METRADOESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
03.00.00 MOVIMIENTO DE TIERRAS
03.02.00 ESCAVACIÓN CIMIENTOS CORRIDOS
03.02.01 CORTE DE TERRENO HASTA 0.40 M TERRENO NORMAL 18.16 M3
EN ZONA 1, ADMINISTRACION 1 10.6 6.26 0.10 6.64
EN RAMPAS 1 7.82 5.30 0.25 10.36
RAMPA ENTRE ZONA, LABORATORIOS Y ZONA 3, SSHH 1 2.80 1.80 0.23 1.16
03.02.02 EXCAV. ZANJA P/CIMIENTO MAT. SUEL. H=1.00 a 1.50 M 134.33 M3
ZONA 1 ADMINISTRACION
EJE 1 1 5.4 0.8 1 4.32
EJE 2 1 3.1 0.8 1 2.48
EJE 3 1 5.4 0.8 1 4.32
EJE A Y C 2 0.91 0.8 1 1.46
2 1.27 0.7 1 1.78
2 1.45 0.7 1 2.03
EJE B 1 2.96 0.8 1 2.37
1 2.22 0.8 1 1.78
ZONA 2 LABORATORIOS
EJE 4, 7, 11 Y 12 4 5.7 0.8 1 18.24
EJE D Y F 2 10.2 0.65 1 13.26
EJE E 1 1.075 0.65 1 0.70
ZONA 3 SS HH.
EJE 13, 14 Y 15 3 7.925 0.8 1 19.02
EJE G Y J 2 4.83 0.8 1 7.73
EJE H 1 4.83 0.55 1 2.66
ENTRE EJE 13 Y 14 1 1.325 0.55 1 0.73
1 3.125 0.5 1 1.56
ENTRE EJE 14 Y 15 1 2.075 0.5 1 1.04
ENTRE EJE H e I 5 0.9 0.5 1 2.25
ENTRE EJE I Y J 1 0.625 0.5 1 0.31
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 Y 17 2 0.225 0.55 1 0.25
EJE M 1 1.9 0.55 1 1.05
ACCESO PRINCIAPAL
EN GRADAS 1 3.625 0.4 0.5 0.73
1 0.48 0.4 0.5 0.10
EN RAMPA 1 9.4 0.4 0.5 1.88
1 0.48 0.4 0.5 0.10
EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 4.8 0.5 1 2.40
EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 14.77 0.5 1 7.39
EN SARDINELES
EN VEREDAS DE ZONA 1 2 10 0.15 0.4 1.20
2 8.725 0.15 0.4 1.05
EN VEREDAS DE ZONA 2 2 9.65 0.15 0.4 1.16
2 25.2 0.15 0.4 3.02
EN VEREDAS EN ZONA 3 2 10.25 0.15 0.4 1.23
2 9.1 0.15 0.4 1.09
EN VEREDA DE ZONA 4 2 5.5 0.15 0.4 0.66
2 5.2 0.15 0.4 0.62
EN VEREDA DE ACCESO PRINCIPAL 2 1.48 0.15 0.4 0.18
2 6.7 0.15 0.4 0.80
2 3.23 0.15 0.4 0.39
1 13.078 0.15 0.4 0.78
1 8.65 0.15 0.4 0.52
1 6.31 0.15 0.4 0.38
1 11.56 0.15 0.4 0.69
1 2.82 0.15 0.4 0.17
2 6.98 0.15 0.4 0.84
EN VEREDAS ENTRE ZONA 4 Y 6 1 2.55 0.15 0.4 0.15
1 2.23 0.15 0.4 0.13
1 1.64 0.15 0.4 0.10
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
1 1.98 0.15 0.4 0.12
2 12.2 0.15 0.4 1.46
EN CANALES PLUVIALES
EN ZONA 1 2 10.6 0.3 0.15 0.95
2 9.625 0.3 0.15 0.87
EN ZONA 2 2 10.6 0.3 0.15 0.95
2 26.1 0.3 0.15 2.35
ZONA 3 SS HH. 2 10.975 0.3 0.15 0.99
2 9.25 0.3 0.15 0.83
EN BUZONES PLUVIALES 3 0.8 0.8 1 1.92
EN MESAS DE TRABAJO LABORATORIO DE FISICA 16 0.4 1.05 0.3 2.02
EN DADOS DE CONCRETO EN MESAS DE CONCRETO 15 0.4 0.4 2 4.80
03.03.00 EXCAVACION PARA ZAPATAS Y SIMILARES
03.03.02 EXCAVACIÓN PARA ZAPATA MAT. SUELTO H=1.40 m 127.52 M3
EN ZONA 1 ADMINISTRACIÓN
ZAPATA 1 4 1.4 1.2 1.6 10.75
ZAPATA 2 2 1.4 1.2 1.6 5.38
EN ZONA 2 LABORATORIOS
ZAPATA 3 8 1.4 1.05 1.6 18.82
ZAPATA 4 10 1.7 1.65 1.6 44.88
EN ZONA 4 CISTERNA Y TANQUE ELEVADO
ZAPATA 5 2 1 1 2.5 5.00
ZAPATA 6 4 1.2 1.2 2.5 14.40
ZAPTA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 1.37 16.97
1 2.3 1.4 1.37 4.41
ZAPATA 7 3 1.2 1.2 1.6 6.91
03.12.00 EXCAVACION MASIVA
03.12.01 EXCAVACION MASIVA H=1 M C/TRACTOR 523.85 M3
ZONA 3, SSHH 1 12.40 10.00 0.55 68.20
ZONA 4, CISTERNA Y TANQUE ELEVADO 1 7.34 5.50 0.65 26.24
EXCAVACION PARA TANQUE CISTERNA 1 3.40 1.50 1.9 9.69
EN ZONA 2, LABORATORIOS 1 21.16 10.60 0.36 80.75
RAMPA ZONA 3, SSHH Y ZONA4 CISTERNA 1 5.65 4.22 0.74 17.64
RAMPA ENTRE ZONA 4,CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 9.85 1.70 1.78 29.81
1 9.85 1.70 1.17 19.59
LOSA DEPORTIVA 1 31.30 18.10 0.48 271.93
03.21.00 RELLENO CON MATERIAL PROPIO
03.21.01 RELLENO CON MATERIAL PROPIO MANUAL 74.91 M3
ZONA1 AREA
ZAPATA 1 4 0.7 0.9 2.52
4 0.21 0.9 0.76
4 0.34 0.4 0.54
ZAPATA 2 2 0.38 0.9 0.68
2 0.46 0.9 0.83
2 0.38 0.4 0.30
EN EJE 1 Y 3 2 1.485 0.4 1.19
2 1.42 0.4 1.14
EJE 2 2 2.3 0.275 0.4 0.51
EJE A Y C 4 3.62 0.275 0.4 1.59
EJE B 2 5.98 0.275 0.4 1.32
ZONA 2 AREA
ZAPATA 3 8 1.15 0.9 8.28
ZAPATA 4 10 2.22 0.9 19.98
EJE 4, 7, 11 Y 12 8 5.7 0.275 0.4 5.02
EJE D Y F 4 10.2 0.25 0.4 4.08
ZONA 3
EJE 13, 14 Y 15 6 7.925 0.275 0.4 5.23
EJE G,H Y J 6 6.75 0.275 0.4 4.46
ENTRE EJE 13 Y 14 2 1.325 0.2 0.4 0.21
2 3.125 0.175 0.4 0.44
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
ENTRE EJE 14 Y 15 2 2.075 0.175 0.4 0.29
ZONA 4 AREA
ZAPATA 5 2 0.78 1.9 2.96
ZAPATA 6 4 1.18 1.9 8.97
ZAPATA 7 3 1.34 0.9 3.62
03.31.00 REFINE NIVELACIÓN Y COMPACTACIÓN DEL TERRENO
03.31.01 NIVELACIÓN APISONADO MANUAL 1393.09 M2
ZONA 1 ADMINISTRACIÓN 1 10.60 9.63 102.08
ZONA 2 LABORATOIOS 1 26.10 10.61 276.92
ZONA 3 SSHH 1 10.98 9.95 109.25
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 5.50 5.50 30.25
VEREDAS ACCESO PRINCIPAL 1 15.28 1.20 18.34
1 6.68 3.30 22.04
1 17.58 5.30 93.17
VEREDAS DE ACCESO A ZONA 7, AUDITORIO 1 6.70 2.40 16.08
1 6.35 2.55 16.19
VEREDA DE ACCESO A ZONA 1, AADMINISTRACIÓN 1 3.30 4.00 13.20
VEREDA DE ACCESO A ZONA 2, LABORATORIOS 1 8.32 2.40 19.97
RAMPA DE ACCESO A ZONA 3, SSHH 1 3.10 1.80 5.58
VEREDA ENTRE ZONA 3, SSHH Y ZONA 5, LOSA DEPORTIVA 1 9.70 1.43 13.82
1 4.23 2.50 10.56
1 3.38 3.15 10.63
1 1.70 1.23 2.09
RAMPA ENTRE ZONA 4, CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 11.70 3.60 42.12
GRADAS EN ZONA 4 1 2.70 2.60 7.02
VEREDA ENTRE ZONA 4 CISTERNA Y ZONA 6 PABELLON 1 EXISTENTE 1 4.75 4.35 20.66
VEREDA DE ACCESO POSTERIOR 1 12.25 1.20 14.70
LOSA DEPORTIVA 1 18.10 30.10 544.81
2 3.00 0.60 3.60
03.35.00 BASE
03.35.01 BASE GRANULAR E= 0.2m COMPACTADO CON PLANCHA 548.41 M2
1 18.1 30.1 544.81
2 3 0.6 3.60
03.85.00 ELIMINACION DE MATERIAL EXCEDENTE
03.85.02 ELIMINACION MATERIAL EXCEDENTE 25% DE ESPONJAMIENTO 887.97 M3
DE EXCAVACIÓN MASIVA 1.25 523.85 654.82
DE EXCAVACION PARA ZAPATAS 1.25 127.52 159.40
DE EXCAVACIÓN PARA CIMIENTOS 1.25 134.33 167.91
DE CORTE DE TERRENO 1.25 18.16 22.70
DE RRELLENO CON MATERIAL PROPIO -1.56 74.91 -116.85
04.00.00 OBRAS DE CONCRETO SIMPLE
04.01.25 CONCRETO PARA CIMIENTO CORRIDO 1:10 (C:H) + 30% PG 74.18 M3
ZONA 1 ADMINISTRACION
EJE 1 1 5.95 0.8 0.6 2.86
EJE 2 1 2.73 0.8 0.6 1.31
EJE 3 1 5.95 0.8 0.6 2.86
EJE A Y C 2 0.8 0.8 0.6 0.77
2 1.925 0.7 0.6 1.62
2 2.25 0.7 0.6 1.89
EJE B 1 6.025 0.8 0.6 2.89
ZONA 2 LABORATORIOS
EJE 4, 7, 11 Y 12 4 6.25 0.8 0.6 12.00
EJE D Y F 2 17.1 0.65 0.6 13.34
EJE E 1 1.625 0.65 0.6 0.63
ZONA 3 SS HH.
EJE 13, 14 Y 15 3 7.925 0.8 0.6 11.41
EJE G Y J 2 5.95 0.8 0.6 5.71
EJE H 1 5.95 0.55 0.6 1.96
ENTRE EJE 13 Y 14 1 1.8 0.55 0.6 0.59
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
1 3.125 0.5 0.6 0.94
ENTRE EJE 14 Y 15 1 2.075 0.5 0.6 0.62
ENTRE EJE H e I 5 0.9 0.5 0.6 1.35
ENTRE EJE I Y J 1 0.625 0.5 0.6 0.19
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 Y 17 2 1 0.55 0.6 0.66
EJE M 1 2.7 0.55 0.6 0.89
ACCESO PRINCIAPAL
EN GRADAS 1 3.625 0.4 0.3 0.44
1 0.48 0.4 0.3 0.06
EN RAMPA 1 9.4 0.4 0.3 1.13
1 0.48 0.4 0.3 0.06
EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 4.8 0.5 0.6 1.44
EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 14.77 0.5 0.6 4.43
EN MESAS DE TRABAJA LABORATORIO
16 1.05 0.4 0.3 2.02
4 0.25 0.4 0.3 0.12
04.03.07 SOLADO PARA ZAPATAS C:H 1:12 E=4” 77.58 M2
EN ZONA 1 ADMINISTRACIÓN
ZAPATA 1 4 1.4 1.2 6.72
ZAPATA 2 2 1.4 1.2 3.36
EN ZONA 2 LABORATORIOS
ZAPATA 3 8 1.4 1.05 11.76
ZAPATA 4 10 1.7 1.65 28.05
EN ZONA 4 CISTERNA Y TANQUE ELEVADO
ZAPATA 5 2 1 1 2.00
ZAPATA 6 4 1.2 1.2 5.76
ZAPATA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 12.39
1 2.3 1.4 3.22
ZAPAT 7 3 1.2 1.2 4.32
04.07.13 CONCRETO DE SOBRE CIMIENTO 1:8 (C:H) + 25% PM 15.11 M3
ZONA 1 ADMINISTRACION
EJE 1 1 5.95 0.25 0.6 0.89
EJE 2 1 1.725 0.25 0.6 0.26
EJE 3 1 5.95 0.25 0.6 0.89
EJE A Y C 2 0.8 0.25 0.6 0.24
2 1.925 0.15 0.6 0.35
1 0.925 0.15 0.6 0.08
1 1.75 0.15 0.6 0.16
EJE B 1 5.025 0.25 0.6 0.75
ZONA 2 LABORATORIOS
EJE 4, 7, Y 12 3 6.25 0.25 0.6 2.81
EJE 11 1 4.15 0.25 0.6 0.62
EJE D 1 10.8 0.15 0.6 0.97
EJE F 1 13.699 0.15 0.6 1.23
EJE E 1 1.625 0.15 0.6 0.15
ZONA 3 SS HH.
EJE 13, 14 Y 15 3 6.375 0.25 0.6 2.87
EJE G 1 2.9 0.25 0.6 0.44
EJE J 1 3.45 0.25 0.6 0.52
EJE H 1 6.25 0.15 0.6 0.56
ENTRE EJE 13 Y 14 1 1.8 0.15 0.6 0.16
3 0.35 0.15 0.6 0.09
ENTRE EJE 14 Y 15 2 0.35 0.15 0.6 0.06
ENTRE EJE H e I 5 1.35 0.15 0.6 0.61
ENTRE EJE I Y J 1 0.625 0.15 0.6 0.06
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 Y 17 1 1 0.15 0.6 0.09
EJE M 1 2.7 0.15 0.6 0.24
04.07.91 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTO 146.58 M2
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
ZONA 1 ADMINISTRACION
EJE 1 2 5.95 0.6 7.14
EJE 2 2 1.725 0.6 2.07
EJE 3 2 5.95 0.6 7.14
EJE A Y C 4 0.8 0.6 1.92
4 1.925 0.6 4.62
2 0.925 0.6 1.11
2 1.75 0.6 2.10
EJE B 2 5.025 0.6 6.03
ZONA 2 LABORATORIOS
EJE 4, 7, Y 12 6 6.25 0.6 22.50
EJE 11 2 4.15 0.6 4.98
EJE D 2 10.8 0.6 12.96
EJE F 2 13.699 0.6 16.44
EJE E 2 1.625 0.6 1.95
ZONA 3 SS HH.
