1.1
1.1.1
1.1.3
1.2
1.2.1
1.3
1.3.1
1.3.2
1.4
1.4.1
1.5
2.1
2.2
2.1
3.1
3.2
4.1.1.1
4.1.1.2
4.1.2.1
4.1.2.2
4.1.3.1
4.1.3.2
]
5.1
6.2
6.2.3
6.2.5
6.2.7
6.2.9
6.2.11
6.2.13
6.2.15
6.2.17
6.2.18
6.2.19
6.2.19
6.2.3
6.2.11
6.2.11
6.2.15
6.2.17
6.2.18
6.2.19
6.5
6.5
6.6
6.6.1
6.6.5
6.7
6.7.1
6.7.3
8.1
8.2
10.1
10.2
10.4
12.1
12.1.3
12.4
12.4.1
12.6
12.6.2
12.8
12.8.3
13.5.1
13.5.2
13.5.3
13.5.4
13.17.3
13.21
13.21.1
13.21.2
13.21.3
13.22
13.23
13.23
13.24
13.17
13.17.1
2.3
13.17.2.1
13.17.2
13.17.4
13.17.4
13.17.5
6.2.30
6.2.31
6.2.32
6.2.33
6.2.34
6.2.35
6.2.36
6.2.37
6.2.40
9.1.17
10.2.1.3
9.1.17
9.1.2
17
17
1
ANALISIS DE PRECIOS UNITARIOS
PRELIMINARES
Valla Informativa General del Proyecto (GL)
HerramientaDiseño e Instalación
Señal Preventiva, Reglamentaria e Informativa (UD)
HerramientaDiseño e Instalación
ROCERIA Y LIMPIEZA
ROCERIA Y LIMPIEZA (m2)
HerramientaMano de obra
LOCALIZACIÓN Y REPLANTEO
Localización y Replanteo de Redes (m)
Mano de obraHERRAMIENTA MENOR
Localización y Replanteo de sitios de conexiones (incluye topografía y plano récord) (m)
Mano de obraEquipo de topografiaTopografo
CAMPAMENTO E INSTALACIONES PROVISIONALES
Campamento e Instalaciones Provisionales (m2)
Concreto simple 17.2 MPaTeja de zinc cal 33Guadua sobrebasa L=4 v 3.2 mEsterilla A 3 x 0.25 MPuntilla promedioPuerta en maderaSalida toma electrica generalSalida electrica alumbrado incandecente
Mano de obraHerramienta menor Acarreo
Puente Peatonal Provisional en Madera (1.4 m.) (m)
Cuarton sajo 2x 4Tabla fina pisoPuntilla promedioMano de ObraHerramienta menor
CAPITULO 2 - DEMOLICIONES
Demolición de Pavimentos en Concreto Hidráulico (m3)
HerramientaMano de obraCompresor
Demolición de Andenes/Sardineles en Concreto Hidráulico (m3)
HerramientaMano de obra
Demolición/Transporte de escombro m3
HerramientaDemolicion manualTransporte de escombros
CAPITULO 3 - SOBREACARREOS
Evacuación de Escombros/Sobrantes en Vehículo Automotor (m3)
Herramienta
Mano de obraVolqueta
Manejo/Movilización de Materiales en Vehículo-No Automotor
Herramienta
Mano de obra
CAPITULO 4 - EXCAVACIONES
EXCAVACION MATERIAL COMUN 0-2 (m3)
Herramienta
Mano de obra
EXCAVACION MATERIAL COMUN 2-4 (m3)
Herramienta
Mano de obra
EXCAVACION CONGLOMERADO 0-2 (m3)
Herramienta
Mano de obra
EXCAVACION CONGLOMERADO 2-4 (m3)
Herramienta
Mano de obra
EXCAVACION ROCA 0-2 (m3)
Herramienta
Mano de obra
EXCAVACION ROCA 2-4 (m3)
Herramienta
Mano de obra
CAPITULO 5 - APUNTALAMIENTOS Y ENTIBADOS
Entibado Horizontal/ Vertical tipo 1 (m)
Mano de obraGuadua sobrebasaTabla para FormaletaPuntillas 2"
Cuarton para Formaleta
CAPITULO 6 - ALCANTARILLADOS
INSTALACIÓN DE TUBERÍA EN PVC CORRUGADA
Instalacion PVC corrugada 8" (m)
Tuberia PVC corrugada 8"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 10" (m)
Tuberia PVC corrugada 10"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 12" (m)
Tuberia PVC corrugada 12"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 14" (m)
Tuberia PVC corrugada 14"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 16" (m)
Tuberia PVC corrugada 16"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 18" (m)
Tuberia PVC corrugada 18"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 20" (m)
Tuberia PVC corrugada 20"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 24" (m)
Tuberia PVC corrugada 24"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 27" (m)
Tuberia PVC corrugada 27"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC corrugada 30" (m)
Tuberia PVC corrugada 30"Transporte tuberia hasta la brechaMano de obra instalación
Instalacion PVC perfilada 42" (m)
Tuberia PVC perfilada 42"Transporte tuberia hasta la brechaMano de obra instalación
SUMINISTRO E INSTALACIÓN DE TUBERÍA EN PVC CORRUGADA BAJO TIERRA
Tuberia bajo tierra PVC corrugada 8" (m)
localizacion y replanteoTubería PVC corrugada 8"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subase
Puente provisionalCamara de inspeccionReposición pavimento rígido
Tubería PVC corrugada 10"
localizacion y replanteoTubería PVC corrugada 10"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subasePuente provisionalCamara de inspeccionReposición pavimento rígido
Tubería PVC corrugada 12"
localizacion y replanteoTubería PVC corrugada 12"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subasePuente provisionalCamara de inspeccionReposición pavimento rígido
Tubería PVC corrugada 14"
localizacion y replanteoTubería PVC corrugada 14"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subasePuente provisionalCamara de inspeccion
Reposición pavimento rígido
Tuberia bajo tierra PVC corrugada 16" (m)
localizacion y replanteoTubería PVC corrugada 16"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subasePuente provisionalCamara de inspeccionReposición pavimento rígido
Tuberia bajo tierra PVC corrugada 18" (m)
localizacion y replanteoTubería PVC corrugada 18"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subasePuente provisionalCamara de inspeccionReposición pavimento rígido
Tuberia bajo tierra PVC corrugada 20" (m)
localizacion y replanteoTubería PVC corrugada 20"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subase
Puente provisionalCamara de inspeccionReposición pavimento rígido
Tuberia bajo tierra PVC corrugada 24" (m)
localizacion y replanteoTubería PVC corrugada 24"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subasePuente provisionalCamara de inspeccionReposición pavimento rígido
Tuberia bajo tierra PVC corrugada 27" (m)
localizacion y replanteoTubería PVC corrugada 27"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subasePuente provisionalCamara de inspeccionReposición pavimento rígido
Tuberia bajo tierra PVC corrugada 30" (m)
localizacion y replanteoTubería PVC corrugada 27"Excavación en conglomeradolleno con material del sitioEntibado por metro linealArena de encamado de tuberiaRetiro de material sobranteCorte con disco mecánicoDemolición pavimentoReposición de subasePuente provisionalCamara de inspeccion
Reposición pavimento rígido
Empotramiento y Anclaje de Tuberías en Concreto simple Clase II (m3)
Concreto simple 3000 psiAcarreo de material hasta sitio de la obraMano de obraHerramienta menor
Cable en acero para soporte de tuberia
Cable en acero 3/6"Abrazaderas de soporteMano de obraHerramienta menor
CAMARAS DE INSPECCIÓN Cuerpo de cámara d=1.20 m (h= 2 m)
Acero de refuerzoConcreto simple 3000 psiAcarreo de materialMano de obraFormaleta para cámara
Base y cañuela cámara d=1.20 m (un)
Concreto simple 3000 psiAcarreo de material hasta sitio de la obraMano de obraHerramienta menor
TAPAS ALCANTARILLADO
Tapa en HF (un)
Acero de refuerzoConcreto simple 3000 psiMano de obraTapa H.F. con aro
Tapa en Concreto (un)
Acero de refuerzoConcreto simple 3000 psiMano de obra
Cámaras de inspección por unidad
Cuerpo de cámaraBase y cañuelaTapas en concretoExcavación y retiro
CAPITULO 8 - RELLENOS COMPACTADOS
Vibrocompactador tipo canguroMano de obra
Material de prestamoAcarreo de material hasta sitio de la obraVibrocompactador tipo canguroMano de obra
CAPITULO 10 - SUBSTITUCIONES - SUBBASES Y BASES COMPACTADAS
Afirmado compactado (m3)
Afirmado Acarreo de material hasta sitio de la obraVibrocompactador tipo canguroMano de obra
