Essar Power Hazira
Essar Energy Site Visit
8th Dec 2011
T.S. Bhatt
Head Essar Power Hazira
Operating Plants - Overview
Capacity: 515 MW
Fuel: Natural gas/Naphtha
Offtake: Gujarat Electricity Board, Essar
Steel
COD: Oct 1997
Location: Gujarat, India
Hazira I Bhander
Capacity: 500 MW
Fuel: Natural gas
Offtake: Essar Group companies
COD: Jan 2006 Oct 2008
Location: Gujarat, India
Algoma
Capacity: 85 MW
Fuel: Blast furnace gas / Coke oven gas
Offtake: Ontario Power Authority
COD: Jun 2009
Location: Ontario, Canada
Vadinar
Capacity: 120 MW
Fuel: Refinery residue
Offtake: Essar Oil
COD: May 2008
Location: Gujarat, India
Vadinar P1
Capacity: 380 MW
Fuel: Natural Gas
Offtake: Essar Oil
Sync: Unit I Oct 2010
Unit II Jan 2011
Location: Gujarat, India
Our Plants at Hazira, Commissioning Dates
Capacity: 515 MW Fuel: Natural gas/Naphtha Off take: Gujarat Electricity Board, Essar Steel COD: Oct 1997 Location: Gujarat, India
Capacity: 500 MW Fuel: Natural gas Off take: Essar Group companies COD: Jan 2006 Oct 2008 Location: Gujarat, India
Salient Features
Plant Configuration
EPOL- 515 MW
3 Gas Turbines Generators-3 X 110 MW
1 Steam Turbine Generator-1 X 185 MW
BPOL - 500 MW
3 Gas Turbines 1x100+2x110 MW = 320 MW
Steam Turbine - I 55 MW = 55 MW
Steam Turbine- II 125 MW = 125 MW
Fuel
NGL/ Naphtha / HSD / Natural Gas
COMBINED CYCLE PROCESS
Air
Gas
Turbine Compressor
Fuel
Combustion
System
Exhaust
Alternator
Boiler
Steam
Turbine Alternator
Condenser
Cooling Water
Boiler Feed
Pump
Condensate
Extraction Pump
Deareator To other
Boilers
From Other
Boilers
COMBINED CYCLE PROCESS (BPL)
270 MW Power Project ( Hazira 2 )
Essar Power Hazira Ltd
CONFIGURATION :
Steam Turbines : 2 X 135 MW
Boilers : 2 X 487 TPH (Multi-Fuel Fired )
Steam parameters :141bar(a) , 540degC
Reheater Parameters: 35.1bar(a), 540degC
FUEL :
Various combinations of following fuels can be fired :
Corex Coal, Corex Coal Fines, Corex Coal Dust, Corex Gas,
Coke Oven Gas & Thermal Coal
HIGHLIGHTS :
Generator (Unit 1) Inspection done on 12-Jul-2011
Steam Turbine testing HP turbine on 30- Nov-2011
LP turbine by End of Dec-2011
Boiler Drum (Unit 1) expected at site by Dec 2011
MULTI-FUEL FIRED POWER PLANT ( HAZIRA 2 )
270 MW PLOT PLAN ( HAZIRA 2 )
MAIN EQUIPMENT SUPPLIERS 270 MW
PACKAGE VENDOR
STG & Auxiliaries SIEMENS
Boiler & Auxiliaries BWE
IDCT SPIG
CW Pump Jyoti
Safety Relief Valves Tyco Sanmar
EBOP ABB
Generator Transfomers ABB
Gas Insulated Switchyard ABB
Emergency DG Set GMMCO
Plant DCS Honeywell
Fuel Oil Handling System Thermosystems
Ash Handling System Mcawber Beekay
ENGINEERING PROGRESS - 85%
DESCRIPTION PROGRESS
BASIC ENGINEERING 100%
TECHNICAL SPECIFICATION 95%
ENGINEERING EESL 70%
ENGINEERING VENDORS 90%
S.N. DESCRIPTION UNIT TOTAL SCOPE COMPLETED % COMPLETION
1 Piling Nos 4400 3270 77
2 Concreting Cum 45140 9438 21