EJE 13, 14 Y 15 6 6.375 0.6 22.95
EJE G 2 2.9 0.6 3.48
EJE J 2 3.45 0.6 4.14
EJE H 2 6.25 0.6 7.50
ENTRE EJE 13 Y 14 2 1.8 0.6 2.16
6 0.35 0.6 1.26
ENTRE EJE 14 Y 15 4 0.35 0.6 0.84
ENTRE EJE H e I 10 1.35 0.6 8.10
ENTRE EJE I Y J 2 0.625 0.6 0.75
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 Y 17 2 1 0.6 1.20
EJE M 2 2.7 0.6 3.24
04.08.56 CONCRETO 175 kg/cm2 GRADAS Y RAMPAS 7.13 M3
ZONA 1 ADMINISTRACIÓN Y ACCESO
GRADAS 3 1.00 1.00 0.1 0.30
3 2.50 0.25 0.25 0.47
RAMPA 1 7.00 1.05 0.1 0.74
GRADAS ENTRE ZONA 2 Y ZONA 5 6 1.6 0.5 0.2 0.96
RAMPA ENTRE ZONA 2 Y ZONA 3 1 3.1 1.5 0.1 0.47
GRADAS ENTRE ZONA 3 Y ZONA 4 4 1 0.25 0.2 0.20
GRADAS ENTRE ZONA 4 Y ZONA 6 9 2.4 0.25 0.25 1.35
RAMPA ENTRE ZONA 4 Y ZONA 6 2 7.25 1.4 0.1 2.03
1 0.75 3.2 0.1 0.24
1 0.2 1.5 0.1 0.03
2 1.767 0.1 0.35
04.08.58 ENCOFRADO Y DESENCOFRADO NORMAL GRADAS 10.83 M2
ZONA 1 ADMINISTRACION Y ACCESO
EN GRADAS DE ACCESO 3 1.05 0.127 0.40
3 2.5 0.127 0.95
EN GRADAS ENTRE ZONA 2 Y ZONA 5 4 1.5 0.4 2.40
8 1.8 0.125 1.80
GRADAS ENTRE ZONA 3 Y ZONA 4 2 0.75 0.4 0.60
4 1 0.125 0.50
GRADAS ENTRE ZONA 4 Y ZONA 6 10 2.4 0.174 4.18
04.08.91 CONCRETO 175 kg/cm2 LOSA DEPORTIVA 85.07 M3
1 18.1 30.1 0.15 81.72
2 18.1 0.175 0.2 1.27
2 29.75 0.175 0.2 2.08
04.08.92 ENCOFRADO Y DESENCOFRADO NORMAL LOSA DEPORTIVA 80.75 M2
2 18.1 0.5 18.10
2 30.1 0.5 30.10
3 30.1 0.15 13.55
7 18.1 0.15 19.01
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
04.09.05 FALSO PISO DE 4” CON MEZCLA 1:8 C:H 232.88 M2
ZONA 1 ADMINISTRACIÓN
SECRETARIA 1 3.125 2.775 8.67
1 1 0.15 0.15
1 2.25 0.1 0.23
DIRECCION 1 3.5 3.125 10.94
1 1.925 0.1 0.19
1 1 0.25 0.25
SALA DE PROFESORES 1 6.51 2.975 19.37
1 2.775 0.15 0.42
1 2.25 0.1 0.23
1 3.5 0.15 0.53
1 1.925 0.1 0.19
ZONA 2 LABORATORIOS
ALMACEN 1 3.125 1.65 5.16
1 0.8 0.25 0.20
ARCHIVO 1 3.225 1.625 5.24
1 0.8 0.25 0.20
LABORATORIO DE FISICA Y QUIMICA 1 12.875 5.5 70.81
2 1.625 0.5 1.63
6 3.5 0.5 10.50
2 1.2 0.15 0.36
1 3.025 0.1 0.30
LABORATORIO DE COMPUTO 1 8 5.5 44.00
6 2.5 0.5 7.50
1 2.05 0.1 0.21
1 1.2 0.15 0.18
ZONA 3
SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66
1 0.9 0.25 0.23
SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66
1 0.9 0.25 0.23
SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63
1 1 0.25 0.25
SS.HH ALUMNOS 1 4.925 1.625 8.00
5 1.35 0.9 6.08
5 0.7 0.15 0.53
1 1.663 1.5 2.49
1 0.6 0.15 0.09
1 1.5 1.012 1.52
1 4.925 1.625 8.00
1 1.775 1.5 2.66
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3 1.3 3.90
1 2.7 0.1 0.27
1 1 0.25 0.25
04.09.58 CONCRETO 175 kg/cm2 EN SARDINEL 17.73 M3
ZONA 1 ADMINISTRACIÓN Y ACCESO
SARDINELES EN ACCESO PRINCIPAL 2 1.48 0.15 0.4 0.18
2 6.7 0.15 0.4 0.80
2 3.23 0.15 0.4 0.39
1 13.078 0.15 0.4 0.78
1 8.65 0.15 0.4 0.52
1 6.31 0.15 0.4 0.38
1 11.56 0.15 0.4 0.69
1 2.82 0.15 0.4 0.17
2 8.2 0.15 0.4 0.98
EN ADMINISTRACIÓN 2 10 0.15 0.4 1.20
2 9.25 0.15 0.4 1.11
ZONA 2 LABORATORIOS 2 10 0.15 0.4 1.20
2 25.2 0.15 0.4 3.02
2 3.1 0.15 0.4 0.37
ZONA 3 SS.HH. 2 10.37 0.15 0.4 1.24
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
2 9.1 0.15 0.4 1.09
1 1.43 0.15 0.4 0.09
1 1.75 0.15 0.4 0.11
ZONA 4 CISTERNA Y TANQUE ELEVADO 2 5.5 0.15 0.4 0.66
2 5.2 0.15 0.4 0.62
ENTRE ZONA 4 Y ZONA 6 1 1.45 0.15 0.4 0.09
1 1.38 0.15 0.4 0.08
1 2.55 0.15 0.4 0.15
1 2.23 0.15 0.4 0.13
1 1.64 0.15 0.4 0.10
1 1.98 0.15 0.4 0.12
2 12 0.15 0.4 1.44
04.09.91 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINEL 236.39 M2
ZONA 1 ADMINISTRACIÓN Y ACCESO
SARDINELES EN ACCESO PRINCIPAL 4 1.48 0.4 2.37
4 6.7 0.4 10.72
4 3.23 0.4 5.17
2 13.078 0.4 10.46
2 8.65 0.4 6.92
2 6.31 0.4 5.05
2 11.56 0.4 9.25
2 2.82 0.4 2.26
4 8.2 0.4 13.12
EN ADMINISTRACIÓN 4 10 0.4 16.00
4 9.25 0.4 14.80
ZONA 2 LABORATORIOS 4 10 0.4 16.00
4 25.2 0.4 40.32
4 3.1 0.4 4.96
ZONA 3 SS.HH. 4 10.37 0.4 16.59
4 9.1 0.4 14.56
2 1.43 0.4 1.14
2 1.75 0.4 1.40
ZONA 4 CISTERNA Y TANQUE ELEVADO 4 5.5 0.4 8.80
4 5.2 0.4 8.32
ENTRE ZONA 4 Y ZONA 6 2 1.45 0.4 1.16
2 1.38 0.4 1.10
2 2.55 0.4 2.04
2 2.23 0.4 1.78
2 1.64 0.4 1.31
2 1.98 0.4 1.58
4 12 0.4 19.20
04.10.58 CONCRETO 175 kg/cm2 EN CANAL PLUVIAL 8.36 M3
ZONA 1 ADMINISTRACION 2 10.6 0.1 0.55 1.17
2 9.625 0.1 0.55 1.06
EN ZONA 2 LABORATORIOS 2 26.1 0.1 0.55 2.87
2 10.6 0.1 0.55 1.17
ZONA 3 SS.HH. 1 19.87 0.1 0.55 1.09
1 18.35 0.1 0.55 1.01
04.10.91 ENCOFRADO Y DESENCOFRADO NORMAL EN CANAL PLUVIAL 60.83 M2
ZONA 1 ADMINISTRACION 2 10.6 0.4 8.48
2 9.625 0.4 7.70
EN ZONA 2 LABORATORIOS 2 26.1 0.4 20.88
2 10.6 0.4 8.48
ZONA 3 SS.HH. 1 19.87 0.4 7.95
1 18.35 0.4 7.34
05.00.00 OBRAS DE CONCRETO ARMADO
05.01.00 CIMIENTO CORRIDO REFORZADO
05.01.59 CONCRETO F’C 175 KG/CM2 SOBRECIMIENTO REFORZADO 5.26 M3
EN ACCESO PRINCIPAL
EN GRADAS 1 3.5 0.15 0.3 0.16
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
1 2.5 0.15 0.127 0.05
1 1.35 0.15 0.127 0.03
1 0.6 0.15 0.58 0.05
EN RAMPA 1 9.276 0.15 0.39 0.54
EN GRADAS ENTRE ZONA 4 Y 6 1 4.523 0.2 0.5 0.45
EN RAMPA ENTRE ZONA 4 Y 6 1 14.77 0.2 0.885 2.61
1 7.25 0.2 0.94 1.36
05.01.92 ENCOFRADO Y DESENCOFRADO SOBRECIMIENTO REFORZADO 55.31 M2
EN ACCESO PRINCIPAL
EN GRADAS 2 3.5 0.3 2.10
2 2.5 0.127 0.64
2 1.35 0.127 0.34
2 0.6 0.58 0.70
EN RAMPA 2 9.276 0.39 7.24
EN GRADAS ENTRE ZONA 4 Y 6 2 4.523 0.5 4.52
EN RAMPA ENTRE ZONA 4 Y 6 2 14.77 0.885 26.14
2 7.25 0.94 13.63
05.01.95 ACERO FY=4200 KG/CM2 PARA SOBRECIMIENTO REFORZADO 577.59 KG
1 577.59 577.59
05.02.00 ZAPATAS
05.02.59 CONCRETO F’C 210 KG/CM2 PARA ZAPATAS 46.55 M3
EN ZONA 1 ADMINISTRACIÓN
ZAPATA 1 4 1.4 1.2 0.6 4.03
ZAPATA 2 2 1.4 1.2 0.6 2.02
EN ZONA 2 LABORATORIOS
ZAPATA 3 8 1.4 1.05 0.6 7.06
ZAPATA 4 10 1.7 1.65 0.6 16.83
EN ZONA 4 CISTERNA Y TANQUE ELEVADO
ZAPATA 5 2 1 1 0.6 1.20
ZAPATA 6 4 1.2 1.2 0.6 3.46
ZAPATA EN MURO DE CONTENCIÓN - RAMPA ENTRE ZONA 4Y 6 1 8.85 1.4 0.6 7.43
1 2.3 1.4 0.6 1.93
ZAPATA 7 3 1.2 1.2 0.6 2.59
05.02.95 ACERO FY=4200 KG/CM2 PARA ZAPATAS 1 1,286.88 1286.88 1286.88 KG
05.06.00 TABIQUE Y PLACA
05.06.59 CONCRETO F’C 210 KG/CM2 PARA PLACA 3.91 M3
EN MURO DE CONTENCIÓN 1 9.25 0.2 1.56 2.89
1 2.5 0.2 2.04 1.02
05.06.92 ENCOFRADO Y DESENCOFRADO EN PLACAS 39.06 M2
EN MURO DE CONTENCIÓN 2 9.25 1.56 28.86
2 2.5 2.04 10.20
05.06.95 ACERO FY=4200 KG/CM2 EN PLACAS 420.94 KG
1 420.94 420.94
05.08.00 COLUMNAS
05.08.59 CONCRETO F’C 210 KG/CM2 PARA COLUMNAS 41.46 M3
ZONA 1 ADMINISTRACION Y ACCESO
COLUMNA C-1 EN EJE 1 Y 3 4 0.4 0.25 4.64 1.86
4 0.35 0.25 4.05 1.42
COLUMNA C-2 EN EJE 2 2 0.6 0.25 4.05 1.21
COLUMNA C-3 EN EJE 1 Y 3 2 0.25 0.25 5.66 0.71
COLUMNA C-3 EN RESTO 5 0.25 0.25 4.05 1.27
COLUMNEA CA-1 9 0.15 0.15 1.55 0.31
COLUMNA C-10 3 0.1257 4.5 1.70
ZONA 2 LABORATORIOS
COLUMNA C-4 EN EJE 4 Y 12 4 0.6 0.25 4.64 2.78
COLUMNA C-4 EN RESTO 4 0.6 0.25 4.05 2.43
COLUMNA C-5 10 1.3 0.25 4.05 13.16
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
COLUMNA C-3 EN EJE 4 Y 12 2 0.25 0.25 5.66 0.71
COLUMNA C-3 EN RESTO 4 0.25 0.25 4.05 1.01
COLUMNETA CA-2 16 0.15 0.15 2.65 0.95
COLUMNETA CA-3 19 0.15 0.15 1.85 0.79
ZONA 3 SS.HH.
COLUMNA C-6 EN EJE 13 Y 15 4 0.25 0.25 5.17 1.29
COLUMNA C-6 EN RESTO 7 0.25 0.25 4.05 1.77
COLUMNA C-7 4 0.55 0.25 4.64 2.55
EN ZONA 4 CISTERNA Y TANQUE ELEVADO
COLUMNA C-8 2 0.25 0.25 7.9 0.99
COLUMNA C-9 4 0.55 0.25 7.9 4.35
COLUMNETA CA-4 1 0.15 0.15 1.55 0.03
COLUMNETAS EN PARAPETO
LOSA 2 8 0.15 0.15 0.9 0.16
05.08.92 ENCOFRADO Y DESENCOFRADO EN COLUMNAS 398.62 M2
ZONA 1 ADMINISTRACION Y ACCESO
COLUMNA C.1 4 1 4.64 18.56
4 0.75 4.64 13.92
COLUMNA C-2 2 2 4.05 16.20
COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83
COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19
COLUMNA C-10 3 1.257 4.5 16.96
COLUMNETA CA-1 9 0.3 1.55 4.19
ZONA 2 LABORATORIOS
COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91
COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77
2 1.45 4.05 11.75
COLUMNA C-5 10 2.55 4.05 103.27
COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83
1 0.35 5.66 1.98
COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07
1 0.35 4.05 1.42
1 0.5 4.05 2.03
COLUMNETA CA-2 16 0.45 2.65 19.08
COLUMNETA CA-3 19 0.45 1.85 15.82
ZONA 3 SS.HH.
COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62
1 0.5 5.17 2.59
1 0.35 5.17 1.81
COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11
1 0.25 4.05 1.01
2 0.5 4.05 4.05
1 0.2 4.05 0.81
COLUMNA C-7 3 1.35 4.64 18.79
1 1.1 4.64 5.10
EN ZONA 4 CISTERNA Y TANQUE ELEVADO
COLUMNA C-8 2 0.8 7.9 12.64
COLUMNA C-9 2 1.3 7.9 20.54
2 1.45 7.9 22.91
COLUMNETA CA-4 1 0.45 1.55 0.70
COLUMNETAS EN PARAPETO
LOSA 2 16 0.15 0.9 2.16
05.08.95 ACERO FY=4200 KG/CM2 EN COLUMNAS 1 7,020.06 7020.06 7020.06 KG
05.08.96 JUNTAS DE TECNOPORTE E=1" 11.30 M2
ZONA 1 ADMINISTRACIÓN 7 0.15 1.55 1.63
ZONA 2 LABORATORIOS 12 0.15 2.65 4.77
16 0.15 1.85 4.44
ZONA 4 CISTENA Y TANQUE ELEVADO
COLUMNETAS CA-4 2 0.15 1.55 0.46
05.09.00 VIGAS Y DINTELES
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
05.09.59 CONCRETO F’C 210 KG/CM2 PARA VIGAS 14.78 M3
ZONA 1 ADMINISTRACION
EJE 1 Y 3 4 2.98 0.25 0.3 0.89
4 3.098 0.25 0.3 0.93
EN EJE 2 1 2.725 0.25 0.3 0.20
EN EJE A 1 4.97 0.25 0.3 0.37
EN EJE B 1 6.02 0.25 0.3 0.45
EN EJE C 1 4.97 0.25 0.3 0.37
EN ACCESO PRINCIPAL - VIGA "S" 1 5.41 0.12 0.6 0.39
VIGUETAS SOLERAS
EN EJE A 1 2.5 0.15 0.15 0.06
EN EJE C 1 3.325 0.15 0.15 0.07
ZONA 2 LABORATORIOS
EN EJE 4 Y 12 4 3.13 0.25 0.3 0.94
4 3.25 0.25 0.3 0.98
EN EJE 7 2 3.13 0.25 0.3 0.47
EN EJE 11 1 5.76 0.25 0.3 0.43
EN EJE D Y F 2 17.11 0.25 0.3 2.57
EN EJE E 1 1.625 0.25 0.3 0.12
VIGUETAS SOLERAS
EJE D 1 11.8 0.15 0.15 0.27
EJE F 1 13.7 0.15 0.15 0.31
ZONA 3 SS.HH
EJE 13 Y 15 2 6.08 0.25 0.3 0.91
2 6.71 0.25 0.3 1.01
EJE 14 1 6.08 0.25 0.3 0.46
EJE G 1 5.71 0.25 0.3 0.43
EJE H 1 6.25 0.25 0.3 0.47
VP 110 1 1.7 0.15 0.3 0.08
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 Y 17 -LOSA 1 2 2.45 0.25 0.3 0.37
EJE K Y M - LOSA 1 2 2.7 0.25 0.3 0.41
EJE 16 Y 17 -LOSA 2 2 2.45 0.25 0.3 0.37
EJE K Y M - LOSA 2 2 2.7 0.25 0.3 0.41
VIGUETAS SOLERAS
EJE 16 1 0.65 0.15 0.15 0.01
EN PARAPETO 1 2.3 0.15 0.15 0.05
05.09.92 ENCOFRADO Y DESENCOFRADO EN VIGAS 138.97 M2
ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL
EJE 1 Y 3 8 2.85 0.3 6.84
4 6.2 0.3 7.44
EJE 2 2 1.73 0.3 1.04
1 1 0.85 0.85
EJE A Y C 4 0.8 0.3 0.96
2 1.92 0.85 3.26
2 2.25 0.85 3.82
EJE B 2 3.5 0.3 2.10
2 1.52 0.3 0.91
1 1 0.85 0.85
VIGUETAS SOLERAS
EN EJE A 2 2.5 0.15 0.75
EN EJE C 2 3.325 0.15 1.00
ZONA 2 LABORATORIOS
EJE 4 Y 12 8 3.13 0.3 7.51
4 6.5 0.3 7.80
EJE 7 4 3.125 0.3 3.75
EJE 11 4 2.08 0.3 2.50
2 0.8 0.85 1.36
EJE D 2 17.98 0.85 30.57
EJE E 2 1.625 0.3 0.98
VIGUETAS SOLERAS
EJE D 2 11.8 0.15 3.54
EJE F 2 13.7 0.15 4.11
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
ZONA 3 SS.HH.
EJE 13 Y 15 4 6.08 0.3 7.30
4 6.71 0.3 8.05
EJE 14 2 6.375 0.3 3.82
EJE G 2 3.51 0.3 2.11
1 3.2 0.85 2.72
EJE H 2 6.25 0.3 3.75
EJE J 2 2.64 0.3 1.58
1 2.8 0.85 2.38
ENTRE EJE 13 Y 14 2 1.8 0.3 1.08
ZONA 4 CISTERNA Y TANQUE ELEVADO
EN EJE 16 Y 17 LOSA 1 4 1.45 0.3 1.74
2 1 0.85 1.70
EN EJE K Y M LOSA 1 4 2.7 0.3 3.24
EN EJE 16 Y 17 LOSA 2 4 1.45 0.3 1.74
2 1 0.85 1.70
EN EJE K Y M LOSA 2 4 2.7 0.3 3.24
VIGUETAS SOLERAS
EJE 16 2 0.65 0.15 0.20
EN PARAPETO 2 2.3 0.15 0.69
05.09.95 ACERO FY=4200 KG/CM2 EN VIGAS 1 2,266.96 2266.96 2266.96 KG
05.10.00 LOSAS
05.10.59 CONCRETO F’C 210 KG/CM2 PARA LOSA 2.70 M3
ZONA 4 CISTERNA Y TANQUE ELEVADO
LOSA 1 Y 2 2 3.00 3.00 0.15 2.70
05.10.92 ENCOFRADO Y DESENCOFRADO EN LOSA 18.00 M2
ZONA 4 CISTERNA Y TANQUE ELEVADO
LOSA 1 Y 2 2 3.00 3.00 18.00
05.10.95 ACERO FY=4200 KG/CM2 EN LOSA 1 608.84 608.84 608.84 KG
05.14.00 CISTERNA
05.14.59 CONCRETO F’C 210 KG/CM2 PARA CISTERNA 5.89 M3
EN MUROS 2 1.9 0.2 1.55 1.18
2 3.00 0.2 1.55 1.86
EN LOSA DE FONDO 1 1.25 2.5 0.2 0.63
1 1.65 2.5 0.2 0.83
1 1.1 0.6 0.2 0.13
2 0.3 1 0.2 0.12
2 1.5 0.3 0.2 0.18
LOSA DE TAPA 1 3.4 1.9 0.15 0.97
05.14.92 ENCOFRADO Y DESENCOFRADO EN CISTERNA 37.49 M2
EN MUROS 2 1.5 1.55 4.65
2 3 1.55 9.30
2 1.9 1.7 6.46
2 3.4 1.7 11.56
EN LOSA DE FONDO 2 0.6 0.3 0.36
2 1.1 0.3 0.66
LOSA DE TECHO 1 1.5 3 4.50
05.14.95 ACERO FY=4200 KG/CM2 EN CISTERNA 1 605.01 605.01 605.01 KG
05.15.58 CONCRETO 175 kg/cm2 EN SUMIDERO PLUVIAL 1.05 M3
ZONA 1 ADMINISTRACION 4 0.65 0.85 0.1 0.22
2 0.8 0.8 0.1 0.13
ZONA 2 LABORATORIOS 4 0.65 0.85 0.1 0.22
2 0.8 0.8 0.1 0.13
ZONA 3 SS.HH. 4 0.65 0.85 0.1 0.22
2 0.8 0.8 0.1 0.13
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
05.15.92 ENCOFRADO Y DESENCOFRADO NORMAL EN SUMIDERO PLUVIAL 7.20 M2
ZONA 1 ADMINISTRACION 4 0.6 0.85 2.04
1 0.6 0.6 0.36
ZONA 2 LABORATORIOS 4 0.6 0.85 2.04
1 0.6 0.6 0.36
ZONA 3 SS.HH. 4 0.6 0.85 2.04
1 0.6 0.6 0.36
05.15.95 ACERO FY=4200 KG/CM2 EN SUMIDERO PLUVIAL 1 103.46 103.46 103.46 KG
05.16.58 CONCRETO 175 kg/cm2 EN MESAS DE TRABAJO 4.99 M3
EN LOSA SUPERIOR DE MESA DE TRABAJO LABORATORIO DE FISICA 4 3.6 1 0.1 1.44
16 0.8 0.15 0.8 1.54
4 0.5 0.15 0.8 0.24
4 0.5 0.1 0.2 0.04
EN MESA DE CONCRETO LABORATORIO DE FISICA 5 3.5 0.6 0.1 1.05
15 0.15 0.15 0.95 0.32
15 0.4 0.4 0.2 0.48
-2 1.099 0.549 0.1 -0.12
05.16.92 ENCOFRADO Y DESENCOFRADO NORMAL EN MESA DE TRABAJO 59.27 M2
4 3.6 1 14.40
8 3.6 0.1 2.88
8 1 0.1 0.80
8 0.4 0.2 0.64
12 0.5 0.2 1.20
24 0.8 0.8 15.36
8 0.8 0.6 3.84
8 0.5 0.8 3.20
8 0.5 0.6 2.40
32 0.15 0.8 3.84
EN MESA DE CONCRETO LABORATORIO DE FISICA 5 3.5 0.6 10.50
5 3.5 0.1 1.75
-15 0.15 0.15 -0.34
-2 1.099 0.549 -1.21
05.16.95 ACERO FY=4200 KG/CM2 EN MESAS DE TRABAJO 514.93 KG
1 514.93 514.93
07.00.00 ESTRUCTURA DE MADERA DE TECHO
07.01.01 TIJERALES TIPO 1 33.00 UND
33 33.00
07.01.02 COLOCACION Y ANCLAJE DE TEJERALES 33.00 UND
33 33.00
07.01.03 CORREAJE DE MADERA 2" x 3" 480.90 M
EN ZONA 1 12 7.875 94.50
EN ZONA 2 12 24.35 292.20
EN ZONA 3 12 7.85 94.20
07.01.05 FRISO DE MADERA DE 1" x 12" 80.15 M
EN ZONA 1 2 7.875 15.75
EN ZONA 2 2 24.35 48.70
EN ZONA 3 2 7.85 15.70
07.01.06 FRISO DE MAREDA DE 1" x 4" 78.10 M
EN ZONA 1 2 13.017 26.03
EN ZONA 2 2 13.017 26.03
EN ZONA 3 2 13.017 26.03
08.00.00 COBERTURAS
08.01.01 COBERTURA CON PLANCHA DE TEJA ANDINA 513.05 M2
EN ZONA 1 1 8.025 6.63 53.21
ESTRUCTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
1 8.025 6.03 48.39
EN ZONA 2 1 24.5 6.63 162.44
1 24.5 6.03 147.74
EN ZONA 3 1 8.00 6.63 53.04
1 8.00 6.03 48.24
08.01.02 CUMBRERA ARTICULADA DE TEJA ANDINA 40.53 M
EN ZONA 1 1 8.025 8.03
EN ZONA 2 1 24.5 24.50
EN ZONA 3 1 8.00 8.00
08.02.00 PRUEBAS Y ENSAYOS
08.02.01 PRUEBA DE CALIDAD DE CONCRETO 40.00 UND
40 40.00
08.02.02 DISEÑO DE MEZCLAS 6.00 UND
6 6.00
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.01.95 ACERO FY=4200 KG/CM2 PARA SOBRECIMIENTO REFORZADO
EN ACCESO PRINCIPAL LONGITUDINAL Ø 3/8" 3.385 2 1 6.77
Ø 3/8" 1.40 1 1 1.40
Ø 3/8" 0.64 3 1 1.92
VERTICALES Ø 3/8" 0.58 5 1 2.90
Ø 3/8" 0.71 5 1 3.55
Ø 3/8" 0.84 12 1 10.08
EN RAMPA DE ACCESO PRINCIPAL LONGITUDINAL Ø 3/8" 9.88 2 1 19.76
VERTICALES Ø 3/8" 0.74 50 1 37.00
ENTRE ZONA 4 Y ZONA 6 LONGITUDINAL Ø 3/8" 4.52 6 2 54.24
VERTICALES Ø 3/8" 1.21 23 2 55.66
EN RAMPA ENTRE ZONA 4 Y ZONA 6 LONGITUDINAL Ø 3/8" 21.54 16 1 344.64
VERTICALES Ø 3/8" 2.12 108 2 457.92
TOTAL (ML) 0.00 0.00 0.00 0.00 995.84 0.00
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 0.00 0.00 577.59 0.00
577.59
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.02.95 ACERO FY=4200 KG/CM2 PARA ZAPATAS
ZAPATA 1 LONGITUDINAL Ø 5/8" 2.225 6 4 53.40
TRANSVERSAL Ø 5/8" 1.03 6 4 24.60
ZAPATA 2 LONGITUDINAL Ø 5/8" 2.225 6 2 26.70
TRANSVERSAL Ø 5/8" 1.03 6 2 12.30
ZAPATA 7 LONGITUDINAL Ø 5/8" 1.025 6 3 18.45
TRANSVERSAL Ø 5/8" 1.025 6 3 18.45
ZAPATA 3 LONGITUDINAL Ø 5/8" 1.25 5 8 50.00
TRANSVERSAL Ø 5/8" 0.90 6 8 43.20
ZAPATA 4 LONGITUDINAL Ø 5/8" 1.525 8 10 122.00
TRANSVERSAL Ø 5/8" 1.475 8 10 118.00
ZAPATA 5 LONGITUDINAL Ø 5/8" 0.825 5 2 8.25
TRANSVERSAL Ø 5/8" 0.825 5 2 8.25
ZAPATA 6 LONGITUDINAL Ø 5/8" 1.025 6 4 24.60
TRANSVERSAL Ø 5/8" 1.025 6 4 24.60
ZAPATA 8 MURO DE CONTENCION LONGITUDINAL Ø 5/8" 10.1 14 1 141.40
TRANSVERSAL Ø 5/8" 1.25 52 1 65.00
LONGITUDINAL Ø 5/8" 2.15 14 1 30.10
TRANSVERSAL Ø 5/8" 1.25 12 1 15.00
TOTAL (ML) 0.00 0.00 804.30 0.00 0.00 0.00
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 1,286.88 0.00 0.00 0.00
1,286.88
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.06.95 ACERO FY=4200 KG/CM2 EN PLACAS
EN MURO DE CONTENCIÓN LONGITUDINAL Ø 3/8" 11.95 24 1 286.80
VERTICALES Ø 1/2" 2.60 48 2 249.60
TOTAL (ML) 0.00 0.00 0.00 249.60 286.80 0.00
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 0.00 254.59 166.34 0.00
420.94
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.08.95 ACERO FY=4200 KG/CM2 EN COLUMNAS
ZONA 1 ADMINISTRACION Y ACCESO
COLUMNA C-1 LONGITUDINAL Ø 5/8" 5.425 6 4 130.20
Ø 5/8" 5.08 4 4 81.20
ESTRIBOS Ø 3/8" 1.13 30 4 135.60
Ø 3/8" 1.55 27 4 167.40
COLUMNA C-2 LONGITUDINAL Ø 5/8" 5.075 10 2 101.50
ESTRIBOS Ø 3/8" 1.13 27 2 61.02
Ø 3/8" 1.55 27 2 83.70
COLUMNA C-3 EJE 1 Y 3 LONGITUDINAL Ø 5/8" 6.34 4 2 50.72
ESTRIBOS Ø 3/8" 0.85 38 2 64.60
COLUMNA C-3 RESTO LONGITUDINAL Ø 5/8" 5.075 4 5 101.50
ESTRIBOS Ø 3/8" 0.85 27 5 114.75
COLUMNA C-10 LONGITUDINAL Ø 5/8" 5.525 8 3 132.60
ESTRIBOS Ø 3/8" 1.3 33 3 128.70
COLUMNETAS CA-1 LONGITUDINAL Ø 3/8" 2.125 4 9 76.50
ESTRIBOS Ø 1/4" 0.54 9 9 43.74
ZONA 2 LABORATORIOS
COLUMNA C-3 EN EJE 4 Y 12 LONGITUDINAL Ø 5/8" 6.34 4 2 50.72
ESTRIBOS Ø 3/8" 0.85 38 2 64.60
COLUMNA C-3 RESTO LONGITUDINAL Ø 5/8" 5.075 4 4 81.20
ESTRIBOS Ø 3/8" 0.85 27 4 91.80
COLUMNA C-4 EN EJE 4 Y 12 LONGITUDINAL Ø 5/8" 5.43 4 4 86.80
LONGITUDINAL Ø 5/8" 5.08 4 4 81.20
ESTRIBOS Ø 3/8" 1.21 30 4 145.20
ESTRIBOS Ø 3/8" 1.21 27 4 130.68
COLUMNA C-4 RESTO LONGITUDINAL Ø 5/8" 5.08 8 4 162.40
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
ESTRIBOS Ø 3/8" 1.21 27 8 261.36
COLUMNA C-5 LONGITUDINAL Ø 5/8" 5.08 14 8 568.40
LONGITUDINAL Ø 1/2" 5.08 4 8 162.40
ESTRIBOS Ø 3/8" 1.95 27 8 421.20
ESTRIBOS Ø 3/8" 1.83 27 8 395.28
ESTRIBOS Ø 3/8" 0.9 27 8 194.40
ESTRIBOS Ø 3/8" 0.65 27 8 140.40
COLUMNA C-5 -1 LONGITUDINAL Ø 5/8" 5.08 20 2 203.00
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
ESTRIBOS Ø 3/8" 1.95 27 2 105.30
ESTRIBOS Ø 3/8" 1.83 27 2 98.82
ESTRIBOS Ø 3/8" 0.9 27 2 48.60
ESTRIBOS Ø 3/8" 0.65 27 2 35.10
COLUMNETAS CA -2 LONGITUDINAL Ø 3/8" 2.20 4 16 140.80
ESTRIBOS Ø 1/4" 0.54 13 16 112.32
COLUMNETA CA-3 LONGITUDINAL Ø 3/8" 3.13 4 19 237.50
ESTRIBOS Ø 1/4" 0.54 17 19 174.42
ZONA 3 SS HH.