Sustitución en Material granular para encamado de tubería (m3)
Sucio de rioAcarreo de material hasta sitio de la obraHerramienta menorMano de obra
RELLENO COMPACTADO CON MATERIAL EXTRAIDO DE LA EXCAVACION (m3)
RELLENO COMPACTADO CON MATERIAL SELECCIONADO (m3)
Bases para Pavimentos Vehiculares en Material granular triturado tipo Invías (m3)
Material granular trituradoVibrocompactador tipo canguroMano de obra
CAPITULO 12 - OBRAS EN CONCRETO HIDRAULICO
PAVIMENTOS EN FRANJAS
Pavimentos de franjas Concreto Producido en Obra Clase I (280 Mpa) (m3)
AntisolConcreto simple 3000 psiMano de obra
CORTES MECANIZADOS
Corte mecanizado de Pavimentos de Concreto Hidráulico (Prof 0.10 m.) (m)
CortadoraMano de obra instalación
ANDENES - RAMPAS - PEATONALES
Andenes-Rampas-Peatonales en Concreto Producido en Obra Clase II (m3)
Concreto simple 3000 psiMalla electrosoldada 25x 25 cm cal 4Mano de obra (incuye acarreo)Herramienta Menor Base Granular
CONCRETO MUROS Y PANTALLA
Muros y Pantallas en Concreto Ciclópeo producido en Obra (m3)
Concreto simple 3000 psi
PiedraDesperdicioFormaletaHerramienta
Mano de Obra con acarreo
CAPITULO 13 - OBRAS CIVILES VARIAS
Trinchos en Guadua (m2)
Exc.Man mat com Hinca paral d<.31mGuadua sobrebasa L=4 v 3.2 mGuadua cepa L=6 v 4.8 mAsfalto ligaPlastico cal 4Alambre Galvanizado C14Fibra ecomatrix pavco (3.85x3.00)Puntillas promedio 1-1/2----3-1/2Mano de Obra Acarreo de material
Trinchos provisionales (m)
Exc.Man mat com Hinca paral d<.31mGuadua cepa L=6 v 4.8 mAlambre Galvanizado C14Esterilla Mano de Obra Acarreo de material
Paddies con postes en concreto, malla eslabonada calb 10 y Piedra tipo gavion (m)
Exc.Man mat com Hinca paral d<.31mPoste en concreto prefabricado 10 x 10 cm de Long 2 mMalla eslabonada calibre 10Alambre de puaPiedra tipo gavionAlambre Galvanizado C14Mano de Obra Acarreo de material
Drenes horizontales (m)
tuberia de filtro 100 mmBarrenado drenes y anclajes Ø<.15mMano de Obra Herramienta menorAcarreo de material
Pilotines en concreto. Diámetro 0.350 m según diseño. Incluye concreto f'c = 21 Mpa, perforación y acero de refuerzo profundidad 6 metros (un)
HerramientasExcavación mecánicaConcreto 3000 PSI, incluida viga cabezalVibradorDesperdicioAcero de RefuerzoMano de obra (ncluye acarreo de material)
ALIVIADEROS
Aliviadero tipo vertedero lateral < 2.0 m de largo (un)
Concreto simple 3000 psi (incluye acarreo y mano de obra)
Afirmado compactado (incluye acarreo y mano de obra)Acero de refuerzo 60000 psi (incluye mano de obra)FormaletaAcarreo de escombros
Excavacion conglomerado
Aliviadero tipo vertedero lateral < 3.0 m de largo (un)
Concreto simple 3000 psi (incluye acarreo y mano de obra)
Afirmado compactado (incluye acarreo y mano de obra)Acero de refuerzo 60000 psi (incluye mano de obra)FormaletaAcarreo de escombros
Excavacion conglomerado
Aliviadero tipo vertedero lateral < 5 m de largo (un)
Concreto simple 3000 psi (incluye acarreo y mano de obra)
Afirmado compactado (incluye acarreo y mano de obra)Acero de refuerzo 60000 psi (incluye mano de obra)FormaletaAcarreo de escombros
Excavacion conglomerado
CABEZOTE DESCOLE (un)
Roseria y limpiezaAfirmado compactadoConcreto simple 3000 psiAcero de refuerzo 60000 psiAcarreo de materialMano de obra
CANAL DE RAPIDAS CON TAPA COMPLETA Y COLUMPIO (m)
Roseria y lipiezaExcavacion en rocaAfirmado Concreto 3000 PSIFormaletaAcarreo de materialMano de obraAcero de refuerzo 60000 psi
CANAL ABIERTO EN CONCRETO (m)
Roseria y lipiezaExcavacion en conglomeradoConcreto 3000 PSIAcero de refuerzo 60000 psiFormaleta
CANAL ABIERTO EN CONCRETO (m)Roseria y lipiezaExcavacion en conglomeradoConcreto 3000 PSIAcero de refuerzo 60000 psiFormaleta
TAPA CANAL
Concreto 3000 PSIAcero de refuerzo 60000 psiFormaleta
SERVIDUMBRES
CONCRETO
HerramientasConcreto 2000 PSIMano de obra
ESTRUCTURAS EN CONCRETO REFORZADO
SUMINISTRO E INSTALACION CONCRETO POBRE EN SOLADO DE LIMPIEZA (m3)
Cemento gris
Gravilla
ArenaMezcladora
Mano de obra
Concreto para pilas tipo caisson f´c = 21 Mpa (m3)
HerramientasConcreto 3000 PSIVibradorDesperdicioAcarreo de materialMano de obra
Concreto para capiteles f´c =21 Mpa según diseño (m3)
HerramientasConcreto 3000 PSIImpermeabilizanteFormaletaVibradorDesperdicioAcarreo de materialMano de obra
Concreto para muros de contención según diseño (m3)
HerramientasConcreto 3000 PSIImpermeabilizanteFormaletaVibradorDesperdicioAcarreo de materialMano de obra
SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)
Acero promedioAlambreSeguetas y otrosDesperdiciosMano de obra
CONCRETO 3000 PSI (m3)
VIADUCTO O PUENTE METÁLICO PARA LONGITUD MÁXIMA DE 8 m EXTERIORES
ITEM
Localización y replanteoExcavación para pilotesPilotines en concreto. Diámetro 0.350 m. Incluye concreto f'c = 21 Mpa, perforación y refuerzoSolados en concreto pobre e = 0.050 mConcreto viga cabezal f'c = 21 MpaAcero de refuerzoEstructura metálica para viaducto. Incluye silletas, acabado con base epóxica y esmalte epóxicoTubo en polietileno 2 insegún diseno. Incluye abrazaderas de fijaciónLámina perimetral de protección tubería, espesor de 1.2 mm galvanizada y pintada **Retiro de sobrantes
VIADUCTO O PUENTE METÁLICO PARA LONGITUD MÁXIMA DE 30 m EXTERIORES
ITEM
Localización y replanteoExcavación para pilotesPilotines en concreto. Diámetro 0.350 m. Incluye concreto f'c = 21 Mpa, perforación y refuerzoSolados en concreto pobre e = 0.050 mConcreto viga cabezal f'c = 21 MpaAcero de refuerzoEstructura metálica para viaducto. Incluye silletas, acabado con base epóxica y esmalte epóxicoTubo en polietileno 2 insegún diseno. Incluye abrazaderas de fijaciónLámina perimetral de protección tubería, espesor de 1.2 mm galvanizada y pintada **Retiro de sobrantes
SUMINISTRO E INSTALACION TUBERIA POLIESTER REFORZADO CON FIBRA DE VIDRIO (GRP)
Suministro/Instalación de Tuberia bajo tierra GRP 300 mm (m)
Tuberia bajo tierra GRP 300 mmAcople para tuberiaTransporte tuberia hasta la brechaMano de obra instalación
Suministro/Instalación de Tuberia bajo tierra GRP 350 mm (m)
Tuberia bajo tierra GRP 350 mm Acople para tuberiaTransporte tuberia hasta la brecha
Mano de obra instalación
Suministro/Instalación de Tuberia bajo tierra GRP 400 mm (m)
Tuberia bajo tierra GRP 400 mmAcople para tuberiaTransporte tuberia hasta la brechaMano de obra instalación
Suministro/Instalación de Tuberia bajo tierra GRP 450 mm (m)
Tuberia bajo tierra GRP 450 mmAcople para tuberiaTransporte tuberia hasta la brechaMano de obra instalación
Suministro/Instalación de Tuberia bajo tierra GRP 500 mm (m)
Tuberia bajo tierra GRP 500 mmAcople para tuberiaTransporte tuberia hasta la brechaMano de obra instalación
Suministro/Instalación de Tuberia bajo tierra GRP 600 mm (m)
Tuberia bajo tierra GRP 600 mm Acople para tuberiaTransporte tuberia hasta la brechaMano de obra instalación
Suministro/Instalación de Tuberia bajo tierra GRP 700 mm (m)
Tuberia bajo tierra GRP 700 mmAcople para tuberiaTransporte tuberia hasta la brechaMano de obra instalación
Suministro/Instalación de Tuberia bajo tierra GRP 800 mm (m)
Tuberia bajo tierra GRP 800 mmAcople para tuberiaTransporte tuberia hasta la brecha
Mano de obra instalación
Suministro/Instalación de Tuberia bajo tierra GRP 1000 mm (m)