3 Structural Fabrication MT 8262 3813 46
4 Structural Erection MT 12035 804 6.5
5 Equipment Erection MT 16244
6 Piping IM 190952
7 Cable Laying RM 315000
OVERALL CONSTRUCTION PROGRESS
2 x487 TPH Multifuel Fired Boilers from M/s BWE
Elevation Plan for Boiler
2 nos STEAM TURBINES 2X135MW FROM SIEMENS
PROJECT SITE RIGS MOBILIZATION FOR PILING
CHIMNEY
AREA
BOILER-1 BOILER-2
TG
BUILDING
ESP- 2 AREA
ESP- 1 AREA
BOILER -1 & TG BUILDING ERECTION UNDER PROGRESS
BOILER-1 STRUCTURE
TG BUILDING STRUCTURE
TG-1
DECK TG-2
DECK
CHIMNEY
STG DECK 1& 2 UNDER CONSTRUCTION
STG DECK 1 STG DECK 2
CURRENT
STATUS
CURRENT
STATUS
TG DECK & BUILDING VARIOUS STAGES OF CONSTRUCTION
TG BLDG FOUNDATIONS PILING EXCAVATION TG DECK REINFORCEMENT
TG DECK CONCRETING TG DECK RAFT COMPLETED TG DECK COLUMNS
BOILER FOUNDATIONS AND ERECTION UNDER PROGRESS
BOILER -1FOUNDATIONS
BOILER -2FOUNDATIONS
COAL MILL AND PA
FOUNDATIONS COMPLETED
ESP-1 FOUNDATIONS UNDER PROGRESS
CURRENT
STATUS
ESP-1 FOUNDATIONS AND
RAFT UNDER PROGRESS
PILING EXCAVATION
ESP-2 FOUNDATIONS UNDER PROGRESS
CURRENT
STATUS
ESP-2 FOUNDATIONS AND
RAFT UNDER PROGRESS
PILING EXCAVATION
CHIMNEY RAFT CASTING AND REINFORCEMENT
CURRENT
STATUS
ONE QUADRANT OF
CHIMNEY RAFT CASTING
COMPLETED
REINFORCEMENT FOR
REST OF RAFT UNDER
PROGRESS
PILING EXCAVATION & PCC
REINFORCEMENT
COOLING TOWER - PCC & BASIN CONCRETING UNDER
PROGRESS
PILING PCC WORK
BASIN FOUNDATION
UNDER PROGRESS
BASIN FOUNDATION
UNDER PROGRESS
CURRENT
STATUS CURRENT
STATUS
TG BUILDING STRUCTURE UNDER FABRICATION
AT VARIOUS YARDS
FABRICATION OF COAL BUNKER UNDER PROGRESS
PRESSURE PARTS AND FABRICATED STRUCTURES
Plant Performance
Operating Units
Essar Power and Bhander Power
Year Generation
(MU)
Average
MW
Export to
ESTL
(MU)
Export to
GUVNL
(MU)
PLF (%)
2006-07 4714 538 2852.2 1779.0 74.1%
2007-08 5394 616 3357.1 1946.3 76.8%
2008-09 4858 555 2979.7 1782.3 59.2%
2009-10 5086 581 3192.1 1796.8 57.2%
2010 - 11 5364 612 3778.0 1493.1 60.3%
Generation at Hazira
3188
2821
2084 1968
2975
2516
3643
4228
4714
5394
4858 5086
5364
0
1000
2000
3000
4000
5000
6000
1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
Gen
era
tio
n (
MU
)
Generation MU
95.6%
97.0%
93.5%
96.9% 97.1%
94.6%
98.1%
96.9%
97.1%
94.2%
96.7%
97.2%
98.3% 97.9% 98.5%
93.5%
98.9%
99.8%
98.5%
99.6%
97.3%
99.7% 99.9% 99.9%
99.0%
99.9%
86.0%
88.0%
90.0%
92.0%
94.0%
96.0%
98.0%
100.0%
1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
Availability % Reliability (%)
Availability and Reliability
Plant Performance
0.0%
0.3%
0.6%
0.9%
1.2%
1.5%
1.8%
2.1%
2.4%
2.7%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
1998-99 1999-00 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11
Au
x C
on
su
mp
tio
n (
%)
PL
F (
%)
PLF % Aux Cons %
Highlights
Essar Power 515 MW:
Received Integrated Management Systems, PAS:99
OHSAS 18001:2007 and ISO14001 in January 2009.