COLUMNA C-6 EJE 13 Y 15 LONGITUDINAL Ø 5/8" 5.68 4 4 90.80
ESTRIBOS Ø 3/8" 0.85 34 4 115.60
COLUMNA C-6 RESTO LONGITUDINAL Ø 5/8" 5.08 4 7 142.10
ESTRIBOS Ø 3/8" 0.85 27 7 160.65
COLUMNA C-7 LONGITUDINAL Ø 5/8" 5.43 8 4 173.60
ESTRIBOS Ø 3/8" 1.15 30 8 276.00
COLUMNA C-8 LONGITUDINAL Ø 5/8" 8.93 4 2 71.40
ESTRIBOS Ø 3/8" 0.85 55 2 93.50
COLUMNA C-9 LONGITUDINAL Ø 5/8" 8.93 8 4 285.60
ESTRIBOS Ø 3/8" 1.15 55 8 506.00
COLUMNETA CA-4 LONGITUDINAL Ø 3/8" 2.05 4 2 16.40
ESTRIBOS Ø 1/4" 0.54 12 2 12.96
TOTAL (ML) 0.00 0.00 2,594.94 162.40 4,511.46 343.44
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 4,151.90 165.65 2,616.65 85.86
7,020.06
CANT DE ELEMENTOS
Nº DE VECES
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.09.95 EJE D
ACERO FY=4200 KG/CM2 EN VIGAS
ZONA 1 ADMINISTRACION
VP - 101- 103 LONGITUDINAL Ø 1/2" 7.24 2 2 28.96
LONGITUDINAL Ø 1/2" 7.14 2 2 28.56
ESTRIBOS Ø 3/8" 0.95 52 2 98.80
LONGITUDINAL INC Ø 1/2" 7.62 2 2 30.48
LONGITUDINAL INC Ø 1/2" 4.26 2 2 17.04
LONGITUDINAL INC Ø 1/2" 4.3 2 2 17.20
ESTRIBOS Ø 3/8" 0.95 53 2 100.70
VP - 102 LONGITUDINAL Ø 1/2" 3.87 2 1 7.74
LONGITUDINAL Ø 1/2" 3.77 2 1 7.54
ESTRIBOS Ø 3/8" 0.95 28 2 53.20
VS - 101 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08
ESTRIBOS Ø 3/8" 0.95 50 1 47.50
VS -102 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08
ESTRIBOS Ø 3/8" 0.95 56 1 53.20
VS - 103 LONGITUDINAL Ø 1/2" 7.27 4 1 29.08
ESTRIBOS Ø 3/8" 0.95 48 1 45.60
V"S" PUERTA PRINCIPAL LONGITUDINAL Ø 1/2" 6.82 4 1 27.28
LONGITUDINAL Ø 3/8" 6.71 4 1 26.84
ESTRIBOS Ø 3/8" 1.40 48 1 67.20
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
VIGUETA SOLERA LONGITUDINAL Ø 3/8" 2.18 4 1 8.72
ESTRIBOS Ø 1/4" 0.55 20 1 11.00
LONGITUDINAL Ø 3/8" 1.52 4 1 6.08
ESTRIBOS Ø 1/4" 0.55 14 1 7.70
LONGITUDINAL Ø 3/8" 2.18 4 1 8.72
ESTRIBOS Ø 1/4" 0.55 17 1 9.35
LONGITUDINAL Ø 3/8" 2.50 4 1 10.00
ESTRIBOS Ø 1/4" 0.55 20 1 11.00
ZONA 2 LABORATORIOS
VP - 104 - 107 LONGITUDINAL Ø 1/2" 7.24 4 2 57.92
LONGITUDINAL INC Ø 1/2" 7.62 2 2 30.48
LONGITUDINAL INC Ø 1/2" 4.26 2 2 17.04
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
LONGITUDINAL INC Ø 1/2" 4.3 2 2 17.20
ESTRIBOS Ø 3/8" 0.95 53 2 100.70
ESTRIBOS Ø 3/8" 0.95 53 2 100.70
VP - 105 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96
ESTRIBOS Ø 3/8" 0.95 54 1 51.30
VP - 106 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96
ESTRIBOS Ø 3/8" 0.95 60 1 57.00
VS-104 Y 105 LONGITUDINAL Ø 1/2" 23.74 4 2 189.92
ESTRIBOS Ø 3/8" 0.95 168 2 319.20
VS -106 LONGITUDINAL Ø 1/2" 2.37 4 1 9.48
ESTRIBOS Ø 3/8" 0.95 17 1 16.15
VIGUETA SOLERA LONGITUDINAL Ø 3/8" 2.13 4 2 17.04
ESTRIBOS Ø 1/4" 0.55 17 2 18.70
LONGITUDINAL Ø 3/8" 2.20 4 2 17.60
ESTRIBOS Ø 1/4" 0.55 17 2 18.70
LONGITUDINAL Ø 3/8" 1.13 4 1 4.52
ESTRIBOS Ø 1/4" 0.55 8 1 4.40
LONGITUDINAL Ø 3/8" 2.30 4 1 9.20
ESTRIBOS Ø 1/4" 0.55 18 1 9.90
LONGITUDINAL Ø 3/8" 2.13 4 1 8.52
ESTRIBOS Ø 1/4" 0.55 17 1 9.35
LONGITUDINAL Ø 3/8" 3.30 4 1 13.20
ESTRIBOS Ø 1/4" 0.55 28 1 15.40
LONGITUDINAL Ø 3/8" 3.20 4 4 51.20
ESTRIBOS Ø 1/4" 0.55 27 4 59.40
LONGITUDINAL Ø 3/8" 1.10 4 1 4.40
ESTRIBOS Ø 1/4" 0.55 8 1 4.40
CANT DE ELEMENTOS
Nº DE VECES
LONGITUDINAL Ø 3/8" 1.33 4 1 5.32
ESTRIBOS Ø 1/4" 0.55 10 1 5.50
LONGITUDINAL Ø 3/8" 1.53 4 1 6.12
ESTRIBOS Ø 1/4" 0.55 12 1 6.60
ZONA 3 SS.HH.
VP-108 Y 110 LONGITUDINAL Ø 1/2" 7.62 4 2 60.96
LONGITUDINAL INC Ø 1/2" 8.04 2 2 32.16
LONGITUDINAL INC Ø 1/2" 4.76 2 2 19.04
LONGITUDINAL INC Ø 1/2" 4.32 2 2 17.28
ESTRIBOS Ø 3/8" 0.95 59 2 112.10
ESTRIBOS Ø 3/8" 0.95 66 2 125.40
VP -109 LONGITUDINAL Ø 1/2" 7.62 4 1 30.48
ESTRIBOS Ø 3/8" 0.95 62 1 58.90
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
VS - 107 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96
ESTRIBOS Ø 3/8" 0.95 54 1 51.30
VS - 108 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96
ESTRIBOS Ø 3/8" 0.95 56 1 53.20
VS -109 LONGITUDINAL Ø 1/2" 7.24 4 1 28.96
ESTRIBOS Ø 3/8" 0.95 54 1 51.30
VS - 110 LONGITUDINAL Ø 1/2" 2.44 4 1 9.76
ESTRIBOS Ø 3/8" 0.70 17 1 11.90
ZONA 4 CISTERNA Y TANQUE ELEVADO
VP -111 Y 112 LONGITUDINAL Ø 1/2" 3.74 4 2 29.92
ESTRIBOS Ø 3/8" 0.95 27 2 51.30
VP - 113 - 114 LONGITUDINAL Ø 1/2" 3.74 4 2 29.92
ESTRIBOS Ø 3/8" 0.95 24 2 45.60
VP -201 Y 202 LONGITUDINAL Ø 1/2" 3.74 4 2 29.92
ESTRIBOS Ø 3/8" 0.95 24 2 45.60
VP - 203 - 204 LONGITUDINAL Ø 1/2" 3.74 4 2 29.92
ESTRIBOS Ø 3/8" 0.95 24 2 45.60
VIGUETA SOLERA LONGITUDINAL Ø 3/8" 1.25 4 1 5.00
ESTRIBOS Ø 1/4" 0.55 9 1 4.95
VIGUETA SOLERA PARAPETO TQUE. ELEV. LONGITUDINAL Ø 3/8" 3.72 4 3 44.64
ESTRIBOS Ø 1/4" 0.55 33 3 54.45
VIGUETA SOLERA LONGITUDINAL Ø 3/8" 2.71 4 1 10.84
ESTRIBOS Ø 1/4" 0.55 25 1 13.75
TOTAL (ML) 0.00 0.00 0.00 1,008.24 2,021.41 264.55
CANT DE ELEMENTOS
Nº DE VECES
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 0.00 1,028.40 1,172.42 66.14
2,266.96
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.10.95 ACERO FY=4200 KG/CM2 EN LOSA
LOSA 1 CISTERNA TANQUE ELEVADO ARMADURA SUPERIOR Ø 3/8" 7.75 11 2 170.50
ARMADURA INFERIOR Ø 1/2" 7.75 13 2 201.50
LOSA 2 CISTERNA TANQUE ELEVADO ARMADURA SUPERIOR Ø 3/8" 7.75 11 2 170.50
ARMADURA INFERIOR Ø 1/2" 7.75 13 2 201.50
TOTAL (ML) 0.00 0.00 0.00 403.00 341.00 0.00
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 0.00 411.06 197.78 0.00
608.84
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.14.95 ACERO FY=4200 KG/CM2 EN CISTERNA
EN MUROS HORIZONTAL Ø 3/8" 2.2 18 2 79.20
HORIZONTAL Ø 3/8" 3.7 18 2 133.20
VERTICAL Ø 3/8" 4.35 10 4 174.00
VERTICAL Ø 3/8" 4.35 18 4 313.20
EN LOSA INFERIOR LONGITUDINAL Ø 3/8" 1.48 10 2 29.60
LONGITUDINAL Ø 3/8" 1.75 10 1 17.50
LONGITUDINAL Ø 3/8" 2.55 10 1 25.50
LONGITUDINAL Ø 3/8" 1.87 10 2 37.40
TRANSVERSAL Ø 3/8" 1.18 5 4 23.60
TRANSVERSAL Ø 3/8" 1.25 5 1 6.25
TRANSVERSAL Ø 3/8" 2.05 5 1 10.25
TRANSVERSAL Ø 3/8" 2.5 16 2 80.00
LOSA DE TECHO LONGITUDINAL Ø 3/8" 2.57 3 2 15.42
LONGITUDINAL Ø 3/8" 3.72 5 2 37.20
TRANSVERSAL Ø 3/8" 2.25 12 2 54.00
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
TRANSVERSAL Ø 3/8" 0.85 4 2 6.80
TOTAL (ML) 0.00 0.00 0.00 0.00 1,043.12 0.00
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 0.00 0.00 605.01 0.00
605.01
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.15.95 ACERO FY=4200 KG/CM2 EN SUMIDERO PLUVIAL
MUROS HORIZONTAL Ø 3/8" 1.5 5 12 90.00
VERTICAL Ø 3/8" 0.85 16 3 40.80
ACERO DE LOSA DE FONDO HORIZONTAL Ø 3/8" 1.05 5 3 15.75
TRANSVERSAL Ø 3/8" 1.05 5 3 15.75
EN TAPA HORIZONTAL Ø 3/8" 0.67 4 3 8.04
TRANSVERSAL Ø 3/8" 0.67 4 3 8.04
Ø 3/8"
TOTAL (ML) 0.00 0.00 0.00 0.00 178.38 0.00
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 0.00 0.00 103.46 0.00
103.46
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
METRADOS (ACERO F'Y=4200 Kg/cm2 )
ITEM PARTIDA DESCRIPCION TIPO Ø LONG PARCIAL Ø 1" Ø 3/4" Ø 5/8" Ø 1/2" Ø 3/8" Ø 1/4"
05.16.95 ACERO FY=4200 KG/CM2 EN MESAS DE TRABAJO
LOSA SUPERIOR LONGITUDINAL Ø 3/8" 3.54 6 4 84.96
TRANSVERSAL Ø 3/8" 0.94 16 4 60.16
TRANSVERSAL Ø 3/8" 0.25 4 4 4.00
EN MUROS VERTICAL Ø 3/8" 1.55 5 32 248.00
HORIZONTAL Ø 3/8" 0.84 6 32 161.28
VERTICAL Ø 3/8" 1.55 3 8 37.20
HORIZONTAL Ø 3/8" 0.7 5 8 28.00
EN CUBA LONGITUDINAL Ø 3/8" 0.89 5 4 17.80
TRANSVERSAL Ø 3/8" 1 4 4 16.00
MESA DE CONCRETO LONGITUDINAL Ø 3/8" 3.44 4 5 68.80
TRANSVERSAL Ø 3/8" 0.54 18 5 48.60
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
CANT DE ELEMENTOS
Nº DE VECES
COLUMNETA VERTICAL Ø 3/8" 1.35 4 15 81.00
ESTRIBOS Ø 1/4" 0.55 9 15 74.25
TOTAL (ML) 0.00 0.00 0.00 0.00 855.80 74.25
TOTAL (KG)
4.04 2.26 1.60 1.02 0.58 0.25
0.00 0.00 0.00 0.00 496.36 18.56
514.93
METRADOARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
09.00.00 ALBAÑILERIA
09.01.00 MUROS DEL LADRILLO DE ARCILLA K.K.
09.01.01 MURO DE LADRILLO K.K. DE SOGA MEXCLA C:A 1.5 110.73 M2
ZONA 1 ADMINISTRACION
EJE A 1 2.5 0.8 2.00
EJE C 1 3.475 0.8 2.78
ZONA 2 LABORATORIOS
EJE D 1 10.8 1.9 20.52
EJE F 1 13.7 1.1 15.07
EJE E 1 0.625 2.65 1.66
ZONA 3 SS.HH.