Tuberia bajo tierra GRP 1000 mm Acople para tuberiaTransporte tuberia hasta la brechaMano de obra instalación
SUMINISTRO E INSTALACION TUBERIA POLIETILENO
Suministro/Instalación de Tuberia polietileno 10" PE 100 PN 12.5
Tuberia polietileno 10"Soldadura de tuberiaExcavacion en conglomeradoArena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
Suministro/Instalación de Tuberia polietileno 8" PE 100 PN 12.5
Tuberia polietileno 8"Soldadura de tuberiaExcavacion en conglomeradoArena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
Suministro/Instalación de Tuberia polietileno 6" PE 100 PN 12.5
Tuberia polietileno 6"Soldadura de tuberiaExcavacion en conglomeradoArena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
Suministro/Instalación de Tuberia polietileno 4" PE 100 PN 12.5
Tuberia polietileno 4"Soldadura de tuberiaExcavacion en conglomerado
Arena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
Suministro/Instalación de Tuberia polietileno 3" PE 100 PN 12.5
Tuberia polietileno 3"Soldadura de tuberiaExcavacion en conglomeradoArena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
Suministro/Instalación de Tuberia polietileno 2" PE 100 PN 12.5
Tuberia polietileno 2"Soldadura de tuberiaExcavacion en conglomeradoArena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
Suministro/Instalación de Tuberia polietileno 8" PE 100 PN 10
Tuberia polietileno 8"Soldadura de tuberiaExcavacion en conglomeradoArena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
Suministro/Instalación de Tuberia polietileno 8" PE 100 PN 12.5
Tuberia polietileno 8"Soldadura de tuberiaExcavacion en conglomeradoArena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
Suministro/Instalación de Tuberia polietileno 8" PE 100 PN 16
Tuberia polietileno 8"Soldadura de tuberiaExcavacion en conglomeradoArena de encamadolleno con material del sitioTransporte tuberia hasta el sitio de construccionMano de obra instalación
TUBERIA PVC PRESION
Tuberia PVC presión unión platino 10" RDE 21 (m)
Tubería PVC 10"LubricanteTransporte tuberia hasta el sitio de construccionExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra instalación
Tuberia PVC presión unión platino 8" RDE 21 (m)
Tubería PVC 8"LubricanteTransporte tuberia hasta el sitio de construccionExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra instalación
Tuberia PVC presión unión platino 6" RDE 21 (m)
Tubería PVC 6"Codo 90° PVC presión 6"LubricanteTransporte tuberia hasta el sitio de construccion
Excavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra instalación
Suministro/Instalación de Tuberia pvc presion 4"
Tuberia pvc presion 4"LubricanteTransporte tuberia hasta el sitio de construccionExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra instalación
Tuberia PVC presión unión platino 3" RDE 21 (m)
Tubería PVC 3"LubricanteTransporte de tuberia hasta el sitio de instalacionExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra instalación
Tuberia PVC presión unión platino 2 1/2" RDE 21 (m)
Tuberia PVC 2 1/2"LubricanteTransporte tuberia hasta el sitio de construccionExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra instalación
Tuberia PVC presión unión platino 2" RDE 21 (m)
Tuberia PVC 2"LubricanteTransporte tuberia hasta el sitio de construccionExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra instalación
Suministro/Instalación de Tuberia pvc presion 1 1/2"
Tuberia polietileno 1 1/2"LubricanteTransporte tuberia hasta el sitio de construccionExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra instalación
TUBERIA PVC PRESION CON DEMOLICION DE PAVIMENTO
TUBERIA PVC PRESIÓN 2" RDE 21 (m) con demolición de pavimento
Tubería PVC 2"AccesoriosLubricanteExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obra Corte con disco mecánico Demolición pavimento Evacuación de Escombros/Sobrantes en Vehículo Automotor (m3) Reposición de subase Reposición pavimento rígido
TUBERIA PVC PRESIÓN 3" RDE 21 sobre pavimento (m) Tubería PVC 3"AccesoriosLubricanteExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obraCorte con disco mecánicoDemolición pavimentoEvacuación de Escombros/Sobrantes en Vehículo Automotor (m3)Reposición de subaseReposición pavimento rígido
TUBERIA PVC PRESIÓN 4" RDE 21 sobre pavimento (m) Tubería PVC 4"AccesoriosLubricanteExcavacion en conglomeradoArena de encamadolleno con material del sitioMano de obraCorte con disco mecánicoDemolición pavimentoEvacuación de Escombros/Sobrantes en Vehículo Automotor (m3)Reposición de subaseReposición pavimento rígido
VALVULAS VENTOSAS Y PURGAS
Válvula de cortina en bronce 3" (ud)
Válvula de 3"AccesoriosTeflónMano de obra instalación
Válvula mariposa 10" (ud)
Válvula mriposa 10"AccesoriosCamara de inspeccionMano de obra instalación
Suministro/Instalación de Valvula ventosa 1"
Valvula ventosa 1"Valvula de bola 1"Camara de inspeccionCollarin de derivacionMano de obra instalación
Suministro/Instalación de Valvula ventosa 2"
Valvula ventosa 2Valvula mariposa 2"Camara de inspeccionCollarin de derivacionMano de obra instalación
Suministro/Instalación de Valvula ventosa 3"
Valvula ventosa 3Valvula mariposa 3"Camara de inspeccionCollarin de derivacionMano de obra instalación
Suministro/Instalación de Valvula ventosa 4"
Valvula ventosa 4"Valvula mariposa 4"Camara de inspeccion
Mano de obra instalación
Suministro/Instalación de Valvula de purga 1"
Valvula de bola 1"Tee de 1"Acoples para valvula "Camara de inspeccionMano de obra instalación
Suministro/Instalación de Valvula de purga 1 1/2"
Valvula de mariposa 1 1/2"Tee de 1 1/2"Acoples para valvula "Camara de inspeccionMano de obra instalación
Suministro/Instalación de Valvula de purga 2"
Valvula mariposa 2"Tee de 2"Acoples para valvula "Camara de inspeccionMano de obra instalación
Suministro/Instalación de Valvula de purga 3"
Valvula de mariposa 3"Tee de 3"Acoples para valvula "Camara de inspeccionMano de obra instalación
Suministro/Instalación de Valvula purga 4"
Valvula de bola 4"Tee de 4"Acoples para valvula "Camara de inspeccionMano de obra instalación
Válvula compuerta 12" (ud)
Válvula compuerta 12"
AccesoriosMano de obra instalación
Construccion de tapa en concreto 3.6 m2
Concreto para tapaAcero de refuerzoAcarreo material hasta el sitioMano de obra instalación
Membrana Impermeable
MembranaMarco metalicoAcarreo material hasta el sitioMano de obra instalación
Tapa plastica para tanque
Tapa plasticaAcarreo material hasta el sitioMano de obra instalación
Malla plastica para desarenador 3.6 m2
malla plasticaMarco metalicoAcarreo material hasta el sitioMano de obra instalación
Construcción de vertedero de excesos en desarenador existente (ud)
Mano de obra instalación
TUBERIA GALVANIZADA 2" (m)
Tubo galvanizado 2"Codo galvanizado 2"AbrazaderasAcarreoMano de obra
Tubería en hg 6" (m)
Valor metroSoldaduraPinturaMano de obra pinturaAbrazaderaMano de obra instalación
By pass 2" para tanque de almacenamiento
Valvula de bola 2"Tuberia PVC 2"Tee de 2"codos de 2"Acoples para valvulaAcarreo hasta el sitio de obraMano de obra instalación
Macromedidor 8"
Macromedidor de hf 8"Valvulas 8"AccesoriosCamaras de inspeccionMano de obra instalación
Macromedidor 6"
