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 S/. 4,015.59 0.00 0.00 0.00 S/. 4,015.59 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2 kg S/. 10,146.47 0.00 0.00 0.00 S/. 10,146.47 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.01.04 JUNTAS DE DILATACION m S/. 68.48 0.00 0.00 0.00 0.00 S/. 68.48 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.02 VEREDA DE CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2 m3 S/. 394.47 0.00 0.00 0.00 0.00 S/. 394.47 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO m2 S/. 260.90 0.00 0.00 0.00 0.00 S/. 260.90 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 278.22 0.00 0.00 0.00 0.00 S/. 278.22 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.05.04.02.04 BARANDA METALICA INC. PINTURA m S/. 735.49 0.00 0.00 0.00 0.00 S/. 571.15 (77.66%) S/. 164.34 (22.34%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06 MUROS DE CONTENCION "MC-06" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 9.13 0.00 S/. 9.13 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 78.11 0.00 S/. 78.11 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 15,374.17 0.00 S/. 2,712.15 (17.64%) S/. 12,662.02 (82.36%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 7,680.36 0.00 0.00 S/. 7,680.36 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.02.03 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 19,170.93 0.00 0.00 0.00 0.00 S/. 19,170.93 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 992.07 0.00 0.00 0.00 0.00 S/. 992.07 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 3,540.21 0.00 0.00 S/. 3,540.21 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.01 MUROS REFORZADOS INCLUYE ZAPATA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2 m3 S/. 26,031.01 0.00 0.00 0.00 S/. 22,329.73 (85.78%) S/. 3,701.28 (14.22%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 S/. 7,257.79 0.00 0.00 0.00 S/. 7,257.79 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2 kg S/. 21,769.95 0.00 0.00 S/. 2,296.57 (10.55%) S/. 19,473.38 (89.45%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.01.04 JUNTAS DE DILATACION m S/. 83.33 0.00 0.00 0.00 0.00 S/. 83.33 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.02 VEREDA DE CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2 m3 S/. 564.09 0.00 0.00 0.00 0.00 S/. 564.09 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO m2 S/. 369.92 0.00 0.00 0.00 0.00 S/. 369.92 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 336.39 0.00 0.00 0.00 0.00 S/. 336.39 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.06.04.02.04 BARANDA METALICA INC. PINTURA m S/. 1,050.70 0.00 0.00 0.00 0.00 0.00 S/. 1,050.70 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07 MUROS DE CONTENCION "MC-07" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 7.13 0.00 S/. 7.13 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 60.99 0.00 S/. 60.99 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 6,660.31 0.00 S/. 1,377.52 (20.68%) S/. 5,282.79 (79.32%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 3,327.10 0.00 0.00 S/. 3,327.10 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.02.03 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 8,304.76 0.00 0.00 0.00 S/. 8,287.55 (99.79%) S/. 17.21 (0.21%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 774.63 0.00 0.00 0.00 S/. 773.02 (99.79%) S/. 1.61 (0.21%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 2,764.27 0.00 0.00 S/. 2,764.27 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.01 MUROS REFORZADOS INCLUYE ZAPATA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2 m3 S/. 12,083.15 0.00 0.00 0.00 S/. 12,083.15 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 S/. 5,667.67 0.00 0.00 S/. 3,059.22 (53.98%) S/. 2,608.45 (46.02%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2 kg S/. 10,641.07 0.00 0.00 S/. 7,449.01 (70%) S/. 3,192.06 (30%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.01.04 JUNTAS DE DILATACION m S/. 43.39 0.00 0.00 0.00 S/. 43.39 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.02 VEREDA DE CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2 m3 S/. 844.17 0.00 0.00 0.00 0.00 S/. 844.17 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO m2 S/. 551.63 0.00 0.00 0.00 0.00 S/. 551.63 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 433.37 0.00 0.00 0.00 0.00 S/. 433.37 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.07.04.02.04 BARANDA METALICA INC. PINTURA m S/. 1,576.05 0.00 0.00 0.00 0.00 S/. 1,576.05 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08 MUROS DE CONTENCION "MC-08" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 9.20 0.00 S/. 9.20 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 78.75 0.00 S/. 78.75 (100%) 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 4,565.22 0.00 S/. 1,369.09 (29.99%) S/. 3,196.13 (70.01%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 2,280.63 0.00 0.00 S/. 2,280.63 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.02.03 RELLENO CON MATERIAL BASE (PRESTAMO) m3 S/. 5,692.68 0.00 0.00 0.00 S/. 5,692.68 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.02.04 EXTENDIDO, RIEGO Y COMPACTADO DE BASE m2 S/. 666.82 0.00 0.00 0.00 S/. 666.82 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 1,784.65 0.00 0.00 S/. 1,784.65 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.01 MUROS REFORZADOS INCLUYE ZAPATA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.01.01 MUROS DE CONTENCIÓN - CONCRETO 210 kg/cm2 m3 S/. 10,959.59 0.00 0.00 S/. 7,352.31 (67.09%) S/. 