ENTRE EJE 13 Y 14 1 1.8 2.65 4.77
EJE H 1 6.25 2.65 16.56
DIVISORES DE BAÑOS 5 1.5 1.75 13.13
5 0.2 1.75 1.75
1 0.9 1.75 1.58
ZONA 4 CISTERNA Y TANQUE ELEVADO
EN EJE 16 Y 17 2 1.45 2.65 7.69
EJE K Y M 2 2.7 2.65 14.31
EN PARAPETO DE LOSA 2 1 11.9 0.75 8.93
09.01.02 MURO DE LADRILLO K.K. DE CABEZA MEXCLA C:A 1.5 207.92 M2
ZONA 1 ADMINISTRACION
EJE 1 Y 3 4 2.975 2.65 31.54
4 2.98 0.83 9.89
EJE 2 1 1.725 2.65 4.57
EJE A Y C 2 0.8 2.65 4.24
EJE B 1 5.025 2.65 13.32
ZONA 2 LABORATORIOS
EJE 4 Y 12 4 3.125 2.65 33.13
4 3.125 0.806 10.08
EJE 7 2 3.125 2.65 16.56
EJE 11 2 2.075 2.65 11.00
ZONA 3 SS.HH.
EJE 13 Y 15 2 0.9 2.65 4.77
4 0.25 2.65 2.65
2 0.637 2.65 3.38
2 0.662 2.65 3.51
2 0.225 2.65 1.19
2 1.55 2.65 8.22
8 0.4 2.25 7.20
4 1.55 0.512 3.17
2 2.98 1.052 6.27
EJE 14 1 6.375 2.65 16.89
EJE G 1 2.501 2.65 6.63
1 0.4 2.25 0.90
EJE J 1 2.652 2.65 7.03
2 0.4 2.25 1.80
10.00.00 REVOQUES ENLUCIDOS Y MOLDEDURAS
10.03.00 TARRAJEO DE MUROS
10.03.02 TARRAJEO MUROS EXTERIORES E INTERIORES FROTACHODO MEXCL. C:A 1.5 E=2cm 653.41 M2
DE CABEZA
ZONA 1 ADMINISTRACION
EJE 1 Y 3 8 2.975 2.7 64.26
8 2.98 0.83 19.79
EJE 2 2 1.725 2.7 9.32
EJE A Y C 4 0.8 2.7 8.64
EJE B 2 5.025 2.7 27.14
ZONA 2 LABORATORIOS
EJE 4 Y 12 8 3.125 2.7 67.50
8 3.125 0.806 20.15
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
EJE 7 4 3.125 2.7 33.75
EJE 11 4 2.075 2.7 22.41
ZONA 3 SS.HH.
EJE 13 Y 15 4 0.9 2.7 9.72
8 0.25 2.7 5.40
4 0.637 2.7 6.88
4 0.662 2.7 7.15
4 0.225 2.7 2.43
4 1.55 2.7 16.74
16 0.4 2.3 14.72
8 1.55 0.512 6.35
4 2.98 1.052 12.54
EJE 14 2 6.375 2.7 34.43
EJE G 2 2.501 2.7 13.51
2 0.4 2.3 1.84
EJE J 2 2.652 2.7 14.32
4 0.4 2.3 3.68
DE SOGA
ZONA 1 ADMINISTRACION
EJE A 2 2.5 0.85 4.25
EJE C 2 3.475 0.85 5.91
ZONA 2 LABORATORIOS
EJE D 2 10.8 1.95 42.12
EJE F 2 13.7 1.1 30.14
EJE E 2 0.625 2.7 3.38
ZONA 3 SS.HH.
ENTRE EJE 13 Y 14 2 1.8 2.7 9.72
EJE H 2 6.25 2.7 33.75
DIVISORES DE BAÑOS 10 1.5 1.8 27.00
10 0.2 1.8 3.60
2 0.9 1.8 3.24
ZONA 4 CISTERNA Y TANQUE ELEVADO
EN EJE 16 Y 17 4 1.45 2.7 15.66
EJE K Y M 4 2.7 2.7 29.16
EN PARAPETO DE LOSA 2 2 11.9 0.75 17.85
EN SOBRECIENTO REFORZADO
EN GRADAS DE ACCESO 1 3.5 0.127 0.44
1 2.5 0.127 0.32
1 1.5 0.127 0.19
1 0.75 0.38 0.29
EN RAMPA 1 9.276 0.38 3.52
1 0.6 0.38 0.23
10.03.06 TARRAJEO CON IMPERMEABILIZANTE 19.47 M2
EN MUROS 2 1.5 1.55 4.65
2 3 1.55 9.30
LOSA DE FONDO 1 3 1.5 4.50
1 3.4 0.3 1.02
10.03.07 PIZARRA ACRILICA 5.00 UND
5 5.00
10.05.00 TARRAJEO DE COLUMNAS
10.05.02 TARRAJEO EN COLUMNA MEZCL. C:A 1.5 E= 2cm 398.62 M2
ZONA 1 ADMINISTRACION Y ACCESO
COLUMNA C.1 4 1 4.64 18.56
4 0.75 4.64 13.92
COLUMNA C-2 2 2 4.05 16.20
COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83
COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19
COLUMNA C-10 3 1.257 4.5 16.96
COLUMNETA CA-1 9 0.3 1.55 4.19
ZONA 2 LABORATORIOS
COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77
2 1.45 4.05 11.75
COLUMNA C-5 10 2.55 4.05 103.27
COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83
1 0.35 5.66 1.98
COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07
1 0.35 4.05 1.42
1 0.5 4.05 2.03
COLUMNETA CA-2 16 0.45 2.65 19.08
COLUMNETA CA-3 19 0.45 1.85 15.82
ZONA 3 SS.HH.
COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62
1 0.5 5.17 2.59
1 0.35 5.17 1.81
COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11
1 0.25 4.05 1.01
2 0.5 4.05 4.05
1 0.2 4.05 0.81
COLUMNA C-7 3 1.35 4.64 18.79
1 1.1 4.64 5.10
EN ZONA 4 CISTERNA Y TANQUE ELEVADO
COLUMNA C-8 2 0.8 7.9 12.64
COLUMNA C-9 2 1.3 7.9 20.54
2 1.45 7.9 22.91
COLUMNETA CA-4 1 0.45 1.55 0.70
COLUMNETAS EN PARAPETO
LOSA 2 16 0.15 0.9 2.16
10.06.00 TARRAJEO EN VIGAS
10.06.02 TARRAJEO DE VIGAS C:A 1:5 E=2cm 138.97 M2
ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL
EJE 1 Y 3 8 2.85 0.3 6.84
4 6.2 0.3 7.44
EJE 2 2 1.73 0.3 1.04
1 1 0.85 0.85
EJE A Y C 4 0.8 0.3 0.96
2 1.92 0.85 3.26
2 2.25 0.85 3.82
EJE B 2 3.5 0.3 2.10
2 1.52 0.3 0.91
1 1 0.85 0.85
VIGUETAS SOLERAS
EN EJE A 2 2.5 0.15 0.75
EN EJE C 2 3.325 0.15 1.00
ZONA 2 LABORATORIOS
EJE 4 Y 12 8 3.13 0.3 7.51
4 6.5 0.3 7.80
EJE 7 4 3.125 0.3 3.75
EJE 11 4 2.08 0.3 2.50
2 0.8 0.85 1.36
EJE D 2 17.98 0.85 30.57
EJE E 2 1.625 0.3 0.98
VIGUETAS SOLERAS
EJE D 2 11.8 0.15 3.54
EJE F 2 13.7 0.15 4.11
ZONA 3 SS.HH.
EJE 13 Y 15 4 6.08 0.3 7.30
4 6.71 0.3 8.05
EJE 14 2 6.375 0.3 3.82
EJE G 2 3.51 0.3 2.11
1 3.2 0.85 2.72
EJE H 2 6.25 0.3 3.75
EJE J 2 2.64 0.3 1.58
1 2.8 0.85 2.38
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
ENTRE EJE 13 Y 14 2 1.8 0.3 1.08
ZONA 4 CISTERNA Y TANQUE ELEVADO
EN EJE 16 Y 17 LOSA 1 4 1.45 0.3 1.74
2 1 0.85 1.70
EN EJE K Y M LOSA 1 4 2.7 0.3 3.24
EN EJE 16 Y 17 LOSA 2 4 1.45 0.3 1.74
2 1 0.85 1.70
EN EJE K Y M LOSA 2 4 2.7 0.3 3.24
VIGUETAS SOLERAS
EJE 16 2 0.65 0.15 0.20
EN PARAPETO 2 2.3 0.15 0.69
10.11.00 VESTIDURA DE DERRAMES
10.11.02 VESTIDURA DERRAMES ANCHO 0.10 MEZCL. C:A 1:5 E=2cm 9.12 M2
ZONA 1 ADMINISTRACION Y ACCESO
EJEA 1 3.175 0.15 0.48
EJE C 1 4.175 0.15 0.63
ZONA 2 LABORATORIOS
EJE D 1 13.5 0.15 2.03
EJE F 1 16.95 0.15 2.54
ZONA 3 SS. HH.
EJE G 3 0.4 0.25 0.30
EJE J 6 0.4 0.25 0.60
EJE 13 Y 15 24 0.4 0.25 2.40
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 1 1 0.15 0.15
10.18.00 BRUÑAS
10.18.01 BRUÑAS DE 1"cm 358.43 M
ZONA 1 ADMINISTRACION
EJE 1 Y 3 8 2.4 19.20
4 2.975 11.90
4 2.4 9.60
4 2.975 11.90
EJE 2 2 2.6 5.20
2 1.725 3.45
EJE A 2 2.4 4.80
8 0.45 3.60
2 1.575 3.15
2 0.925 1.85
EJE C 2 2.4 4.80
2 0.8 1.60
4 0.45 1.80
2 1.575 3.15
2 1.9 3.80
ZONA 2 LABORATORIOS
EJE 4 Y 12 8 2.4 19.20
2 2.6 5.20
8 3.125 25.00
EJE 7 4 2.6 10.40
4 3.125 12.50
EJE 11 8 2.6 20.80
4 2.075 8.30
EJE D 16 1.65 26.40
1 10.8 10.80
EJE F 22 0.85 18.70
1 13.845 13.84
ZONA 3 SS.HH.
EJE 13 Y 15 16 2.4 38.40
2 4.474 8.95
2 6.075 12.15
4 0.28 1.12
8 0.737 5.90
2 5.71 11.42
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
EJE G 2 2.4 4.80
1 2.501 2.50
EJE J 4 2.4 9.60
1 2.652 2.65
11.00.00 CIELORASOS
11.03.01 CIELORASO DE MEZCLA C:A 1:5 DE CEMENTO 9.00 M2
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3.00 3.00 9.00
11.04.00 CIELOSRASOS DE GYPLAC
11.04.01 CIELORASO DE GYPLAC ST 224.47 M2
ZONA 1 ADMINISTRACIÓN
SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67
DIRECCION 1 3.5 3.125 10.94
SALA DE PROFESORES 1 6.525 3.125 20.39
ALEROS 1 1.5 7.875 11.81
1 1 7.875 7.88
2 7 0.5 7.00
ZONA 2 LABORATORIO
ALMACEN 1 3.125 1.625 5.08
CONTROL DE ARCHIVOS 1 3.125 1.625 5.08
LABORATORIO DE COMPUTO 1 6.5 8 52.00
ALEROS 1 1.5 24.5 36.75
1 1 24.5 24.50
2 7 0.5 7.00
ZONA 3 SS.HH.
ALEROS 1 1.5 8 12.00
1 1 8 8.00
2 7.375 0.5 7.38
11.04.02 CIELORASO DE GYPLAC RH 41.15 M2
ZONA 3 SS.HH. 1 3.125 1.7 5.31
2 1.487 1.7 5.06
2 4.925 3.125 30.78
11.04.03 CIELORASO DE GYPLAC RF 18.69 M2
LABORATORIO DE FISICA Y QUIMICA 1 2.875 6.5 18.69
11.04.04 ENTRAMADO DE CIELORASO MADERA 2" x 2" x 10 1286.00 M
ZONA 1 ADMINISTRACIÓN 15 8 120.00
13 9.5 123.50
ZONA 2 LABORATORIO 41 9.5 389.50
16 24.5 392.00
ZONA 3 SS.HH. 14 9.5 133.00
16 8 128.00
12.00.00 PISOS Y PAVIMENTOS
12.01.01 CONTRAPISO E=40 MM BASE 3 CM MEZC. 1:5 ACAB. 1 CM PASTA 1:2 232.88 M2
ZONA 1 ADMINISTRACIÓN
SECRETARIA 1 3.125 2.775 8.67
1 1 0.15 0.15
1 2.25 0.1 0.23
DIRECCION 1 3.5 3.125 10.94
1 1.925 0.1 0.19
1 1 0.25 0.25
SALA DE PROFESORES 1 6.51 2.975 19.37
1 2.775 0.15 0.42
1 2.25 0.1 0.23
1 3.5 0.15 0.53
1 1.925 0.1 0.19
ZONA 2 LABORATORIOS
ALMACEN 1 3.125 1.65 5.16
1 0.8 0.25 0.20
ARCHIVO 1 3.225 1.625 5.24
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
1 0.8 0.25 0.20
LABORATORIO DE FISICA Y QUIMICA 1 12.875 5.5 70.81
2 1.625 0.5 1.63
6 3.5 0.5 10.50
2 1.2 0.15 0.36
1 3.025 0.1 0.30
LABORATORIO DE COMPUTO 1 8 5.5 44.00
6 2.5 0.5 7.50
1 2.05 0.1 0.21
1 1.2 0.15 0.18
ZONA 3
SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66
1 0.9 0.25 0.23
SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66
1 0.9 0.25 0.23
SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63
1 1 0.25 0.25
SS.HH ALUMNOS 1 4.925 1.625 8.00
5 1.35 0.9 6.08
5 0.7 0.15 0.53
1 1.663 1.5 2.49
1 0.6 0.15 0.09
1 1.5 1.012 1.52
1 4.925 1.625 8.00
1 1.775 1.5 2.66
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3 1.3 3.90
1 2.7 0.1 0.27
1 1 0.25 0.25
12.05.04 PISO DE CERAMICA DE 30 x 30 CM ANTIDESLIZANTE 190.91 M2
ZONA 1 ADMINISTRACION
SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67
1 1 0.15 0.15
1 2.25 0.1 0.23
ZONA 2 LABORATORIO
ALMACEN 1 3.125 1.65 5.16
1 0.8 0.25 0.20
LABORATORIO DE FISICA Y QUIMICA 1 12.875 5.5 70.81
2 1.625 0.5 1.63
6 3.5 0.5 10.50
2 1.2 0.15 0.36
1 3.025 0.1 0.30
LABORATORIO DE COMPUTO 1 8 5.5 44.00
6 2.5 0.5 7.50
1 2.05 0.1 0.21
1 1.2 0.15 0.18
ZONA 3 SS.HH.