Macromedidor de hf 6"Valvulas 6"AccesoriosMano de obra instalación
Macromedidor 4"
Macromedidor de hf 4"Valvulas 4"AccesoriosCamaras de inspeccionMano de obra instalación
Macromedidor 3"
Macromedidor de hf 3"Valvulas Mariposa pvc 3"Camaras de inspeccionAccesoriosMano de obra instalación
Macromedidor 2"
Macromedidor de hf 2"Valvulas Mariposa pvc 2 "AccesoriosCamaras de inspeccionMano de obra instalación
Reposicion micromedidor 1/2" (ud)
Contador 1/2"Herramienta menorMANO DE OBRA
ESTACIÓN REGULADORA DE PRESIÓN 3/4"
Válvulas de cortina de3/4"Válvula reguladora de presiónAccesorios PVC y HGCamara de InspeccionMano de obra
ESTACIÓN REGULADORA DE PRESIÓN 1"
Válvulas de cortina de1"Válvula reguladora de presiónAccesorios PVC y HGCamara de InspeccionMano de obra
ESTACIÓN REGULADORA DE PRESIÓN 1 1/2"
Válvulas de cortina de 1 1/2"Manometro 0 a 200 PSIFiltro en yeeVálvula reguladora de presiónAccesorios PVC y HGCamara de InspeccionMano de obra
ESTACIÓN REGULADORA DE PRESIÓN 2"
Válvulas de cortina de 2"Manometro 0 a 200 PSIFiltro en yeeVálvula reguladora de presiónAccesorios PVC y HGCamara de InspeccionMano de obra
ESTACIÓN REGULADORA DE PRESIÓN 3"
Válvulas de cortina de 3"Manometro 0 a 200 PSIFiltro en yeeVálvula reguladora de presiónAccesorios PVC y HGCamara de inspeccion Mano de obra
ESTACIÓN REGULADORA DE PRESIÓN 4"
Válvulas de cortina de 4"Manometro 0 a 200 PSIFiltro en yeeVálvula reguladora de presiónAccesorios PVC y HGCamara de inspeccion Mano de obra
ESTACIÓN REGULADORA DE PRESIÓN 6"
Válvulas de cortina de 6"Manometro 0 a 200 PSIFiltro en yeeVálvula reguladora de presiónAccesorios PVC y HGCámara de válvulas en concretoMano de obra
ESTACIÓN REGULADORA DE PRESIÓN 8"
Válvulas de cortina de 8"Manometro 0 a 200 PSIFiltro en yee
Válvula reguladora de presiónAccesorios PVC y HGCámara de válvulas en concretoMano de obra
DESARENADORES Y TANQUES DE ALMACENAMIENTO
Desarenador 3.6 m3
concreto 3000 psiAcero de refuerzo
Tuberia polietileno 3"Tee de 3"Válvula mariposa 3"Accesorios
Desarenador 12.5 m3
concreto 3000 psiAcero de refuerzo
Tuberia polietileno 6"Tee de 6"Válvula mariposa 6"Accesorios
Desarenador 20 m3
concreto 3000 psiAcero de refuerzo
Tuberia polietileno 6"Tee de 6"Válvula mariposa 6"Accesorios
Desarenador 26 m3
concreto 3000 psiAcero de refuerzo
Tuberia polietileno 6"Tee de 6"Válvula mariposa 6"Accesorios
Desarenador 78 m3
concreto 3000 psiAcero de refuerzo
Tuberia polietileno 6"Tee de 6"Válvula mariposa 6"Accesorios
Filtro grueso dinamico
concreto 3000 psiAcero de refuerzoMaterial filtranteTuberia polietileno 2 " pn 12.5Tee de 2"Valvula de bola 2"Accesorios
FILTRO GRUESO ASCENDENTE 6m2
Excavacion a manoAcarreo interno y Retiro de SobrantesConformacionSolados de limpieza e= 5cmCinta PVCLosa de FondoFiltro drenajes (Suelos)Concreto muros camara Acero de Refuerzo 60000 psiRelleno con Material selec. De sitioCámaras y cajas para válv. Y desaguesmaterial filtrantetuberias y accesorios
FILTRO LENTO ARENA 15m2
Excavacion a manoAcarreo interno y Retiro de SobrantesConformacionSolados de limpieza e= 5cmCinta PVCLosa de FondoFiltro drenajes (Suelos)Concreto muros camara Acero de Refuerzo 60000 psiRelleno con Material selec. De sitioCámaras y cajas para válv. Y desaguesmaterial filtrantetuberias y accesorios
Lecho filtrante
Material filtrante para filtro grueso acendente en capasAcarreo hasta el sitio de obraMano de obra instalación
Falso fondo para filtros m2
falso fondoMano de obra instalación
Tanque de almacenamiento 300 m3
concreto 3000 psiSolado de limpiezaExcavacionAfirmadoAcarreo y evacuacion de escombroscinta pvcFiltro drenajes (Suelos)Acero de refuerzoTuberia hierro galvanzada 6"Valvula de mariposa 6"Accesorios
Tanque de almacenamiento 427 m3
concreto 3000 psiSolado de limpiezaExcavacionAfirmadoAcarreo y evacuacion de escombroscinta pvcFiltro drenajes (Suelos)Acero de refuerzoTuberia hierro galvanzada 6"Valvula de mariposa 6"Accesorios
Tanque de almacenamiento 635 m3
concreto 3000 psiSolado de limpiezaExcavacionAfirmadoAcarreo y evacuacion de escombroscinta pvcFiltro drenajes (Suelos)Acero de refuerzo
Tuberia hierro galvanzada 6"Valvula de mariposa 6"Accesorios
Tanque de almacenamiento 45 m3
concreto 3000 psiSolado de limpiezaExcavacionAfirmadoAcarreo y evacuacion de escombroscinta pvcFiltro drenajes (Suelos)Acero de refuerzoTuberia hierro galvanzada 6"Valvula de mariposa 6"Accesorios
Tanque de almacenamiento 250 m3
concreto 3000 psiSolado de limpiezaExcavacionAfirmadoAcarreo y evacuacion de escombroscinta pvcFiltro drenajes (Suelos)Acero de refuerzoTuberia hierro galvanzada 6"Valvula de mariposa 6"Accesorios
Tanque de almacenamiento 2879 m3
concreto 3000 psiSolado de limpiezaExcavacionAfirmadoAcarreo y evacuacion de escombroscinta pvcFiltro drenajes (Suelos)Acero de refuerzoTuberia hierro galvanzada 6"Valvula de mariposa 6"Accesorios
Canaleta Parshall
Canaleta ParshallMano de obra
CONEXIÓN DE DOMICILIARIA A RED DE ALCANTARILLADO
Kit Silla Yee 250 x 110Caucho kit silla yee 250 x 110Tuberia pvc corrugada 110 mmExcavacionllenoMano de obraSoldadura 1/4 gal
Acometida Domiciliaria para Acueducto
Mano de obra
Collares de derivación Tubería PEAD 20 mmUniones Soldadas D=1/2ExcavacionllenoSoldadura liquida Agua Fria 1/4 GlLimpiador removedor 1/4 Gl
Tuberia PVC 3" excavacion y relleno
Excavacion en conglomeradoArena de encamadolleno con material del sitio
Bomba dosficadora de sulfato de Aluminio
Bomba docificadora de sulfatoMano de obra instalación
ANALISIS DE PRECIOS UNITARIOS
Valla Informativa General del Proyecto (GL)
GL 1.00 28,000 28,000 GL 1.00 700,000 700,000
SUBTOTAL 728,000
Señal Preventiva, Reglamentaria e Informativa (UD)
GL 1.00 18,000 18,000 GL 1.00 110,000 110,000
SUBTOTAL 128,000
ROCERIA Y LIMPIEZA (m2)
GL 1.00 1,000 1,000 m2 1.00 4,941 4,941
SUBTOTAL 5,941
Localización y Replanteo de Redes (m)
DD 0.100 12,000 1,200 DD 0.100 3,000 300
SUBTOTAL 1,500
Localización y Replanteo de sitios de conexiones (incluye topografía y plano récord) (m)
DD 0.020 29,663 593 DD 0.020 60,000 1,200 DD 0.020 98,000 1,960
SUBTOTAL 3,753
Campamento e Instalaciones Provisionales (m2)
m3 0.10 227,819 22,782 m2 1.10 7,341 8,075 Un 3.50 2,656 9,296 m2 1.30 3,248 4,222 LB 0.50 2,500 1,250 gl 0.30 35,000 10,500 Un 0.08 29,710 2,476 Un 0.08 23,955 1,996
JORNA 0.10 253,320 25,332 PESOS 253.32 1 253
gl 0.50 22,900 11,450
SUBTOTAL 97,632
m 2.00 2,000 4,000 m2 1.40 20,500 28,700 LB 0.50 2,500 1,250 GL 0.05 60,000 3,000 GL 1.00 1,000 1,000
SUBTOTAL 37,950
GL 1.00 1,000 1,000 HH 3.00 3,707 11,121 HH 0.85 88,720 75,412
SUBTOTAL 87,533
GL 1.00 500 500 HH 15.00 5,100 76,500
SUBTOTAL 77,000
GL 1.00 1,000 1,000 m3 1.00 77,000 77,000 m3 1.00 22,900 22,900
SUBTOTAL 100,900
GL 1.00 900 900
1.00 3,500 3,500 m3-km 5.00 5,430 27,150
SUBTOTAL 31,550
GL 1.00 900 900
1.00 22,000 22,000
m3
m3
SUBTOTAL 22,900
GL 1.00 1,054 1,054
1.00 15,400 15,400
SUBTOTAL 16,454
GL 1.00 1,057 1,057
1.00 20,800 20,800
SUBTOTAL 21,857
GL 1.00 5,063 5,063
1.00 28,400 28,400
SUBTOTAL 33,463
GL 1.00 5,065 5,065
1.00 36,800 36,800
SUBTOTAL 41,865
GL 1.00 70,014 70,014
1.00 30,400 30,400
SUBTOTAL 100,414
EXCAVACION ROCA 2-4 (m3)
GL 1.00 75,086 75,086
1.00 10,700 10,700
SUBTOTAL 85,786