3,607.28 (32.91%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.01.02 MUROS DE CONTENCIÓN - ENCOFRADO Y DESENCOFRADO (DOS CARAS) m2 S/. 5,143.54 0.00 0.00 S/. 5,143.54 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.01.03 MUROS DE CONTENCIÓN - ACERO Fy=4200 kg/cm2 kg S/. 8,606.87 0.00 0.00 S/. 8,606.87 (100%) 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.01.04 JUNTAS DE DILATACION m S/. 25.73 0.00 0.00 0.00 S/. 25.73 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.02 VEREDA DE CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.02.01 VEREDA DE CONCRETO ARMADO - CONCRETO 210 kg/cm2 m3 S/. 1,262.30 0.00 0.00 0.00 S/. 1,262.30 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.02.02 VEREDAS DE CONCRETO ARMADO - ENCONFRADO Y DESENCOFRADO m2 S/. 842.35 0.00 0.00 0.00 S/. 842.35 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.02.03 VEREDA DE CONCRETO ARMADO - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 588.51 0.00 0.00 0.00 S/. 588.51 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0005.08.04.02.04 BARANDA METALICA INC. PINTURA m S/. 2,416.61 0.00 0.00 0.00 0.00 S/. 2,416.61 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006 OBRAS DE DRENAJE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01 CANALETA DE CONRETO (DRENAJE) S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 34.36 0.00 0.00 0.00 S/. 34.36 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 294.14 0.00 0.00 0.00 S/. 294.14 (100%) 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 1,189.77 0.00 0.00 0.00 S/. 197.88 (16.63%) S/. 991.89 (83.37%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.02.02 PERFILADO, RIEGO Y COMPACION DE SUB-RASANTE m2 S/. 438.47 0.00 0.00 0.00 0.00 S/. 438.47 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.02.03 RELLENO CON MATERIAL DE PRESTAMO m3 S/. 409.25 0.00 0.00 0.00 0.00 S/. 409.25 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.02.04 EXTENDIDO, RIEGO Y COMPACTADO m2 S/. 397.23 0.00 0.00 0.00 0.00 S/. 397.23 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 396.17 0.00 0.00 0.00 0.00 S/. 396.17 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.03 OBRAS DE CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.03.01 CANALETA - ENCONFRADO Y DESENCOFRADO m2 S/. 4,087.21 0.00 0.00 0.00 0.00 S/. 4,087.21 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.03.02 CANALETA - CONCRETO f'c=175 kg/cm2 m3 S/. 8,008.89 0.00 0.00 0.00 0.00 S/. 8,008.89 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.01.03.03 JUNTAS DE DILATACION m S/. 436.54 0.00 0.00 0.00 0.00 S/. 436.54 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02 CANAL DE RIEGO Y AGUAS PLUVIALES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 S/. 3.63 0.00 0.00 0.00 0.00 S/. 3.63 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.01.02 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 31.03 0.00 0.00 0.00 0.00 S/. 31.03 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.01.03 DEMOLICION DE CANAL EXISTENTE m3 S/. 139.86 0.00 0.00 0.00 0.00 S/. 139.86 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 251.00 0.00 0.00 0.00 0.00 S/. 251.00 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.02.02 RELLENO CON MATERIAL DE PRESTAMO m3 S/. 43.49 0.00 0.00 0.00 0.00 S/. 43.49 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.02.03 EXTENDIDO, RIEGO Y COMPACTADO m2 S/. 33.52 0.00 0.00 0.00 0.00 S/. 33.52 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.02.04 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 18.91 0.00 0.00 0.00 0.00 S/. 18.91 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.03 OBRAS DE CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.03.01 CANAL - ENCONFRADO Y DESENCOFRADO m2 S/. 1,940.27 0.00 0.00 0.00 0.00 S/. 413.66 (21.32%) S/. 1,526.61 (78.68%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.03.02 CANAL - CONCRETO f'c=175 kg/cm2 m3 S/. 1,208.83 0.00 0.00 0.00 0.00 0.00 S/. 1,208.83 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.02.03.03 JUNTAS DE DILATACION m S/. 55.66 0.00 0.00 0.00 0.00 0.00 S/. 55.66 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03 ALCANTARILLA DE CONCRETO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01 CAJAS RECEPTORA S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 1.73 0.00 0.00 0.00 0.00 S/. 1.73 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 39.81 0.00 0.00 0.00 0.00 S/. 39.81 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 20.06 0.00 0.00 0.00 0.00 S/. 20.06 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.03.01 SOLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 7.27 0.00 0.00 0.00 0.00 S/. 7.27 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.04 CONCRETO ARMADO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.04.01 CAJA - CONCRETO 210 kg/cm2 m3 S/. 157.79 0.00 0.00 0.00 0.00 S/. 157.79 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.04.02 CAJA - ENCONFRADO Y DESENCOFRADO m2 S/. 327.99 0.00 0.00 0.00 0.00 S/. 327.99 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.01.04.03 CAJA - ACERO DE REFUERZO fy=4200 kg/cm2. kg S/. 146.53 0.00 0.00 0.00 0.00 S/. 146.53 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02 ALCANTARILLA METALICA TMC 18" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO DE EJECUCION DE OBRAPROYECTO : “MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LA ÚLTIMA CUADRA DE LA CALLE CONDEBAMBA AL KM. 0.35 DE LA CALLE AYMAS DE LAS URBANIZACIONES CONDEBAMBA Y AYMAS, DISTRITO Y PROVINCIA DE ABANCAY, REGIÓN APURIMAC”FECHA : NOVIEMBRE DEL 2015
ITEM PARTIDAS UndS/. / MESES
MES 1 MES 2 MES 3 MES 4 MES 5 MES 6PRESUPUESTO
S/.