SS.HH. PROFESORES DAMAS 1 1.8 1.48 2.66
1 0.9 0.25 0.23
SS.HH. PROFESORES VARONES 1 1.8 1.48 2.66
1 0.9 0.25 0.23
SS.HH. DISCAPACITADOS 1 1.8 3.125 5.63
1 1 0.25 0.25
SS.HH ALUMNOS 1 4.925 1.625 8.00
5 1.35 0.9 6.08
5 0.7 0.15 0.53
1 1.663 1.5 2.49
1 0.6 0.15 0.09
1 1.5 1.012 1.52
1 4.925 1.625 8.00
1 1.775 1.5 2.66
12.10.03 PISO DE CEMENTO FROTACHADO E=2” ,MEZCLA 1:4 10.24 M2
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3.2 3.2 10.24
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
12.12.02 PISO DE PARQUET 37.55 M2
ZONA 1 ADMINISTRACIÓN
DIRECCION 1 3.5 3.125 10.94
1 1.925 0.1 0.19
1 1 0.25 0.25
SALA DE PROFESORES 1 6.51 2.975 19.37
1 2.775 0.15 0.42
1 2.25 0.1 0.23
1 3.5 0.15 0.53
1 1.925 0.1 0.19
ZONA 2 LABORATORIOS
ARCHIVO 1 3.225 1.625 5.24
1 0.8 0.25 0.20
12.51.01 CONCRETO F’C 175 KG/CM2 EN VEREDAS 39.26 M3
ZONA 1 ADMINISTRACIÓN 1 9.7 8.725 0.1 8.46
-1 7.025 7 0.1 -4.92
ZONA 2 LABORATORIOS 1 25.2 9.35 0.1 23.56
-1 23.5 7 0.1 -16.45
ZONA 3 SS.HH. 1 10.075 9.1 0.1 9.17
-1 7.375 7 0.1 -5.16
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 5.2 5.2 0.1 2.70
-1 3.5 3.5 0.1 -1.23
VEREDA DE ACCESO PRINCIPAL 1 13.98 0.1 1.40
1 5 1.41 0.1 0.71
1 17.425 5 0.1 8.71
1 6.695 2.1 0.1 1.41
1 3.7 3.23 0.1 1.20
1 2.25 6.31 0.1 1.42
1 2.1 6.96 0.1 1.46
ENTRE ZONA 3 Y ZONA 5 1 9.55 1.425 0.1 1.36
1 4.075 1.75 0.1 0.71
1 3.225 0.77 0.1 0.25
1 3.225 3.129 0.1 1.01
1 1.55 1.379 0.1 0.21
ENTRE ZONA 4 Y ZONA 6 1 1.8 1.7 0.1 0.31
1 1.8 0.9 0.1 0.16
1 4.4 3.9 0.1 1.72
VEREDA POSTERIOR 1 12.16 0.9 0.1 1.09
12.51.02 ENCOFRADO Y DESENCOFRADO EN VEREDAS 14.21 M2
ZONA 1 ADMINISTRACION
EN ACCCESO PRINCIPAL 1 2.5 0.127 0.32
2 1.05 0.1 0.21
1 5 0.1 0.50
2 2.1 0.1 0.42
2 3.7 0.1 0.74
1 13.64 0.1 1.36
8 2.5 0.1 2.00
2 2.1 0.1 0.42
2 2.4 0.1 0.48
EN VEREDAS DE ADMINISTRACION 10 0.85 0.1 0.85
2 1.85 0.1 0.37
ZONA 2 LABORATORIOS 16 0.85 0.1 1.36
8 1.85 0.1 1.48
ZONA 3 SS.HH. 4 1.05 0.1 0.42
8 1.35 0.1 1.08
EN VEREDA ENTRE ZONA 3 Y ZONA 5 3 1.425 0.1 0.43
EN VEREDAS ENTRE ZONA 3 Y ZONA 4 1 3.225 0.1 0.32
1 1.45 0.1 0.15
ENTRE ZONA 4 Y ZONA 6 1 4.33 0.1 0.43
5 0.9 0.1 0.45
ZONA 4 CISTERNA Y TANQUE ELEVADO 5 0.85 0.1 0.43
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
12.51.03 JUNTA ASFALTICA RC 250 141.47 M
ZONA 1 ADMINISTRACION
EN ACCCESO PRINCIPAL 1 2.5 2.50
2 1.05 2.10
1 5 5.00
2 2.1 4.20
2 3.7 7.40
1 13.64 13.64
8 2.5 20.00
2 2.1 4.20
2 2.4 4.80
EN VEREDAS DE ADMINISTRACION 10 0.85 8.50
2 1.85 3.70
ZONA 2 LABORATORIOS 16 0.85 13.60
8 1.85 14.80
ZONA 3 SS.HH. 4 1.05 4.20
8 1.35 10.80
EN VEREDA ENTRE ZONA 3 Y ZONA 5 3 1.425 4.28
EN VEREDAS ENTRE ZONA 3 Y ZONA 4 1 3.225 3.23
1 1.45 1.45
ENTRE ZONA 4 Y ZONA 6 1 4.33 4.33
5 0.9 4.50
ZONA 4 CISTERNA Y TANQUE ELEVADO 5 0.85 4.25
13.00.00 CONTRAZOCALO
13.03.00 CONTRAZOCALO DE CEMENTO
13.03.13 CONTRAZOCALO DE CEMENTO H=30cm 117.60 M
ZONA 1 ADMINISTRACION ACCESO PRINCIPAL
EJE 1 Y 3 2 7.00 14.00
EJE A 1 6.025 6.03
EJE C 1 7.025 7.03
ZONA 2 LABORATORIOS
EJE 4 Y 12 2 7.00 14.00
EJE D 1 19.9 19.90
EJE F 1 23.5 23.50
ZONA 3 SS.HH.
EJE 13 Y 15 2 7.375 14.75
EJE G 1 4.2 4.20
EJE J 1 5.00 5.00
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 Y 17 2 2.1 4.20
EJE K Y M 2 2.5 5.00
13.04.01 CONTRAZOCALO DE CERAMICO DE 10 x 30cm 78.75 M
ZONA ADMINISTRACION
SECRETARIA Y RECEPCION 1 9.426 9.43
ZONA 2 LABORATORIOS
LABORATORIO FISICA Y QUIMICA 1 36.325 36.33
LABORATORIO DE COMPUTO 2 6.5 13.00
2 8 16.00
2 2 4.00
14.00.00 ZOCALO
14.01.04 ZOCALO DE MAYOLICA DE 20 x 32 89.34 M2
ZONA 3 SS.HH
EN DOCENTES DAMAS 1 5.93 1.3 7.71
EN DOCENTES VARONES 1 5.93 1.3 7.71
DISCAPACITADOS 1 9.1 1.3 11.83
EN ALUMNOS DAMAS 3 3.55 1.3 13.84
1 14.72 1.3 19.14
EN ALUMNOS VARONES 2 3.55 1.3 9.23
1 1.95 1.3 2.54
1 1.65 0.9 1.48
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
1 10.997 1.3 14.30
1 3.9 0.4 1.56
18.00.00 CARPINTERIA DE MADERA
18.01.00 PUERTAS DE MADERA
18.01.07 PUERTA DE MADERA TIPO P1-1 1 1.00 1.00 UND
18.01.08 PUERTA DE MADERA TIPO P1-2 2 2.00 2.00 UND
18.01.09 PUERTA DE MADERA TIPO P2-1 3 3.00 3.00 UND
18.01.10 PUERTA DE MADERA TIPO P2-2 3 3.00 3.00 UND
18.01.11 PUERTA DE MADERA TIPO P3-1 2 2.00 2.00 UND
18.01.12 PUERTA DE MADERA TIPO P3-2 2 2.00 2.00 UND
19.00.00 CARPINTERIA METALICA Y HERRERIA
19,01.00 PUERTA METALICA
19.01.01 PUERTA METALICA TIPO P3-3 5 5.00 5.00 UND
19.01.02 PUERTA METALICA TIPO P4-1 1 1.00 1.00 UND
19.01.03 PUERTA METALICA TIPO PM-1 1 1.00 1.00 UND
19.01.04 PUERTA METALICA TIPO PM-2 1 1.00 1.00 UND
19.01.05 TAPA DE FIERRO EN TANQUE CISTERNA 1 1.00 1.00 UND
19.01.06 ESCALERA DE GATO 1 1.00 1.00 UND
19.01.07 ARCOS Y TABLERO DE BLASQUET 2 2.00 2.00 UND
19.01.08 PARANTES Y NET DE VOLEY 1 1.00 1.00 GLB
19.02.00 VENTANAS METALICAS
19.02.01 VENTANAS DE METAL TIPO V-1 1 1.00 1.00 UND
19.02.02 VENTANAS DE METAL TIPO V-2 1 1.00 1.00 UND
19.02.03 VENTANAS DE METAL TIPO V-3 1 1.00 1.00 UND
19.02.04 VENTANAS DE METAL TIPO V-4 1 1.00 1.00 UND
19.02.05 VENTANAS DE METAL TIPO V-5 1 1.00 1.00 UND
19.02.06 VENTANAS DE METAL TIPO V-6 2 2.00 2.00 UND
19.02.07 VENTANAS DE METAL TIPO V-7 1 1.00 1.00 UND
19.02.08 VENTANAS DE METAL TIPO V-8 1 1.00 1.00 UND
19.02.09 VENTANAS DE METAL TIPO V-9 1 1.00 1.00 UND
19.02.10 VENTANAS DE METAL TIPO V-10 1 1.00 1.00 UND
19.02.11 VENTANAS DE METAL TIPO V-11 1 1.00 1.00 UND
19.02.12 VENTANAS DE METAL TIPO V-12 1 1.00 1.00 UND
19.02.13 VENTANAS DE METAL TIPO V-13 2 2.00 2.00 UND
19.02.14 VENTANAS DE METAL TIPO V-14 1 1.00 1.00 UND
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
19.02.15 VENTANAS DE METAL TIPO V-15 1 1.00 1.00 UND
19.02.16 VENTANAS DE METAL TIPO V-16 1 1.00 1.00 UND
19.02.17 VENTANAS DE METAL TIPO V-17 1 1.00 1.00 UND
19.02.18 VENTANAS DE METAL TIPO V-18 11 11.00 11.00 UND
19.02.19 VENTANAS DE METAL TIPO V-19 1 1.00 1.00 UND
19.15.03 PASAMANOS AISLADOS DE TUB. 2" 97.78 M
EN ZONA 2 LABORATORIO 4 1.7 6.80
12 0.9 10.80
EN ZONA 4 CISTERNA 2 1 2.00
4 0.9 3.60
EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 2.9 2.90
3 0.9 2.70
EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 21.48 21.48
21 0.9 18.90
1 15.1 15.10
15 0.9 13.50
19.15.04 REJAS PARA CANAL PLUVIAL 6.47 M2
ZONA 1 ADMINISTRACION 2 2.125 0.3 1.28
ZONA 2 LABORATORIOS 1 2.44 0.3 0.73
2 1.8 0.3 1.08
ENTRE ZONA 3 Y ZONA 5 1 9.55 0.3 2.87
1 1.72 0.3 0.52
21.01.00 VIDRIOS, CRISTALES Y SIMILARES
21.01.03 VIDRIO INCOLORO TRANSPARENTE TRIPLE 476.86 P2
ZONA 1 ADMINISTRACION FACTOR
V - 1 1 1.72 1.7 10.76 31.46
V - 2 1 2.25 1.7 10.76 41.16
V-3 1 1.92 1.7 10.76 35.12
V-4 1 1.25 1.7 10.76 22.87
ZONA 2 LABORATORIOS
V-5 1 1.08 0.6 10.76 6.97
V-6 2 2.95 0.6 10.76 38.09
V-7 1 1.85 0.6 10.76 11.94
V-8 1 0.85 0.6 10.76 5.49
V-9 1 1.95 0.6 10.76 12.59
V-10 1 1.88 0.6 10.76 12.14
V-11 1 1.28 1.4 10.76 19.28
V-12 1 0.85 1.4 10.76 12.80
V-13 2 2.95 1.4 10.76 88.88
V-14 1 3.05 1.4 10.76 45.95
V-15 1 2.05 1.4 10.76 30.88
V-17 1 1.88 1.4 10.76 28.32
ZONA 3 SS-HH
V-18 11 0.4 0.4 10.76 18.94
ZONA 4 CISTERNA
V-19 1 1 1.3 10.76 13.99
22.00.00 PINTURA
22.01.04 PINTURA LATEX EN CIELORASO 293.31 M2
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 3.00 3.00 9.00
CIELORASO GYPLAC ST
ZONA 1 ADMINISTRACIÓN
SECRETARIA Y RECEPCIÓN 1 3.125 2.775 8.67
DIRECCION 1 3.5 3.125 10.94
SALA DE PROFESORES 1 6.525 3.125 20.39
ALEROS 1 1.5 7.875 11.81
1 1 7.875 7.88
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
2 7 0.5 7.00
ZONA 2 LABORATORIO
ALMACEN 1 3.125 1.625 5.08
CONTROL DE ARCHIVOS 1 3.125 1.625 5.08
LABORATORIO DE COMPUTO 1 6.5 8 52.00
ALEROS 1 1.5 24.5 36.75
1 1 24.5 24.50
2 7 0.5 7.00
ZONA 3 SS.HH.