HH 1.00 23,500 23,500 ML 2.00 830 1,660 ML 1.50 5,500 8,250 Lb 1.00 5,100 5,100
m3
m3
m3
m3
m3
m3
ML 1.00 5,200 5,200
SUBTOTAL 43,710
Instalacion PVC corrugada 8" (m)
m 1.05 34,407 36,127 m 1.05 4,000 4,200 GL 1.00 10,000 10,000
SUBTOTAL 50,327
Instalacion PVC corrugada 10" (m)
m 1.05 50,018 52,519 m 1.05 4,500 4,725 GL 1.00 12,000 12,000
SUBTOTAL 69,244
Instalacion PVC corrugada 12" (m)
m 1.05 73,953 77,651 m 1.05 5,000 5,250 GL 1.00 15,000 15,000
SUBTOTAL 97,901
Instalacion PVC corrugada 14" (m)
m 1.05 85,462 89,735 m 1.05 5,500 5,775 GL 1.00 18,000 18,000
SUBTOTAL 113,510
Instalacion PVC corrugada 16" (m)
m 1.05 114,547 120,274 m 1.05 6,000 6,300 GL 1.00 21,000 21,000
SUBTOTAL 147,574
Instalacion PVC corrugada 18" (m)
m 1.05 150,656 158,189 m 1.05 7,000 7,350 GL 1.00 24,000 24,000
SUBTOTAL 189,539
Instalacion PVC corrugada 20" (m)
m 1.05 187,004 196,354 m 1.05 8,000 8,400 GL 1.00 27,000 27,000
SUBTOTAL 231,754
Instalacion PVC corrugada 24" (m)
m 1.05 240,828 252,869 m 1.05 10,000 10,500 GL 1.00 31,000 31,000
SUBTOTAL 294,369
Instalacion PVC corrugada 27" (m)
m 1.05 289,327 303,793 m 1.05 12,000 12,600 GL 1.00 35,000 35,000
SUBTOTAL 351,393
Instalacion PVC corrugada 30" (m)
m 1.05 361,240 379,302 m 1.05 15,000 15,750 GL 1.00 40,000 40,000
SUBTOTAL 435,052
Instalacion PVC perfilada 42" (m)
m 1.05 878,440 922,362 m 1.05 25,200 26,460 GL 1.00 45,000 45,000
SUBTOTAL 993,822
Tuberia bajo tierra PVC corrugada 8" (m)
m 1.00 3,753 3,753 m 1.05 50,327 52,843
m3 1.50 33,463 50,195 m3 1.40 17,600 24,640 m 2.00 43,710 87,420
m3 0.20 86,770 17,354 m3 0.30 31,550 9,465 m 2.00 7,300 14,600
m3 0.20 87,533 17,507 m3 0.30 106,008 31,802
un 0.20 37,950 7,590 un 0.08 1,720,431 137,634 m3 0.20 507,405 101,481
SUBTOTAL $ 556,284
m 1.00 3,753 3,753 m 1.05 69,244 72,706
m3 1.50 33,463 50,195 m3 1.40 17,600 24,640 m 2.00 43,710 87,420
m3 0.20 86,770 17,354 m3 0.30 31,550 9,465 m 2.00 7,300 14,600
m3 0.20 87,533 17,507 m3 0.30 106,008 31,802 un 0.20 37,950 7,590 un 0.08 1,720,431 137,634 m3 0.20 507,405 101,481
SUBTOTAL $ 576,147
m 1.00 3,753 3,753 m 1.05 97,901 102,796
m3 1.60 33,463 53,541 m3 1.50 17,600 26,400 m 2.00 43,710 87,420
m3 0.30 86,770 26,031 m3 0.40 31,550 12,620 m 2.00 7,300 14,600
m3 0.20 87,533 17,507 m3 0.30 106,008 31,802 un 0.20 37,950 7,590 un 0.08 1,720,431 137,634 m3 0.20 507,405 101,481
SUBTOTAL $ 623,175
m 1.00 3,753 3,753 m 1.05 113,510 119,186
m3 1.70 33,463 56,887 m3 1.60 17,600 28,160 m 2.00 43,710 87,420
m3 0.40 86,770 34,708 m3 0.50 31,550 15,775 m 2.00 7,300 14,600
m3 0.25 87,533 21,883 m3 0.35 106,008 37,103 un 0.25 37,950 9,488 un 0.08 1,720,431 137,634
m3 0.25 507,405 126,851
SUBTOTAL $ 693,448
Tuberia bajo tierra PVC corrugada 16" (m)
m 1.00 3,753 3,753 m 1.05 147,574 154,953
m3 1.80 33,463 60,233 m3 1.70 17,600 29,920 m 2.00 43,710 87,420
m3 0.50 86,770 43,385 m3 0.60 31,550 18,930 m 2.00 7,300 14,600
m3 0.30 87,533 26,260 m3 0.40 106,008 42,403 un 0.30 37,950 11,385 un 0.08 1,720,431 137,634 m3 0.30 507,405 152,222
SUBTOTAL $ 783,098
Tuberia bajo tierra PVC corrugada 18" (m)
m 1.00 3,753 3,753 m 1.05 189,539 199,016
m3 1.90 33,463 63,580 m3 1.80 17,600 31,680 m 2.10 43,710 91,791
m3 0.60 86,770 52,062 m3 0.70 31,550 22,085 m 2.00 7,300 14,600
m3 0.30 87,533 26,260 m3 0.40 106,008 42,403 un 0.30 37,950 11,385 un 0.08 1,720,431 137,634 m3 0.30 507,405 152,222
SUBTOTAL $ 848,471
Tuberia bajo tierra PVC corrugada 20" (m)
m 1.00 3,753 3,753 m 1.05 231,754 243,342
m3 2.00 33,463 66,926 m3 1.90 17,600 33,440 m 2.00 43,710 87,420
m3 0.70 86,770 60,739 m3 0.80 31,550 25,240 m 2.00 7,300 14,600
m3 0.30 87,533 26,260 m3 0.40 106,008 42,403
un 0.30 37,950 11,385 un 0.08 1,720,431 137,634 m3 0.30 507,405 152,222
SUBTOTAL $ 905,364
Tuberia bajo tierra PVC corrugada 24" (m)
m 1.00 3,753 3,753 m 1.05 294,369 309,087
m3 2.20 33,463 73,619 m3 2.00 17,600 35,200 m 3.00 43,710 131,130
m3 0.80 86,770 69,416 m3 0.90 31,550 28,395 m 2.00 7,300 14,600
m3 0.40 87,533 35,013 m3 0.50 106,008 53,004 un 0.30 37,950 11,385 un 0.08 1,720,431 137,634 m3 0.40 507,405 202,962
SUBTOTAL $ 1,105,199
Tuberia bajo tierra PVC corrugada 27" (m)
m 1.00 3,753 3,753 m 1.05 351,393 368,963
m3 2.40 33,463 80,311 m3 2.20 17,600 38,720 m 4.00 43,710 174,840
m3 0.90 86,770 78,093 m3 1.00 31,550 31,550 m 2.00 7,300 14,600
m3 0.50 87,533 43,767 m3 0.60 106,008 63,605 un 0.40 37,950 15,180 un 0.08 1,720,431 137,634 m3 0.50 507,405 253,703
SUBTOTAL $ 1,304,718
Tuberia bajo tierra PVC corrugada 30" (m)
m 1.00 3,753 3,753 m 1.05 435,052 456,805
m3 2.60 33,463 87,004 m3 2.40 17,600 42,240 m 4.00 43,710 174,840
m3 1.20 86,770 104,124 m3 1.50 31,550 47,325 m 2.00 7,300 14,600
m3 0.60 87,533 52,520 m3 0.70 106,008 74,206 un 0.60 37,950 22,770 un 0.08 1,720,431 137,634
m3 0.60 507,405 304,443
SUBTOTAL $ 1,522,263
m3 1.05 345,700 362,985 m3 1.05 22,900 24,045 GL 1.00 150,000 150,000 GL 1.00 2,844 2,844
SUBTOTAL 539,874
m 1.05 2,200 2,310 un 1.00 2,000 2,000 GL 1.00 8,400 8,400 GL 1.00 1,420 1,420
SUBTOTAL 14,130
Cuerpo de cámara d=1.20 m (h= 2 m)
Kg 21.60 4,303 92,945 m3 1.84 345,700 636,088 m3 1.84 22,900 42,136 hh 6.00 12,928 77,566 dia 1.00 75,000 75,000
SUBTOTAL 923,735
Base y cañuela cámara d=1.20 m (un)
m3 0.50 345,700 172,850 m3 0.50 18,900 9,450 GL 1.00 80,000 80,000 GL 1.00 2,844 2,844
SUBTOTAL 265,144
Tapa en HF (un)
Kg 48.00 4,303 206,544 m3 0.44 345,700 152,108 hh 1.00 22,900 22,900 ud 1.00 150,000 150,000
SUBTOTAL 531,552
Tapa en Concreto (un)
Kg 57.0 4,303 245,271 m3 0.54 345,700 186,678 hh 2.0 12,928 25,855
SUBTOTAL 457,804
m 1.60 574,500 919,200 un 1.00 238,815 238,815 un 1.00 85,000 85,000 m3 3.60 25,000 90,000
SUBTOTAL $ 1,333,015
HH 0.600 16,500 9,900 GL 1.00 7,700 7,700
SUBTOTAL 17,600
m3 1.30 13,500 17,550 m3 1.30 22,900 29,770 HH 0.60 14,500 8,700 GL 1.00 7,700 7,700
SUBTOTAL 63,720
m3 1.20 45,000 54,000 m3 1.20 22,900 27,480 HH 0.80 14,500 11,600 GL 1.00 12,928 12,928
SUBTOTAL 106,008
m3 1.30 35,000 45,500 m3 1.30 22,900 29,770 GL 1.00 1,500 1,500 GL 1.00 10,000 10,000
SUBTOTAL 86,770
m3 1.30 50,000 65,000 GL 1.00 10,250 10,250 GL 1.00 12,000 12,000
SUBTOTAL 87,250
kg 1.15 5,626 6,470 m3 1.15 345,700 397,555 DD 1.50 68,920 103,380
SUBTOTAL 507,405
m 1.00 5,900 5,900 GL 1.00 1,400 1,400
SUBTOTAL 7,300
m3 1.00 345,700 345,700 m2 10.00 2,540 25,400 hh 8.90 12,928 115,057 GL 1.00 1,155 1,155 m3 0.60 70,000 42,000
SUBTOTAL 529,312
0.40 345,700 138,280
0.60 63,800 38,280 % 7% 244,760 17,133 GL 0.5 25,000 12,500 m 1.00 1,000 1,000
1.00 150,000 150,000
SUBTOTAL 357,193
m3
m3
m3
m 0.67 525 350 Un 4.00 2,000 8,000 Un 67% 2,400 1,600 KG 33% 773 258 m2 47% 1,881 878
KGF 65% 3,126 2,032 m2 150% 2,020 3,030 LB 0.1 2,500 250 GL 1.00 25,000 25,000 GL 1.00 8,500 8,500
SUBTOTAL 49,898
m 0.67 525 350 Un 2.00 2,400 4,800
KGF 0.65 3,126 2,032 Bulto 0.5 10,000 5,000 GL 1.00 13,000 13,000 GL 1.00 4,500 4,500
SUBTOTAL 29,682
m 1.40 2,500 3,500 Un 1.40 43,515 60,921 m2 0.8 950 760 m 3 400 1,200
m3 0.5 63,800 31,900 KGF 65% 3,126 2,032 GL 1.00 120,000 120,000 GL 1.00 25,000 25,000
SUBTOTAL 245,313
m 1.00 21,023 21,023 m 1.00 60,000 60,000 hh 0.2 12,928 2,586 gl 1 400 400 gl 1 10,200 10,200
SUBTOTAL 94,209
Pilotines en concreto. Diámetro 0.350 m según diseño. Incluye concreto f'c = 21 Mpa, perforación y acero de refuerzo profundidad 6 metros (un)