Green Tech Safety Award, 2010 in Gold Category
Green Tech Environment Award 2010 in Silver Category
Accident free Days : 3462 Days ( Data up to Nov 2011)
Bhander Power Limited :
Received OHSAS:18001 certification in February 2009.
Green Tech Safety Award, 2010 in Silver Category
Green Tech Environment Award 2010 in Silver Category
CII award for Water Efficient Power company 2011
Accident Free Days : 2492 Days ( Data up to Nov 2011)
Highlights
Shreshtha Suraksha Puraskar for EPOL in 2001 from National Safety Council of India
Major Overhaul and Other Scheduled Inspections of Gas Turbines and Steam
Turbines carried out In house at Essar Power Limited and Bhander Power Limited
Multi fuel Capability with Gas and Naphtha fuels that can be used
independently, as well as in Mixed mode. Leads to flexibility in case of fuel
pricing variations, and ensures cost benefit to customer
Energy Conservation at EPOL.
Increase of 3- 4 MW STG Output after replacing Plugs and
seat lapping of HP Bypass control valves and providing
isolations.
STG bearing cooling requirement complied through additional
cooler . Increased Cooling resulted into stoppage of One ACW
Pump(55 KW ) and one ACW Booster Pump ( 31 KWH)
Instrument air system modified to reduce aux power (saving of
75 kW) and to improve compressor life.
Clarified water pump impeller trimmed to reduce power
consumption. Net power saving would be 20 KWH
Raw water Pump replaced by VFD Motor. Saving potential of
35 KWH.
Installation of Wind Spin Fans, in place of Roof Ventilator in
all Roofs. Wind Spin
Bypass Control
Valves
Improvements in O&M Design.
New Installations :
GTG Inlet Air Cooling System.
STG IDCT fills height Increase from 3 to 5 . Expected
STG output gain would be 2.5 MW.
Provision to receive fuel gas supply from three different
gas supplier .
GTG lube oil filtration and dehydration machine
installed.
Flux detectors installed on STG generator.
Plant Efficiency Improvements
STG Output increased by 2 MW by minimising the
hot flue gas leakages in HRSGs.
Honey Comb seals and Cutter teeth buckets
installed in Gas turbine for Efficiency improvements.
Periodical replacement of Gas turbine inlet air filters
to minimise loss due to high filter Dp.
Monthly Monitoring of Bypass stack Flue gas
losses.
Plant Aux. Consumption considerably reduced due
to running of Single HPBFP during 2 GT operation.
Hydro jetting of condensor tubes to remove scale &
improve the condensor vacuum.
Reduced Spill over to GUVNL by better Load
coordination with ESTL.
Single HPBFP
during 2 GT
operation
Plant Efficiency Tracking
On- Line Monitoring of Station Performance. Daily Monitoring of Plant
Performance related Parameters.
Daily Monitoring of Equipment Performance.
Daily Monitoring of Consumables and Water Consumption.
Periodical GT , Station , Bypass Stack Measurement and Condenser PG
Tests.
Regular Water wash of GT based on Performance.
Unique Features of Essar Power and Bhander Power
First IPP Post Liberalization
Best Safety Practices- Sword of Honor/OHSAS 18001
Most Environment Friendly with CDM
Unique Islanding Systems for Grid Support
Multi fuel with online change over systems
In-house O&M
Lowest Man MW Ratio
High availability and PLF among Similar plants Globally
Energy Efficient with low Aux consumption and low Heat Rate
High level of Plant and Business process automation
Maintenance Standards
Maintaining high availability of major equipments Viz. Gas Turbines, Steam turbine and HRSGs
Over 300 modifications carried out to improve various systems performance
In house capability to carry out major inspections of gas turbines and steam turbines
Various modifications done on turbine parts to extend the parts life
High reliability of Liquid Fuel System by improvements on the Flow divider , Warren Pump seal design, Liquid fuel lines, etc
Commissioning of inlet air cooling system carried out with in house expertise
In House Expertise for inspections
Major inspection of GTG# 3 carried out in 21 days
Major Inspection of steam turbine carried out in 22 days simultaneous with
Gas Turbine Major Inspection
Developed card repair facility for Mark V and DCS electronic cards.
In house repair of expensive equipments like Warren pump, Flow divider,
Dual fuel nozzles, Hydraulic pump, CW Pump
Relay testing facility developed for testing and calibration of relays
Health, Safety and Environment
Essar Power Hazira
SAFETY MEASURES
Hydrogen sensors in Battery Room.