ALEROS 1 1.5 8 12.00
1 1 8 8.00
2 7.375 0.5 7.38
CIELORASO GYPLAC RH
ZONA 3 SS.HH. 1 3.125 1.7 5.31
2 1.487 1.7 5.06
2 4.925 3.125 30.78
CIELORASO GYPLAC RF
LABORATORIO DE FISICA Y QUIMICA 1 2.875 6.5 18.69
22.01.06 PINTURA EN MUROS EXTERIORES E INTERIORES 657.54 M2
DE CABEZA
ZONA 1 ADMINISTRACION
EJE 1 Y 3 8 2.975 2.7 64.26
8 2.98 0.83 19.79
EJE 2 2 1.725 2.7 9.32
EJE A Y C 4 0.8 2.7 8.64
EJE B 2 5.025 2.7 27.14
ZONA 2 LABORATORIOS
EJE 4 Y 12 8 3.125 2.7 67.50
8 3.125 0.806 20.15
EJE 7 4 3.125 2.7 33.75
EJE 11 4 2.075 2.7 22.41
ZONA 3 SS.HH.
EJE 13 Y 15 4 0.9 2.7 9.72
8 0.25 2.7 5.40
4 0.637 2.7 6.88
4 0.662 2.7 7.15
4 0.225 2.7 2.43
4 1.55 2.7 16.74
16 0.4 2.3 14.72
8 1.55 0.512 6.35
4 2.98 1.052 12.54
EJE 14 2 6.375 2.7 34.43
EJE G 2 2.501 2.7 13.51
2 0.4 2.3 1.84
EJE J 2 2.652 2.7 14.32
4 0.4 2.3 3.68
DE SOGA
ZONA 1 ADMINISTRACION
EJE A 2 2.5 0.85 4.25
EJE C 2 3.475 0.85 5.91
ZONA 2 LABORATORIOS
EJE D 2 10.8 1.95 42.12
EJE F 2 13.7 1.1 30.14
EJE E 2 0.625 2.7 3.38
ZONA 3 SS.HH.
ENTRE EJE 13 Y 14 2 1.8 2.7 9.72
EJE H 2 6.25 2.7 33.75
DIVISORES DE BAÑOS 10 1.5 1.8 27.00
10 0.2 1.8 3.60
2 0.9 1.8 3.24
ZONA 4 CISTERNA Y TANQUE ELEVADO
EN EJE 16 Y 17 4 1.45 2.7 15.66
EJE K Y M 4 2.7 2.7 29.16
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
EN PARAPETO DE LOSA 2 2 11.9 0.75 17.85
DERRAMES
ZONA 1 ADMINISTRACION Y ACCESO
EJEA 1 3.175 0.15 0.48
EJE C 1 4.175 0.15 0.63
ZONA 2 LABORATORIOS
EJE D 1 13.5 0.15 2.03
EJE F 1 16.95 0.15 2.54
ZONA 3 SS. HH.
EJE G 3 0.4 0.25 0.30
EJE J 6 0.4 0.25 0.60
EJE 13 Y 15 24 0.4 0.25 2.40
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 1 1 0.15 0.15
22.01.07 PINTURA EN VIGAS Y COLUMNAS 537.59 M2
ZONA 1 ADMINISTRACION Y ACCESO
COLUMNA C.1 4 1 4.64 18.56
4 0.75 4.64 13.92
COLUMNA C-2 2 2 4.05 16.20
COLUMNA C-3 EN EJE 1 Y 3 2 0.25 5.66 2.83
COLUMNA C-3 EN RESTO 5 0.75 4.05 15.19
COLUMNA C-10 3 1.257 4.5 16.96
COLUMNETA CA-1 9 0.3 1.55 4.19
ZONA 2 LABORATORIOS
COLUMNA C-4 EN EJE 4 Y 12 4 1.45 4.64 26.91
COLUMNA C-4 EN RESTO 2 1.7 4.05 13.77
2 1.45 4.05 11.75
COLUMNA C-5 10 2.55 4.05 103.27
COLUMNA C-3 EN EJE 4 Y 12 1 0.5 5.66 2.83
1 0.35 5.66 1.98
COLUMNA C-3 EN RESTO 2 0.75 4.05 6.07
1 0.35 4.05 1.42
1 0.5 4.05 2.03
COLUMNETA CA-2 16 0.45 2.65 19.08
COLUMNETA CA-3 19 0.45 1.85 15.82
ZONA 3 SS.HH.
COLUMNA C-6 EN EJE 13 Y 15 2 0.35 5.17 3.62
1 0.5 5.17 2.59
1 0.35 5.17 1.81
COLUMNA C-6 EN RESTO 3 0.75 4.05 9.11
1 0.25 4.05 1.01
2 0.5 4.05 4.05
1 0.2 4.05 0.81
COLUMNA C-7 3 1.35 4.64 18.79
1 1.1 4.64 5.10
EN ZONA 4 CISTERNA Y TANQUE ELEVADO
COLUMNA C-8 2 0.8 7.9 12.64
COLUMNA C-9 2 1.3 7.9 20.54
2 1.45 7.9 22.91
COLUMNETA CA-4 1 0.45 1.55 0.70
COLUMNETAS EN PARAPETO
LOSA 2 16 0.15 0.9 2.16
VIGAS
ZONA 1 ADMINISTRACION Y ACCESO PRINCIPAL
EJE 1 Y 3 8 2.85 0.3 6.84
4 6.2 0.3 7.44
EJE 2 2 1.73 0.3 1.04
1 1 0.85 0.85
EJE A Y C 4 0.8 0.3 0.96
2 1.92 0.85 3.26
2 2.25 0.85 3.82
EJE B 2 3.5 0.3 2.10
2 1.52 0.3 0.91
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
1 1 0.85 0.85
VIGUETAS SOLERAS
EN EJE A 2 2.5 0.15 0.75
EN EJE C 2 3.325 0.15 1.00
ZONA 2 LABORATORIOS
EJE 4 Y 12 8 3.13 0.3 7.51
4 6.5 0.3 7.80
EJE 7 4 3.125 0.3 3.75
EJE 11 4 2.08 0.3 2.50
2 0.8 0.85 1.36
EJE D 2 17.98 0.85 30.57
EJE E 2 1.625 0.3 0.98
VIGUETAS SOLERAS
EJE D 2 11.8 0.15 3.54
EJE F 2 13.7 0.15 4.11
ZONA 3 SS.HH.
EJE 13 Y 15 4 6.08 0.3 7.30
4 6.71 0.3 8.05
EJE 14 2 6.375 0.3 3.82
EJE G 2 3.51 0.3 2.11
1 3.2 0.85 2.72
EJE H 2 6.25 0.3 3.75
EJE J 2 2.64 0.3 1.58
1 2.8 0.85 2.38
ENTRE EJE 13 Y 14 2 1.8 0.3 1.08
ZONA 4 CISTERNA Y TANQUE ELEVADO
EN EJE 16 Y 17 LOSA 1 4 1.45 0.3 1.74
2 1 0.85 1.70
EN EJE K Y M LOSA 1 4 2.7 0.3 3.24
EN EJE 16 Y 17 LOSA 2 4 1.45 0.3 1.74
2 1 0.85 1.70
EN EJE K Y M LOSA 2 4 2.7 0.3 3.24
VIGUETAS SOLERAS
EJE 16 2 0.65 0.15 0.20
EN PARAPETO 2 2.3 0.15 0.69
22.01.08 PINTURA ANTICORROSIVO Y ESMALTE DOS MANOS 97.78 M
EN ZONA 2 LABORATORIO 4 1.7 6.80
12 0.9 10.80
EN ZONA 4 CISTERNA 2 1 2.00
4 0.9 3.60
EN GRADAS ENTRE ZONA 4 Y ZONA 6 1 2.9 2.90
3 0.9 2.70
EN RAMPA ENTRE ZONA 4 Y ZONA 6 1 21.48 21.48
21 0.9 18.90
1 15.1 15.10
15 0.9 13.50
22.01.09 PINTURA DOS MANOS EN CONTRAZOCALO CON ESMALTE 35.28 M2
ZONA 1 ADMINISTRACION ACCESO PRINCIPAL
EJE 1 Y 3 2 7.00 0.3 4.20
EJE A 1 6.025 0.3 1.81
EJE C 1 7.025 0.3 2.11
ZONA 2 LABORATORIOS
EJE 4 Y 12 2 7.00 0.3 4.20
EJE D 1 19.9 0.3 5.97
EJE F 1 23.5 0.3 7.05
ZONA 3 SS.HH.
EJE 13 Y 15 2 7.375 0.3 4.43
EJE G 1 4.2 0.3 1.26
EJE J 1 5.00 0.3 1.50
ZONA 4 CISTERNA Y TANQUE ELEVADO
EJE 16 Y 17 2 2.1 0.3 1.26
EJE K Y M 2 2.5 0.3 1.50
ARQUITECTURA
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBADEPARTAMENTO: HVCA
22.01.12 PINTURA EN TRAFICO DE CAMPO DE FUTBITO 1 101.8 101.80 101.80 M
22.01.13 PINTURA EN TRAFICO DE CAMPO DE BASQUET 1 42.11 42.11 42.11 M
22.01.14 PINTURA EN TRAFICO DE CAMPO DE VOLEY 1 72 72.00 72.00 M
22.01.15 PINTURA EN TABLERO DE BASQUET Y ARCOS 2 2.00 2.00 GLB
24.00.00 APARATOS SANITARIOS Y ACCESORIOS
24.01.01 INODORO TANQUE BAJO 8 8.00 8.00 PZA
24.01.04 LAVATORIO DE 20" x 16" 3 3.00 3.00 PZA
24.02.08 LAVATORIO TIPO OVALIN 6 6.00 6.00 PZA
24.02.11 URINARIO PICO BLANCO 1 1.00 1.00 PZA
24.02.12 URINARIOS CORRIDOS ENCHAPADOS 1 1.00 1.00 UND
24.04.06 PAPELERA DE LOSA COLOR 8 8.00 8.00 PZA
24.09.01 COLOCACION DE APARATOS SANITARIOS 18 18.00 18.00 PZA
24.09.02 COLOCACION DE ACCCESORIOS SANITARIOS 18 18.00 18.00 PZA
24.10.00 PLACA RECORDATORIA
24.10.01 PLACA RECORDATORIA 1 1.00 1.00 UND
24.11.00 LIMPIEZA FINAL DE LA OBRA
24.11.01 LIMPIEZA FINAL DE LA OBRA 1 1.00 1.00 GLB
METRADOINSTALACIONES SANITARIAS
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
25.00.00 SISTEMA DE DESAGUE
25.02.00 SALIDA DE DESAGUE
25.02.01 SALIDA DE DESAGUE PVC SAL 2" 27 27 27.00 PTO
25.02.02 SALIDA DE DESAGUE PVC SAL 4" 8 8 8.00 PTO
25.02.04 SALIDA DE VENTILACION DE PVC 2" 9 9 9.00 PTO
25.03.00 REDES DE DISTRIBUCION
25.03.04 TUBERIA PVC 2" 84.36 M
ZONA 2 LABORATORIOS 1 22.71 22.71
ZONA 3 SS.HH. 1 45.00 45
ZONA 6 PABELLON 1 1 16.65 16.65
25.03.06 TUBERIA PVC 4" 24.46 M
ZONA 3 SS.HH. 1 24.46 24.46
25.04.00 REDES COLECTORAS
25.04.01 EXCAVACION MANUAL EN MATERIAL SUELTO H=1.00 M 17.15 M3
ZONA 2 LABORATORIOS 1 13.82 0.6 0.6 4.98
ZONA 3 SS.HH. 1 6.38 0.6 0.6 2.30
ZONA 6 PABELLON 1 1 27.43 0.6 0.6 9.87
25.04.02 RELLENO CON MATERIAL PROPIO MANUAL 17.15 M3
ZONA 2 LABORATORIOS 1 13.82 0.6 0.6 4.98
ZONA 3 SS.HH. 1 6.38 0.6 0.6 2.30
ZONA 6 PABELLON 1 1 27.43 0.6 0.6 9.87
25.04.03 TUBERIAS DE PVC S-25 D=110 mm UF NTP ISO 4435 x 6m 58.23 M
ZONA 1 ADMINISTRACION 1 5.00 5.00
ZONA 2 LABORATORIOS 1 17.32 17.32
ZONA 3 SS.HH. 1 8.48 8.48
ZONA 6 PABELLON 1 1 27.43 27.43
25.05.00 ACCESORIOS DE REDES
25.05.01 CODO PVC SAL 2" x 45° 13.00 PZA
ZONA 2 LABORATORIOS 4 4.00
ZONA 3 SS.HH. 9 9.00
25.05.02 CODO PVC SAL 2" x 90° 45.00 PZA
ZONA 2 LABORATORIOS 10 10.00
ZONA 3 SS.HH. 27 27.00
ZONA 6 PABELLON 1 8 8.00
25.05.03 CODO PVC SAL 4" x 45° 7.00 PZA
ZONA 3 SS.HH. 7 7.00
25.05.04 CODO PVC SAL 4" x 90° 8.00 PZA
ZONA 3 SS.HH. 8 8.00
25.05.17 YEE PVC SAL DE 2" 6.00 PZA
ZONA 2 LABORATORIOS 4 4.00
ZONA 3 SS.HH. 2 2.00
25.05.18 YEE PVC SAL DE 4" 8.00 PZA
ZONA 3 SS.HH. 8 8.00
25.05.19 YEE PVC SAL DE 4" a 2" 11.00 PZA
ZONA 3 SS.HH. 11 11.00
25.06.00 ADITIVOS VARIOS
25.06.01 SUMIDERO DE BRONCE DE 2" 16.00 PZA
ZONA 2 LABORATORIOS 4 4.00
ZONA 3 SS.HH. 12 12.00
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
INSTALACIONES SANITARIAS
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
25.06.09 REGISTRO DE BRONCE ROSCADO DE PISO DE 2" 6.00 PZA
ZONA 2 LABORATORIOS 3 3.00
ZONA 3 SS.HH. 3 3.00
25.06.11 REGISTRO DE BRONCE ROSCADO DE PISO DE 4" 10.00 PZA
ZONA 3 SS.HH. 10 10.00
25.06.15 SOMBRERO DE VENTILACIÓN DE 2" PVC 2.00 PZA
ZONA 3 SS.HH. 2 2.00
25.06.16 CACHIMBA PVC D=110 A 200 mm 3.00 JGO
3 3.00
25.06.17 TRAMPA "P" PVC D= 2" 9.00 UND
ZONA 2 LABORATORIOS 4 4.00
ZONA 3 SS.HH. 5 5.00
25.07.00 CAJA DE INSPECCION
25.07.05 CAJA DE REG. ALB. 12" x 24" TAPA F°F° 7.00 UND
ZONA 2 LABORATORIOS 1 1.00
ZONA 3 SS.HH. 2 2.00
ZONA 6 PABELLON 1 4 4.00
26.00.00 SISTEMA DE AGUA FRIA Y CONTRA INCENDIOS
26.01.00 SALIDA DE AGUA FRIA
26.01.01 SALIDA DE AGUA FRIA EN PVC INC.TUBERIAS Y ACCESORIOS 29.00 PTO
ZONA 2 LABORATORIOS 6 6.00
ZONA 3 SS.HH. 19 19.00
ZONA 6 PABELLON 1 4 4.00
26.02.00 REDE DE DISTRIBUCION
26.02.11 TUBERIA PVC CLASE 10 P/AGUA FRIA 1/2" 104.64 M
ZONA 2 LABORATORIOS 1 37.57 37.57
ZONA 3 SS.HH. 1 53.62 53.62
ZONA 6 PABELLON 1 1 13.45 13.45
26.02.12 TUBERIA PVC CLASE 10 P/AGUA FRIA 3/4" 87.06 M
RED DE DISTRIBUCION GENERAL 1 79.31 79.31
ZONA 4 CISTERNA Y TANQUE ELVADO 1 7.75 7.75