GL 1.00 1,000 1,000 m 6.00 7,656 45,936
m3 0.87 362,387 313,770 día 0.42 18,000 7,560 % 0.05 362,387 18,119 kg 69.27 4,303 298,069 un 1.00 110,000 110,000
SUBTOTAL 794,454
3.92 651,978 2,555,754
1.20 106,008 127,210 Kg 274.4 4,303 1,180,743 gl 1.0 60,000 60,000 gl 1.0 200,000 200,000
9.20 19,068 175,426
SUBTOTAL 4,299,133
4.86 651,978 3,168,613
1.80 106,008 190,814 Kg 340.2 4,303 1,463,881 gl 1.0 70,000 70,000 gl 1.0 285,000 285,000
13.80 19,068 263,138
SUBTOTAL 5,441,446
10.90 651,978 7,106,560
4.50 106,008 477,036 Kg 763 4,303 3,283,189 gl 1.0 100,000 100,000 gl 1.0 370,000 370,000
34.50 19,068 657,846
SUBTOTAL 11,994,631
m2 3.00 5,941 17,823 m3 0.162 106,008 17,173 m3 0.77 345,700 266,213 Kg 25.85 4,303 111,231 gl 1.00 45,000 45,000 gl 1.00 200,000 200,000
SUBTOTAL 657,440
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2 2.00 5,941 11,882 m3 0.30 80,064 24,019 m3 0.20 60,767 12,153 m3 0.53 345,700 182,530 gl 1.00 35,000 35,000 gl 2.00 22,900 45,800 gl 1.00 253,000 253,000 kg 42.24 4,303 181,759
SUBTOTAL 746,143
m2 2.00 593 1,186 m3 0.30 33,463 10,039 m3 0.26 345,700 89,882 kg 18.20 4,303 78,315 gl 1.00 5,000 5,000
SUBTOTAL 184,422
m2 2.00 593 1,186 m3 0.30 33,463 10,039 m3 0.26 345,700 89,882 kg 18.20 4,303 78,315 gl 1.00 5,000 5,000
SUBTOTAL 184,422
m² 20,000
GL 1.00 1,500 1,500 m3 1.00 207,960 207,960 m3 1.00 100,000 100,000
SUBTOTAL 309,460
Kg 350.00 650 227,500
0.84 45,000 37,800
0.56 55,000 30,800 día 0.25 56,000 14,000
1.00 35,600 35,600
SUBTOTAL 345,700
Concreto para pilas tipo caisson f´c = 21 Mpa (m3)
GL 1.00 1,500 1,500 m3 1.00 345,700 345,700 día 0.50 18,000 9,000 % 5% 345,700 17,285 gl 1.00 22,900 22,900
m3 1.00 180,000 180,000
SUBTOTAL 576,385
Concreto para capiteles f´c =21 Mpa según diseño (m3)
GL 1.00 1,500 1,500 m3 1.00 345,700 345,700 m3 1.00 5,793 5,793 m3 1.00 35,400 35,400 día 0.20 18,000 3,600 % 5% 345,700 17,285 gl 1.00 22,900 22,900
m3 1.00 200,000 200,000
SUBTOTAL 632,178
Concreto para muros de contención según diseño (m3)
GL 1.00 1,500 1,500 m3 1.00 345,700 345,700 m3 1.00 5,793 5,793 m3 1.00 55,200 55,200 día 0.20 18,000 3,600 % 5% 345,700 17,285 gl 1.00 22,900 22,900
m3 1.00 200,000 200,000
SUBTOTAL 651,978
SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)
Kg 1.00 3,172 3,172 Kg 0.04 2,300 92 gl 1.00 80 80 % 5% 3,172 159 gl 1.00 800 800
m3
m3
m3
SUBTOTAL 4,303
UN CANT VR. UNIT VR. PCIAL
M2 12.0 3,753.0 45,036.0 M3 3.0 100,414.0 301,242.0 M3 1.2 576,385.0 691,662.0 M3 0.2 309,460.0 68,081.0 M3 1.1 632,178.0 695,396.0
KGF 150.0 4,303.0 645,450.0 KGF 700.0 8,200.0 5,740,000.0 ML 10.0 11,518.0 115,180.0 M 12.0 57,200.0 686,400.0
M3 3.0 12,500.0 37,500.0
SUBTOTAL 9,025,947
UN CANT VR. UNIT VR. PCIAL
M2 44.0 3,753.0 165,132.0 M3 6.0 80,414.0 482,484.0 M3 20.0 410,398.0 8,207,960.0 M3 2.7 269,460.0 727,542.0 M3 1.1 476,191.0 523,810.0
KGF 150.0 3,903.0 585,450.0 KGF 2,550.0 8,200.0 20,910,000.0 ML 30.0 95,000.0 2,850,000.0 M 36.0 57,200.0 2,059,200.0
M3 3.0 12,500.0 37,500.0
SUBTOTAL 36,549,078
m 1.05 97,962 102,860 m 0.20 187,181 37,436 m 1.05 5,000 5,250 GL 1.00 15,000 15,000
SUBTOTAL 160,546
m 1.05 127,977 134,376 m 0.20 188,707 37,741 m 1.05 6,000 6,300
GL 1.00 18,000 18,000
SUBTOTAL 196,417
m 1.05 153,091 160,746 m 0.20 202,873 40,575 m 1.05 7,000 7,350 GL 1.00 21,000 21,000
SUBTOTAL 229,671
m 1.05 183,135 192,292 m 0.20 212,500 42,500 m 1.05 7,000 7,350 GL 1.00 24,000 24,000
SUBTOTAL 266,142
m 1.05 198,273 208,187 m 0.20 220,799 44,160 m 1.05 8,000 8,400 GL 1.00 24,000 24,000
SUBTOTAL 284,747
m 1.05 210,105 220,610 m 0.20 311,619 62,324 m 1.05 10,000 10,500 GL 1.00 30,000 30,000
SUBTOTAL 323,434
m 1.05 269,091 282,546 m 0.20 350,384 70,077 m 1.05 12,000 12,600 GL 1.00 30,000 30,000
SUBTOTAL 395,223
m 1.05 327,729 344,115 m 0.20 374,983 74,997 m 1.05 15,000 15,750
GL 1.00 35,000 35,000
SUBTOTAL 469,862
m 1.05 454,894 477,639 m 0.20 474,143 94,829 m 1.05 25,200 26,460 GL 1.00 40,000 40,000
SUBTOTAL 638,928
Suministro/Instalación de Tuberia polietileno 10" PE 100 PN 12.5
m 1.05 155,492 163,267 ud 0.09 120,000 10,800 m3 0.64 33,463 21,333 m3 0.32 86,770 27,333 m3 0.32 8,000 2,580 m 0.72 5,000 3,600 GL 1.00 16,000 16,000
SUBTOTAL 244,913
Suministro/Instalación de Tuberia polietileno 8" PE 100 PN 12.5
m 1.05 99,510 104,486 ud 0.09 100,000 9,000 m3 0.56 33,463 18,739 m3 0.32 86,770 27,333 m3 0.25 8,000 1,960 m 0.72 5,000 3,600 GL 1.00 12,000 12,000
SUBTOTAL 177,118
Suministro/Instalación de Tuberia polietileno 6" PE 100 PN 12.5
m 1.05 63,395 66,565 ud 0.09 90,000 8,100 m3 0.49 33,463 16,313 m3 0.26 86,770 22,560 m3 0.23 8,000 1,820 m 0.72 5,000 3,600 GL 1.00 8,000 8,000
SUBTOTAL 126,958
Suministro/Instalación de Tuberia polietileno 4" PE 100 PN 12.5
m 1.05 30,084 31,588 ud 0.09 80,000 7,200 m3 0.42 33,463 14,054
m3 0.21 86,770 18,222 m3 0.21 8,000 1,680 m 0.72 5,000 3,600 GL 1.00 6,000 6,000
SUBTOTAL 82,344
Suministro/Instalación de Tuberia polietileno 3" PE 100 PN 12.5
m 1.05 13,995 14,695 ud 0.09 70,000 6,300 m3 0.36 33,463 11,963 m3 0.17 86,770 14,317 m3 0.19 8,000 1,540 m 1.05 5,000 5,250 GL 1.00 4,000 4,000
SUBTOTAL 58,065
Suministro/Instalación de Tuberia polietileno 2" PE 100 PN 12.5
m 1.05 6,151 6,459 ud 0.09 60,000 5,400 m3 0.25 33,463 8,282 m3 0.09 86,770 7,809 m3 0.16 8,000 1,260 m 1.05 5,000 5,250 GL 1.00 4,000 4,000
SUBTOTAL 38,460
Suministro/Instalación de Tuberia polietileno 8" PE 100 PN 10
m 1.05 75,496 79,271 ud 0.09 100,000 9,000 m3 0.56 33,463 18,739 m3 0.32 86,770 27,333 m3 0.25 8,000 1,960 m 0.72 5,000 3,600 GL 1.00 12,000 12,000
SUBTOTAL 151,903 Suministro/Instalación de Tuberia polietileno 8" PE 100 PN 12.5
m 1.05 99,510 104,486 ud 0.09 100,000 9,000 m3 0.56 33,463 18,739 m3 0.32 86,770 27,333 m3 0.25 8,000 1,960 m 0.72 5,000 3,600 GL 1.00 12,000 12,000
SUBTOTAL 177,118
Suministro/Instalación de Tuberia polietileno 8" PE 100 PN 16
m 1.05 111,683 117,267 ud 0.09 100,000 9,000 m3 0.56 33,463 18,739 m3 0.32 86,770 27,333 m3 0.25 8,000 1,960 m 0.72 5,000 3,600 GL 1.00 12,000 12,000
SUBTOTAL 189,899
Tuberia PVC presión unión platino 10" RDE 21 (m)
m 1.05 153,036 160,688 ud 0.03 40,795 1,224 m 1.05 5,000 5,250
m3 0.64 33,463 21,333 m3 0.38 86,770 32,539 m3 0.26 8,000 2,100 GL 1.00 14,000 14,000
SUBTOTAL 237,134 Tuberia PVC presión unión platino 8" RDE 21 (m)
m 1.05 97,797 102,687 ud 0.03 40,795 1,224 m 1.05 5,000 5,250
m3 0.56 33,463 18,739 m3 0.32 86,770 27,333 m3 0.25 8,000 1,960 GL 1.00 13,000 13,000
SUBTOTAL 170,193 Tuberia PVC presión unión platino 6" RDE 21 (m)
m 1.05 57,052 59,905 ud 0.02 212,495 4,250 ud 0.03 40,795 1,224 m 1.05 5,000 5,250
m3 0.49 33,463 16,313 m3 0.26 86,770 22,560 m3 0.23 8,000 1,820 GL 1.00 12,000 12,000
SUBTOTAL 123,322
m 1.05 26,284 27,599 ud 0.03 40,795 1,224 m 1.05 5,000 5,250
m3 0.42 33,463 14,054 m3 0.21 86,770 18,222 m3 0.21 8,000 1,680 GL 1.00 10,000 10,000
SUBTOTAL 78,029
Tuberia PVC presión unión platino 3" RDE 21 (m)
m 1.05 15,930 16,727 ud 0.03 40,795 1,224 m 1.05 5,000 5,250
m3 0.36 33,463 11,963 m3 0.17 86,770 14,317 m3 0.19 8,000 1,540 GL 1.00 9,000 9,000
SUBTOTAL 60,021
Tuberia PVC presión unión platino 2 1/2" RDE 21 (m)
m 1.05 11,211 11,772 ud 0.03 40,795 1,224 m 1.05 5,000 5,250