06.03.02.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 9.89 0.00 0.00 0.00 0.00 S/. 9.89 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 293.11 0.00 0.00 0.00 0.00 S/. 293.11 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 146.43 0.00 0.00 0.00 0.00 S/. 146.43 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02.02.03 CAMA DE APOYO PARA TUBERIAS DE REDES EXTERNAS m S/. 6.47 0.00 0.00 0.00 0.00 S/. 6.47 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02.02.04 RELLENO COMPACTADO MANUAL- CON MATERIAL DE PRESTAMO/ PROTECCION DEL TUBO m S/. 15.12 0.00 0.00 0.00 0.00 S/. 15.12 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02.03 ALCANTARILLA METALICA TMC 18" S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.02.03.01 ALCANTARILLA TMC D=18" C=16 R=14 m/día m S/. 1,005.97 0.00 0.00 0.00 0.00 S/. 1,005.97 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03 EMBOQUILADO DE CONCRETO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03.01 TRABAJOS PRELIMINARES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 S/. 5.14 0.00 0.00 0.00 0.00 S/. 5.14 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03.02 MOVIMIENTO DE TIERRAS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03.02.01 EXCAVACION MANUAL DE TERRENO COMPACTADO m3 S/. 34.62 0.00 0.00 0.00 0.00 S/. 34.62 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03.02.02 ELIMINACION DE MATERIAL EXCEDENTE d=15km. m3 S/. 17.30 0.00 0.00 0.00 0.00 S/. 17.30 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03.02.03 PERFILADO, RIEGO Y COMPACION DE SUB-RASANTE m2 S/. 7.66 0.00 0.00 0.00 0.00 S/. 7.66 (100%) 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03.03 CONCRETO SIMPLE S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0006.03.03.03.01 EMBOQUILLADO - CONCRETO f'c=175 kg/cm2 + 30% PM h=0.20m m3 S/. 678.94 0.00 0.00 0.00 0.00 0.00 S/. 678.94 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0007 SEÑALIZACION Y SEGURIDAD EN PAVIMENTO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0007.01 SEÑALIZACION HORIZONTAL EN PAVIMENTO m2 S/. 1,143.90 0.00 0.00 0.00 0.00 0.00 S/. 1,143.90 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0008 PRUEBA DE LABORATORIO S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0008.01 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) u S/. 360.00 0.00 0.00 0.00 0.00 0.00 S/. 360.00 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0008.02 DISEÑO DE MEZCLA u S/. 1,469.60 0.00 0.00 0.00 0.00 0.00 S/. 1,469.60 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0008.03 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MODIFICADO) u S/. 300.00 0.00 0.00 0.00 0.00 0.00 S/. 300.00 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0009 VARIOS S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0009.01 NIVELACION DE BUZONES EN GENERAL u S/. 814.23 0.00 0.00 0.00 0.00 0.00 S/. 814.23 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0010 FLETES S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0010.01 FLETE TERRESTRE glb S/. 1,000.00 S/. 1,000.00 (100%) 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0011 IMPACTO AMBIENTAL S/. - 0.00 0.00 0.00 0.00 0.00 0.000 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.0011.01 IMPACTO AMBIENTAL S/. 4,061.33 0.00 0.00 0.00 0.00 0.00 S/. 4,061.33 (100%)0 0 0 S/. - 0.00 0.00 0.00 0.00 0.00 0.00
COSTO DIRECTO 729,239.69 3,543.68 141,926.11 266,600.98 187,978.90 114,206.76 14,983.27GASTOS GENERALES 78,313.30 283.49 11,354.09 21,328.08 15,038.31 12,264.70 1,609.06GASTOS DE SUPERVISION 10,770.00 248.06 9,934.83 18,662.07 13,158.52 12,264.70 1,609.06GASTOS DE LIQUIDACION 6,000.00 29.16 1,167.73 2,193.53 1,546.64 939.66 123.28TOTAL DE OBRA (VALOR REFERENCIAL) 824,322.99 4,104.38 164,382.75 308,784.65 217,722.38 139,675.83 18,324.67EXPEDIENTE TECNICO 9,900.00 ###COSTO TOTAL DE OBRA 834,222.99 4,104.38 164,382.75 308,784.65 217,722.38 140,615.49 18,447.94AVANCE MENSUAL (%) 100.00% 0.48% 19.23% 36.12% 25.47% 15.48% 2.03%AVANCE ACUMULADO (%) 100.00% 0.48% 19.71% 55.84% 81.31% 96.78% 100.00%