Naphtha Detectors in Gas Turbine Compt.
Monsoon preparedness improved.
Behaviour Based Safety on Stream.
Auto HVWS system at Station Transformers.
OHSAS 18001 Certified
HIGH RISK JOBS
DONE SAFELY
Environmental Management
ESSAR POWER LIMITED received Integrated
Management Systems, PAS:99 Certification for
OHSAS 18001:2007 and ISO14001
Uses clean fuel, natural gas with very low emissions level .
Green belt developed all around the plant with planting of over one lakh trees.
Water systems modified to optimize the water requirements.
Chlorine Dioxide System introduced in Nov 2005 COC improved from 5 to 5.5.
Cooling Water blow down used for Cooling purpose in HBI plant and gardening in township. Treated
effluent water used for horticulture.
Control room - back up alarm system, made paperless.
Environment - Consents & Ambient Air Quality
Consents for Essar Power.
1. Air
2. Water
3. Waste Hazard .
Consents are valid till 24.06.2014
Month SPM (PPM) (500) SO2 (PPM) (120) NOX (PPM) (120)
Sep-07 211 7.9 34.4
Oct-07 143 7.6 32.8
Nov-07 253 7.2 31.1
Dec-07 272 8 32.1
Jan-08 216 8.1 32.7
Water Conservation at EPOL
Water Saving
Condenser cooling 5200 m3/day
Filter Back wash 168 m3/day
Salt Recovery water 90 m3/day
Treated effluent used
for gardening 500 m3/day
Total Saving 5758 m3/day
Savings @ Rs. 25900 / day @Rs. 12/m3
Annual Rs.335 Lakh
Reliability Improvements.
DD 1 & 3 hydraulic system accumulators.
Naphtha settling & Inter tank Filtration Scheme introduced to ensure clean
Naphtha without filterable particles for the gas turbines.
Significant improvements on the reliability of Liquid Fuel System by
improvements on the Flow divider , Warren Pump seal design etc.
Accumulator for GTGs Naphtha forwarding system.
Auto islanding scheme for station with stable load.
New common header for GT ACW IDCT.
GTG Misc MCC- DC supply 110 V DC instead of 110V AC
6.6 KV Station switchgear auto-changeover scheme.
HR Development Practices
12 Engineers sent to G.E, USA for Systems training
Simulator operation training a regular feature
Regular O&M training from leading suppliers
HR Development through in-house and external Management Programs
Job Rotation within functions and lateral transfers for wider exposure
Employees exposed to seminars & workshops related to Power industry
Manpower to MW Ratio
National Standard -Thermal 2.75
Best - Coal based 1.50
Gas Based average 0.43
Essar Power Ltd. 0.11
Awards and Achievements
Essar Power Hazira
Certifications and Accolades
51
Green tech award
Gold and silver award
BSI Management System
ISO14001 & PAS 99
BSI Management System
OHSAS 18001
Gujarat Safety Council
Certificate of Appreciation
Gujarat Safety Council
Certificate of Appreciation
National Safety Council
Shreshtha Surksha Puraskar
BSC - National Safety Award
GSC - Certificate of Appreciation
BSC - Five star rating & Sword of honour
GSC - Certificate of Appreciation
National Safety Council
Yogyata Praman patra
Essar Power 100% operational
DNV - ISRS Level III
1997 1998 1999 2000 2001 2005 2006 2007 2008 2009 2010
BPL receives CII "Most Water Efficient Unit" award November 2011
Greentech Foundation Silver award for Environment Excellence 2011 EPOL & BPL
BSI Management System BPL - ISO14001 & PAS 99
Greentech
Gold and silver award
BSI Management System
EPOL - ISO14001 & PAS 99
BSI Management System
OHSAS 18001
Gujarat Safety Council
Certificate of Appreciation
Gujarat Safety Council
Certificate of Appreciation
National Safety Council
Shreshtha Surksha Puraskar
BSC - National Safety Award
GSC - Certificate of Appreciation
BSC - Five star rating & Sword of honour
GSC - Certificate of Appreciation
National Safety Council
Yogyata Praman patra
Essar Power 100% operational
DNV - ISRS Level III
1997 1998 1999 2000 2001 2005 2006 2007 2008 2009 2010 2011
Safety at EPOL and BPOL
Green Tech Safety Award 2010