m3 0.30 33,463 10,039 m3 0.13 86,770 10,846 m3 0.18 8,000 1,400 GL 1.00 8,000 8,000
SUBTOTAL 48,531
Tuberia PVC presión unión platino 2" RDE 21 (m)
m 1.05 10,235 10,747 ud 0.02 40,795 816 m 1.05 5,000 5,250
m3 0.25 33,463 8,282 m3 0.09 86,770 7,809 m3 0.16 8,000 1,260 GL 1.00 7,500 7,500
SUBTOTAL 41,664
m 1.05 7,426 7,798 ud 0.02 40,795 816 m 1.05 5,000 5,250
m3 0.20 33,463 6,693 m3 0.07 86,770 5,900 m3 0.13 8,000 1,056 GL 1.00 7,000 7,000
SUBTOTAL 34,513
m 1.05 7,421 7,792 ud 0.20 11,388 2,278 ud 0.06 10,750 645 m 1.00 41,865 41,865 m 0.40 86,770 34,708 m 1.00 17,600 17,600 gl 1.00 12,000 12,000
m 2.00 7,300 14,600 m3 0.10 87,533 8,753 m3 0.50 31,550 15,775 m3 0.20 106,008 21,202 m3 0.10 507,405 50,741
SUBTOTAL 227,958
m 1.05 12,666 13,299 ud 0.15 20,835 3,125 ud 0.06 10,750 645 m 1.00 41,865 41,865 m 0.40 86,770 34,708 m 1.00 17,600 17,600 gl 1.00 15,000 15,000 m 2.00 7,300 14,600
m3 0.10 87,533 8,753 m3 0.50 31,550 15,775 m3 0.20 106,008 21,202 m3 0.10 507,405 50,741
SUBTOTAL 237,312
m 1.05 26,284 27,598 ud 0.15 34,502 5,175 ud 0.10 10,750 1,075 m 1.10 41,865 46,052 m 0.40 86,770 34,708 m 1.10 17,600 19,360 gl 1.00 17,000 17,000 m 2.00 7,300 14,600
m3 0.10 87,533 8,753 m3 0.50 31,550 15,775 m3 0.20 106,008 21,202 m3 0.10 507,405 50,741
SUBTOTAL 262,038
Válvula de cortina en bronce 3" (ud)
ud 1.00 241,280 241,280 ud 2.00 12,189 24,379 ud 2.00 400.0 800 hh 1.00 25,000 25,000
SUBTOTAL 291,459 Válvula mariposa 10" (ud)
ud 1.00 1,266,720 1,266,720 ud 2.00 400,000 800,000 ud 1.00 600,000 600,000 hh 1.00 300,000 300,000
SUBTOTAL 2,966,720
ud 1.00 206,480 206,480 ud 1.00 79,460 79,460 ud 1.00 120,000 120,000 ud 1.00 17,400 17,400 GL 1.00 30,000 30,000
SUBTOTAL 453,340
ud 1.00 269,120 269,120 ud 1.00 176,320 176,320 ud 1.00 150,000 150,000 ud 1.00 17,400 17,400 GL 1.00 40,000 40,000
SUBTOTAL 652,840
ud 1.00 696,000 696,000 ud 1.00 216,920 216,920 ud 1.00 150,000 150,000 ud 1.00 17,400 17,400 GL 1.00 50,000 50,000
SUBTOTAL 1,130,320
ud 1.00 1,044,000 1,044,000 ud 1.00 265,640 265,640 ud 1.00 560,000 560,000
GL 1.00 70,000 70,000
SUBTOTAL 1,939,640
ud 1.00 79,460 79,460 ud 1.00 30,032 30,032 ud 2.00 3,876 7,752 ud 1.00 150,000 150,000 GL 1.00 20,000 20,000
SUBTOTAL 287,244
ud 1.00 212,500 212,500 ud 1.00 44,080 44,080 ud 2.00 5,000 10,000 ud 1.00 180,000 180,000 GL 1.00 25,000 25,000
SUBTOTAL 471,580
ud 1.00 269,120 269,120 ud 1.00 56,840 56,840 ud 2.00 65,000 130,000 ud 1.00 200,000 200,000 GL 1.00 50,000 50,000
SUBTOTAL 705,960
ud 1.00 216,920 216,920 ud 1.00 106,720 106,720 ud 2.00 84,000 168,000 ud 1.00 300,000 300,000 GL 1.00 50,000 50,000
SUBTOTAL 841,640
ud 1.00 930,000 930,000 ud 1.00 30,032 30,032 ud 2.00 156,000 312,000 ud 1.00 450,000 450,000 GL 1.00 80,000 80,000
SUBTOTAL 1,802,032 Válvula compuerta 12" (ud)
ud 1.00 2,679,600 2,679,600
ud 2.00 600,000 1,200,000 hh 1.00 1,000,000 1,000,000
SUBTOTAL 4,879,600
m3 0.72 651,978 469,424 kg 72.00 4,303 309,816 gl 1.00 200,000 200,000
GL 1.00 300,000 300,000
SUBTOTAL 1,279,240
m2 3.60 10,672 38,419 gl 1.00 50,000 50,000 gl 1.00 50,000 50,000
GL 1.00 100,000 100,000
SUBTOTAL 238,419
gl 1.00 200,000 200,000 gl 1.00 50,000 50,000
GL 1.00 50,000 50,000
SUBTOTAL 300,000
m2 3.60 7,192 25,891 gl 1.00 50,000 50,000 gl 1.00 50,000 50,000
GL 1.00 100,000 100,000
SUBTOTAL 225,891
Construcción de vertedero de excesos en desarenador existente (ud)
GL 1.00 200,000 200,000
SUBTOTAL 200,000
m 1.05 46,284 48,598 ud 0.50 15,080 7,540 ud 1.00 6,700 6,700 m 1.00 15,000 15,000
HH 1.00 15,000 15,000
SUBTOTAL 92,838 Tubería en hg 6" (m)
ml 1.00 112,200 112,200 ml 1.00 47,100 47,100 ml 1.00 3,351 3,351 ml 1.00 3,000 3,000 ml 1.00 9,600 9,600 ml 1.00 25,000 25,000
SUBTOTAL 200,251
ud 1.00 79,808 79,808 m 8.00 41,664 333,312 ud 1.00 30,032 30,032 ud 3.00 15,080 45,240 ud 2.00 3,876 7,752 ud 1.00 150,000 150,000 GL 1.00 60,000 60,000
SUBTOTAL 706,144
ud 1.00 1,099,639 1,099,639 ud 3.00 426,930 1,280,790 gl 1.00 800,000 800,000 gl 1.00 500,000 500,000 gl 1.00 300,000 300,000
SUBTOTAL 3,980,429
ud 1.00 753,644 753,644 ud 3.00 132,145 396,435 gl 1.00 450,000 450,000 gl 1.00 250,000 250,000
SUBTOTAL 1,850,079
ud 1.00 450,534 450,534 ud 3.00 110,799 332,396 gl 1.00 350,000 350,000 gl 1.00 450,000 450,000 gl 1.00 200,000 200,000
SUBTOTAL 1,782,930
ud 1.00 399,367 399,367 ud 3.00 96,568 289,703 gl 1.00 400,000 400,000 gl 1.00 280,000 280,000 gl 1.00 180,000 180,000
SUBTOTAL 1,549,070
ud 1.00 345,075 345,075 ud 3.00 81,320 243,960 gl 1.00 200,000 200,000 gl 1.00 350,000 350,000 gl 1.00 150,000 150,000
SUBTOTAL 1,289,035
ud 1.00 60,000 60,000 GL 1.00 10,000 10,000 GL 1.00 30,000 30,000
SUBTOTAL 100,000
ud 3.00 17,000 51,000 ud 1.00 25,000 25,000 GL 1.00 5,600 5,600 GL 1.00 150,000 150,000 HH 1.00 30,000 30,000
SUBTOTAL 261,600
ud 3.00 25,000 75,000 ud 1.00 47,700 47,700 GL 1.00 5,600 5,600 GL 1.00 200,000 200,000 HH 1.00 100,000 100,000
SUBTOTAL 428,300
ud 3.00 70,180 210,540 ud 2.00 70,000 140,000 ud 1.00 95,000 95,000 ud 1.00 1,150,000 1,150,000 GL 1.00 120,000 120,000 GL 1.00 300,000 300,000 HH 1.00 200,000 200,000
SUBTOTAL 2,215,540
ud 3.00 196,504 589,512 ud 2.00 70,000 140,000 ud 1.00 120,000 120,000 ud 1.00 1,850,000 1,850,000 GL 1.00 150,000 150,000 GL 1.00 350,000 350,000 HH 1.00 250,000 250,000
SUBTOTAL 3,449,512
ud 3.00 371,695 1,115,085 ud 2.00 70,000 140,000 ud 1.00 85,000 85,000 ud 1.00 1,212,500 1,212,500 GL 1.00 400,000 400,000 gl 1.00 400,000 400,000
HH 1.00 300,000 300,000
SUBTOTAL 3,652,585
ud 3.00 241,280 723,840 ud 2.00 70,000 140,000 ud 1.00 85,000 85,000 ud 1.00 2,150,000 2,150,000 GL 1.00 500,000 500,000 gl 1.00 550,000 550,000
HH 1.00 350,000 350,000
SUBTOTAL 4,498,840
ud 3.00 856,080 2,568,240 ud 2.00 150,000 300,000 ud 1.00 1,062,560 1,062,560 ud 1.00 6,902,000 6,902,000 GL 1.00 800,000 800,000 GL 1.00 700,000 700,000 HH 1.00 500,000 500,000
SUBTOTAL 12,832,800
ud 3.00 1,334,000 4,002,000 ud 2.00 150,000 300,000 ud 1.00 1,335,000 1,335,000
ud 1.00 15,080,000 15,080,000 GL 1.00 800,000 800,000 GL 1.00 800,000 800,000 HH 1.00 700,000 700,000
SUBTOTAL 23,017,000
m3 2.73 651,978 1,781,465 kg 191.27 4,303 823,026
m 10.00 58,065 580,650 ud 2.00 25,600 51,200 ud 3.00 96,568 289,703 gl 1.00 100,000 100,000
SUBTOTAL 3,626,044
m3 6.20 651,978 4,041,025 kg 433.87 4,303 1,866,930
m 20.00 126,958 2,539,160 ud 2.00 65,000 130,000 ud 3.00 621,180 1,863,540 gl 1.00 500,000 500,000
SUBTOTAL 10,940,655
m3 14.19 651,978 9,252,057 kg 1,419.08 4,303 6,106,280
m 30.00 126,958 3,808,740 ud 2.00 65,000 130,000 ud 3.00 621,180 1,863,540 gl 1.00 700,000 700,000
SUBTOTAL 21,860,617
m3 16.05 651,978 10,465,812 kg 1,605.24 4,303 6,907,348
m 35.00 126,958 4,443,530 ud 2.00 65,000 130,000 ud 3.00 621,180 1,863,540 gl 1.00 800,000 800,000
SUBTOTAL 24,610,230
m3 44.18 651,978 28,801,519 kg 4,417.56 4,303 19,008,761
m 40.00 126,958 5,078,320 ud 2.00 65,000 130,000 ud 3.00 621,180 1,863,540 gl 1.00 800,000 800,000
SUBTOTAL 55,682,140
m3 3.61 651,978 2,353,641 kg 324.90 4,303 1,398,045 m3 9.00 322,500 2,902,500 m 20.00 38,460 769,200 ud 4.00 30,032 120,128 ud 2.00 16,000 32,000 gl 1.00 800,000 800,000
SUBTOTAL 8,375,514
M3 13.00 16,454 213,902 M3 13.00 22,900 297,700 M2 15.00 3,200 48,000 M2 9.00 25,246 227,214 ML 10.00 26,313 263,130 M3 2.20 632,178 1,390,792 ML 8.00 61,500 492,000 m 6.50 651,978 4,237,857