26.02.13 TUBERIA PVC CLASE 10 P/AGUA FRIA 1 1/2" 22.60 M
EN RED DE ADUCCION 1 22.6 22.60
26.02.14 TUBERIA PVC CLASE 10 P/AGUA FRIA 1" 12.25 M
ZONA 4 CISTERNA Y TANQUE ELVADO
TUBERIA DE IMPULSION 1 12.25 12.25
26.02.15 TUBERIA F°G° DE 1 1/2" 7.80 M
ZONA 4 CISTERNA Y TANQUE ELVADO
TUBERIA DE SUCCION 1 7.8 7.80
26.04.00 ACCESORIOS DE REDES
26.04.57 CODO 1/2" PVC C-10 PARA AGUA 100.00 UND
ZONA 2 LABORATORIOS 24 24.00
ZONA 3 SS.HH. 65 65.00
ZONA 6 PABELLON 1 11 11.00
26.04.58 CODO 3/4" PVC C-10 PARA AGUA 12.00 UND
EN LINEA DE DISTRIBUCIÓN GENERAL 8 8.00
ZONA 4 CISTERNA Y TANQUE ELVADO 4 4.00
26.04.59 CODO 1" PVC C-10 PARA AGUA 7.00 UND
ZONA 4 CISTERNA Y TANQUE ELVADO
INSTALACIONES SANITARIAS
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
TUBERIA DE IMPULSION 7 7.00
26.04.60 CODO 1 1/2" PVC C-10 PARA AGUA 2.00 UND
RED DE ADUCCIÓN 2 2.00
26.04.61 CODO 1 1/2" F°G° PARA AGUA 2.00 UND
ZONA 4 CISTERNA Y TANQUE ELVADO
TUBERIA DE SUCCION 2 2.00
26.04.91 TEE 1/2" PVC C-10 PARA AGUA 24.00 UND
ZONA 2 LABORATORIOS 5 5.00
ZONA 3 SS.HH. 17 17.00
ZONA 6 PABELLON 1 2 2.00
26.04.92 TEE 3/4" PVC C-10 PARA AGUA 5.00 UND
EN LINEA DE DISTRIBUCIÓN GENERAL 4 4.00
ZONA 4 CISTERNA Y TANQUE ELVADO 1 1.00
26.04.93 TEE 1" PVC C-10 PARA AGUA 4.00 UND
ZONA 4 CISTERNA Y TANQUE ELVADO
TUBERIA DE IMPULSION 4 4.00
26.04.94 TEE 1 1/2"F°G° PARA AGUA 2.00 UND
ZONA 4 CISTERNA Y TANQUE ELVADO
TUBERIA DE SUCCION 2 2.00
26.05.00 VALVULAS
26.05.01 VALVULA DE COMPUERTA DE BRONCE DE 1/2" 16.00 PZA
ZONA 2 LABORATORIOS 7 7.00
ZONA 3 SS.HH. 7 7.00
ZONA 6 PABELLON 1 2 2.00
26.05.02 VALVULA DE PASE DE BRONCE DE 3/4" 4.00 PZA
EN RED GENERAL 4 4.00
26.05.03 VALVULA DE COMPUERTA DE BRONCE DE 1" 2 2.00 2.00 PZA
26.05.04 VALVULA DE COMPUERTA DE BRONCE DE 1 1/2" 3 3.00 3.00 PZA
26.05.05 VALVULA DE PASE DE 1" 1 1.00 1.00 PZA
26.05.06 VALVULA CHECK DE BRONCE DE 1" 2 2.00 2.00 PZA
26.05.07 VALVULA CHECK DE BRONCE DE 1 1/2" 2 2.00 2.00 PZA
26.05.08 VALVULA DE PIE CON CANASTILLA DE BROCE DE 1 1/2" 2 2.00 2.00 PZA
26.05.09 MANOMETRO DE 10 BARES DE PRESIÓN 2 2.00 2.00 PZA
26.06.02 CAJA DE REGISTRO ALB. 10" x 12" 2 2.00 2.00 UND
26.07.01 EQUIPO DE BOMBEO 2 ELECTROBOMBAS 1 HP 2 2.00 2.00 UND
26.07.02 ABRAZADERA DE FIJACIÓN DE 3/4" 6 6.00 6.00 PZA
26.07.02 ABRAZADERA DE FIJACIÓN DE 1" 11 11.00 11.00 PZA
26.07.04 ACCESORIOS DE CISTERNA 1 1.00 1.00 GLB
26.07.05 TANQUE ELEVADO PREFABRICADO, INCLUYE ACCESORIOS 1 1.00 1.00 GLB
28.00.00 SISTEMA DE DESAGUE PLUVIAL
28.02.00 REDES DE DISTRIBUCION
28.02.07 TUBERIA PVC SAL PESADO 2" 10.00 M
INSTALACIONES SANITARIAS
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
ZONA 4 CISTERNA Y TANQUE ELVADO-REBOSE 1 10.00 10.00
28.02.08 TUBERIA PVC SAL PESADO 3" 77.00 M
ZONA 1 ADMISTRACION 2 5.00 10.00
2 6.00 12.00
ZONA 2 LABORATORIOS 3 5.00 15.00
3 6.00 18.00
ZONA 3 SS.HH. 2 11.00 22.00
28.02.09 TUBERIA PVC SAL PESADO 4" 6.00 M
ZONA 4 CISTERNA Y TANQUE ELVADO-REBOSE 1 6.00 6.00
28.04.00 ACCESORIOS DE REDES
28.04.62 CODO PVC SAL PESADO 2" x 45° 1 1.00 1.00 PZA
28.04.63 CODO PVC SAL PESADO 2" x 90° 4 4.00 4.00 PZA
28.04.64 CODO PVC SAL PESADO 3" x 90° 42.00 PZA
ZONA 1 ADMISTRACION 12 12.00
ZONA 2 LABORATORIOS 18 18.00
ZONA 3 SS.HH. 12 12.00
28.04.65 CANALETA METALICA GALVANIZA 81.05 M
ZONA 1 ADMISTRACION 1 16.05 16.05
ZONA 2 LABORATORIOS 1 49 49.00
ZONA 3 SS.HH. 1 16 16.00
METRADOINSTALACIONES ELECTRICAS
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
29.02.00 SALIDA DE TECHO
29.02.01 SALIDA PARA TECHO CENTRO DE LUZ 89.00 PTO
ZONA 1 ADMINISTRACION Y ACCESO 6 6
ZONA 2 LABORATORIOS 33 33
ZONA 3 SS.HH. 12 12
ZONA 4 CISTERNA Y TANQUE ELEVADO 2 2
ZONA 6 TALLERES 24 24
ZONA 7 AUDITORIO 12 12
29.03.04 SALIDA PARA INTERRUPTOR SIMPLE 9.00 PTO
ZONA 1 ADMINISTRACION Y ACCESO 3 3
ZONA 2 LABORATORIOS 2 2
ZONA 3 SS.HH. 4 4
29.03.05 SALIDA PAR INTERRUPTOR DOBLE 17.00 PTO
ZONA 1 ADMINISTRACION Y ACCESO 2 2
ZONA 2 LABORATORIOS 3 3
ZONA 3 SS.HH. 3 3
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 1
ZONA 6 TALLERES 5 5
ZONA 7 AUDITORIO 3 3
29.04.01 SALIDA PARA SPOT LIGHT 24.00 PTO
ZONA 1 ADMINISTRACION Y ACCESO 2 2
ZONA 2 LABORATORIOS 7 7
ZONA 3 SS.HH. 4 4
ZONA 6 TALLERES 7 7
ZONA 7 AUDITORIO 4 4
29.04.02 SALIDA PARA BRAQUET PTO
ZONA 1 ADMINISTRACION Y ACCESO 3 3
29.07.00 SALIDA PARA TOMACORRIENTE
29.07.14 SALIDA P/TOMACORRIENTE BIPOLAR DOBLE TUB. SAP CABLE TW 14 CAJA PESADA 66.00 PTO
ZONA 1 ADMINISTRACION Y ACCESO 7 7
ZONA 2 LABORATORIOS 32 32
ZONA 3 SS.HH. 3 3
ZONA 6 TALLERES 17 17
ZONA 7 AUDITORIO 7 7
31.00.00 TUBERIAS CONDUCTORES Y CABLES
31.01.02 TUBERIA PVC SAP (ELECTRICA) D= 20mm 648.70 M
ZONA 1 ADMINISTRACION Y ACCESO 1 72.70 72.70
ZONA 2 LABORATORIOS 1 168.38 168.38
ZONA 3 SS.HH. 1 56.40 56.40
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 9.50 9.50
ZONA 6 TALLERES 1 251.76 251.76
ZONA 7 AUDITORIO 1 89.96 89.96
31.01.03 TUBERIA PVC SAP (ELECTRICA) D= 25mm 37.16 M
ZONA 1 ADMINISTRACION Y ACCESO 1 6.30 6.30
ZONA 2 LABORATORIOS 1 6.30 6.30
ZONA 3 SS.HH. 1 12.80 12.80
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 5.46 5.46
ZONA 7 AUDITORIO 1 6.30 6.30
31.01.04 TUBERIA PVC SAP (ELECTRICA) D= 40 mm 3.36 M
ZONA 6 TALLERES 1 3.36 3.36
31.01.05 TUBERIA PVC SAP (ELECTRICA) D= 50mm 85.07 M
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
INSTALACIONES ELECTRICAS
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
EN RED GENERAL 1 85.07 85.07
32.00.00 CABLES
32.01.01 CONDUCTOR ELECTRICO CU TW 2.5 mm2 939.02 M
ZONA 1 ADMINISTRACION Y ACCESO 1 118.28 118.28
ZONA 2 LABORATORIOS 1 246.31 246.31
ZONA 3 SS.HH. 1 104.1 104.1
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 4.4 4.4
ZONA 6 TALLERES 1 328.03 328.03
ZONA 7 AUDITORIO 1 137.9 137.9
32.01.02 CONDUCTOR ELECTRICO CU TW 4 mm2 365.76 M
ZONA 1 ADMINISTRACION Y ACCESO 1 42.5 42.5
ZONA 2 LABORATORIOS 1 114.74 114.74
ZONA 3 SS.HH. 1 16.36 16.36
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 4.4 4.4
ZONA 6 TALLERES 1 133.76 133.76
ZONA 7 AUDITORIO 1 54 54
32.01.03 CONDUCTOR ELECTRICO CU TW 10 mm2 67.02 M
ZONA 6 TALLERES 1 67.02 67.02
32.01.04 CONDUCTOR ELECTRICO CU TW 35 mm2 64.60 M
ZONA 6 TALLERES 1 64.6 64.6
32.01.05 CONDUCTOR ELECTRICO DE 10 mm2 NYY 75.36 M
ZONA 1 ADMINISTRACION Y ACCESO 1 12.6 12.6
ZONA 3 SS.HH. 1 25.6 25.6
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 24.56 24.56
ZONA 7 AUDITORIO 1 12.6 12.6
32.01.06 CONDUCTOR ELECTRICO DE 16 mm2 NYY 12.60 M
ZONA 2 LABORATORIOS 1 12.6 12.6
32.01.08 CONDUCTOR ELECTRICO DE 150 mm2 NYY 171.44 M
RED GENERAL 1 171.44 171.44
32.01.09 CONDUCTOR ELECTRICO DE 10 mm2 Cu DESNUDO 228.30 M
ZONA 1 ADMINISTRACION Y ACCESO 1 26.93 26.93
ZONA 2 LABORATORIOS 1 59.72 59.72
ZONA 3 SS.HH. 1 23.45 23.45
ZONA 4 CISTERNA Y TANQUE ELEVADO 1 17.81 17.81
ZONA 6 TALLERES 1 100.39 100.39
32.01.10 CONDUCTOR ELECTRICO DE 35 mm2 Cu DESNUDO 123.37 M
ZONA 6 TALLERES 1 35.65 35.65
EN RED GENERAL 1 87.72 87.72
32.01.11 CABLEDO Y ESTRUCTURADO CENTRO DE COMPUTO 1 1 1.00 GLB
33.02.00 TABLERO PARA DISTRIBUCION PARA CORRIENTE ALT.
33.02.11 TABLERO GENERAL GABINETE METALICO CON 8 POLOS 1 1 1.00 PZA
33.02.12 TABLERO DISTRIBUCIÓN CAJA METALICO CON 8 POLOS 2 2 2.00 PZA
33.02.13 TABLERO DISTRIBUCIÓN CAJA METALICO CON 12 POLOS 3 3 3.00 PZA
33.02.14 TABLERO DISTRIBUCIÓN CAJA METALICO CON 24 POLOS 1 1 1.00 PZA
36.00.00 ARTEFACTOS ELECTRICO
36.01.01 FLUORESCENTE RECTO ISPE 2 x 40 W INCLUYE EQUIPO Y PANTALLA 71.00 UND
ZONA 1 ADMINISTRACION Y ACCESO 3 3
ZONA 2 LABORATORIOS 30 30
ZONA 4 CISTERNA Y TANQUE ELEVADO 2 2
INSTALACIONES ELECTRICAS
ITEM PARTIDA CANT. LARGO ANCHO ALTO PARCIAL TOTAL UND
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE LA I.E. CESAR VALLEJO MENDOZA DEL C.P. DE PUMARANRA DISTRITO DE PAUCARA-ACOBAMBA-HUANCAVELICA
UBICACIÓN: C.P. DE PUMARANRA DISTRITO: PAUCARA PROVINCIA: ACOBAMBA DEPARTAMENTO: HUANCAVELICA
ZONA 6 TALLERES 24 24
ZONA 7 AUDITORIO 12 12
36.01.02 FLUORESCENTE CIRCULAR ISPE 1 x 32 W INCLUYE EQUIPO Y PANTALLA 18.00 UND
ZONA 1 ADMINISTRACION Y ACCESO 3 3
ZONA 2 LABORATORIOS 3 3
ZONA 3 SS.HH. 12 12
36.01.03 SPOT LIGHT DE 20 W AHORRADOR CON PANTALLA CIRCULAR 24.00 UND
ZONA 1 ADMINISTRACION Y ACCESO 2 2
ZONA 2 LABORATORIOS 7 7
ZONA 3 SS.HH. 4 4
ZONA 6 TALLERES 7 7
ZONA 7 AUDITORIO 4 4
36.01.04 BRAQUET TIPO BOLA D=40 cm 40 W-COMPLETO 3.00 UND
ZONA 1 ADMINISTRACION Y ACCESO 3 3
38.00.00 POZO A TIERRA
38.01.01 POZO A TIERRA 8 8 8.00 GLB
38.02.01 SALIDA PARA BOMBA ELECTRICA 2 2 2.00 PTO
38.02.02 TABLERO AUTOMATICO DE 30°, 20° Y 15 A 1 1 1.00 UND
38.02.03 BOMBA DE IMPULSION 2 2 2.00 UND
38.02.04 PARARRAYO IONIZANTE S6-60 1 1 1.00 GLB