ML 700.00 4,303 3,012,100 M3 6.00 14,290 85,740 ud 2.00 450,000 900,000 m3 5.00 322,500 1,612,500 gl 1.00 1,500,000 1,500,000
SUBTOTAL 14,280,935
M3 29.00 16,454 477,166 M3 20.00 22,900 458,000 M2 25.00 3,200 80,000 M2 20.00 25,246 504,920 ML 18.00 26,313 473,634 M3 4.80 632,178 3,034,454 ML 12.00 61,500 738,000 m 10.00 651,978 6,519,780
ML 1,200.00 4,303 5,163,600 M3 15.00 14,290 214,350 ud 2.00 450,000 900,000 m3 12.00 322,500 3,870,000 gl 1.00 2,500,000 2,500,000
SUBTOTAL 24,933,904
m3 1.05 200,000 210,000 m3 1.05 50,000 52,500 gl 1.00 60,000 60,000
SUBTOTAL 322,500
m2 1.05 380,000 399,000 gl 1.00 56,000 56,000
SUBTOTAL 455,000
m3 148.05 651,978 96,525,343 m3 5.00 309,460 1,547,300 m3 150.00 33,463 5,019,450 m3 35.00 106,008 3,710,280 m3 150.00 31,550 4,732,500 m 50.00 26,313 1,315,650 m 240.00 61,500 14,760,000 kg 14,805.00 4,303 63,705,915 m 40.00 236,250 9,450,000 ud 2.00 621,180 1,242,360 gl 1.00 5,000,000 5,000,000
SUBTOTAL 207,008,798
m3 175.60 651,978 114,485,902 m3 6.15 309,460 1,902,560 m3 184.44 33,463 6,171,916 m3 43.04 106,008 4,562,160 m3 184.44 31,550 5,819,082 m 60.00 26,313 1,578,780 m 345.00 61,500 21,217,500 kg 17,559.78 4,303 75,559,733 m 40.00 236,250 9,450,000 ud 2.00 621,180 1,242,360 gl 1.00 5,000,000 5,000,000
SUBTOTAL 246,989,993
m3 274.11 651,978 178,715,646 m3 11.69 3,600 42,091 m3 584.60 33,463 19,562,470 m3 116.92 106,008 12,394,455 m3 584.60 31,550 18,444,130 m 70.00 26,313 1,841,910 m 500.00 61,500 30,750,000 kg 27,411.30 4,303 117,950,824
m 60.00 236,250 14,175,000 ud 2.00 621,180 1,242,360 gl 1.00 7,435,000 7,435,000
SUBTOTAL 402,553,886
m3 25.53 651,978 16,646,172 m3 1.29 309,460 398,584 m3 38.64 33,463 1,293,010 m3 9.02 106,008 955,768 m3 38.64 31,550 1,219,092 m 25.00 26,313 657,825 m 36.00 61,500 2,214,000 kg 2,553.18 4,303 10,986,334 m 15.00 236,250 3,543,750 ud 2.00 621,180 1,242,360 gl 1.00 530,000 530,000
SUBTOTAL 39,686,895
m3 126.51 651,978 82,484,671 m3 4.82 309,460 1,490,050 m3 192.60 33,463 6,444,974 m3 33.71 106,008 3,573,000 m3 192.60 31,550 6,076,530 m 45.00 26,313 1,184,085 m 200.00 61,500 12,300,000 kg 12,651.45 4,303 54,439,189 m 40.00 236,250 9,450,000 ud 2.00 621,180 1,242,360 gl 1.00 2,930,000 2,930,000
SUBTOTAL 181,614,859
m3 912.98 651,978 595,239,615 m3 31.00 309,460 9,593,260 m3 1,860.00 33,463 62,241,180 m3 279.00 106,008 29,576,232 m3 1,860.00 31,550 58,683,000 m 110.00 26,313 2,894,430 m 2,300.00 61,500 141,450,000 kg 100,427.25 4,303 432,138,457 m 100.00 236,250 23,625,000 ud 2.00 621,180 1,242,360 gl 1.00 33,710,000 33,710,000
SUBTOTAL 1,390,393,534
ud 1 2400000 2,400,000 ud 1 600000 600,000
$ 3,000,000
ud 1.00 165,000 165,000 ud 1.00 13,636 13,636 ud 2.00 35,600 71,200 ud 2.00 33,463 66,926 ud 2.00 17,600 35,200 GL 1.00 100,000 100,000 ud 0.03 43,105 1,293
SUBTOTAL 453,255
HH 1.00 30,000 30,000
Und 1.00 15,600 15,600 ML 7.00 2,000 14,000 Und 0.16 800 128 m3 1.80 10,000 18,000 m3 1.80 8,000 14,400 Und 2.00 750 1,500 Und 0.01 57,600 576
SUBTOTAL 94,204
Tuberia PVC 3" excavacion y relleno
m3 0.36 33,463 11,963 m3 0.17 86,770 14,317 m3 0.19 8,000 1,540
SUBTOTAL 27,820
ml 1.00 1,825,000 1,825,000 ml 1.00 400,000 400,000
SUBTOTAL 2,225,000
115,951 aguas dice mas o menos de be dar 115
nata ud hizo estos apu
157,072 aguas dice mas o menos de be dar 157
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
133 de 187
ANÁLISIS DE PRECIOS UNITARIOS. APU
CAPITULO 1 PREELIMINARES
1.1 LOCALIZACIÓN Y REPLANTEO (m²)
Mano de obra
Equipo de topografia
Topografo
1.2 LOCALIZACIÓN Y REPLANTEO DE REDES (m)
Mano de obra
HERRAMIENTA MENOR
1.3 ROCERIA Y LIMPIEZA (m2)
Herramienta menor
Mano de obra
CAPITULO 2 DEMOLICIONES
2.1 DEMOLICIÓN DE CONCRETO HIDRÁULICO
Herramienta
Mano de obra
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
134 de 187
CAPITULO 3 SOBREACARREOS
3.1 MANEJO/MOVILIZACIÓN DE MATERIALES EN VEHÍCULO-NO AUTOMOTOR (m3)
Herramienta
Mano de obra
3.2 EVACUACIÓN DE ESCOMBROS /SOBRANTES EN VEHICULOS AUTOMOTOR (m3)
Herramienta
Equipo de transporte Volqueta
Permiso utilización escombrera
Mano de obra
CAPITULO 4 EXCAVACIONES
4.1 EXCAVACION ZANJA
4.1.1 EXCAVACION ZANJA - MATERIAL COMUN 0-2m (m3)
Herramienta incluye eventual equipo para el manejo de aguas
Mano de obra
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
135 de 187
4.1.2 EXCAVACION EN ZANJA - CONGLOMERADO 0-2m (m3)
Herramienta incluye eventual equipo para el manejo de aguas
Mano de obra
4.2 EXCAVACION PARA ESTRUSTURAS
4.2.1 EXCAVACION PARA ESTRUSTURAS - MATERIAL COMÚN 0-2m (m3)
Herramienta incluye eventual equipo para el manejo de aguas
Mano de obra
4.2.2. EXCAVACION PARA ESTRUSTURAS - CONCLOMERADO 0-2m (m3)
Herramienta incluye eventual equipo para el manejo de aguas
Mano de obra
CAPITULO 5 RELLENOS COMPACTADOS
5.1 RELLENOS COMPACTADOS CON MATERIAL DE EXCAVACIÓN (m3)
Herramienta y ensayos
Mano de obra
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
136 de 187
5.2 RELLENO COMPACTADO CON MATERIAL SELECCIONADO (m3)
Sucio de rio
Acarreo de material hasta sitio de la obra
Herramienta menor
Mano de obra
CAPITULO 6 CONCRETOS
6.1 CONCRETO PARA SOLADOS e=5 cm (m²)
Herramientas
Concreto 2000 PSI
Mano de obra
6.2
Cemento gris
Gravilla
Arena
Mezcladora
Mano de obra
CAPITULO 7 SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)
CONCRETO CLASE II (3000 PSI (m3) 21 Mpa)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
137 de 187
7.1 SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)
Acero promedio
Alambre
Seguetas y otros
Mano de obra
CAPITULO 8 SUMINISTRO E INSTALACION DE TUBERIA EN POLIENTILENO
8.1
Tubería POLIETILENO PE 100 PN 6 ø=200 mm
Equipos-Herramientas para Prueba Hidrostática 8" a 10"
Herramientas menores
Equipo de transporte
Equipos - Herramientas / Fusión de tubería
Transporte tuberia hasta el sitio de construccion
Mano de obra Instalación
8.2
Tubería POLIETILENO PE 100 PN 10 ø=200 mm
SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIÓN E INSTALACIÓN DE TUBERIA EN POLIETILENO 100 PN 6 ø=200 mm INCLUYE TERMOFUSIÓN DE TUBERÍA Y ACCESORIOS (ml)
SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIÓN E INSTALACIÓN DE TUBERIA EN POLIETILENO 100 PN 10 ø=200 mm INCLUYE TERMOFUSIÓN DE TUBERÍA Y ACCESORIOS (ml)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
138 de 187
Equipos-Herramientas para Prueba Hidrostática 8" a 10"
Herramientas menores
Equipo de transporte
Equipos - Herramientas / Fusión de tubería
Transporte tuberia hasta el sitio de construccion
Mano de obra Instalación
8.3
Tubería POLIETILENO PE 100 PN 12.5 ø=200 mm
Herramientas menores
Equipos-Herramientas para Prueba Hidrostática 8" a 10"
Equipo de transporte
Equipos - Herramientas / Fusión de tubería
Transporte tuberia hasta el sitio de construccion
Mano de obra Instalación
8.4
Tubería POLIETILENO PE 100 PN 16 ø=200 mm
Herramientas menores
Equipos-Herramientas para Prueba Hidrostática 8" a 10"
Equipo de transporte
SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIÓN E INSTALACIÓN DE TUBERIA EN POLIETILENO 100 PN 12.5 ø=200 mm INCLUYE TERMOFUSIÓN DE TUBERÍA Y ACCESORIOS (ml)
SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIÓN E INSTALACIÓN DE TUBERIA EN POLIETILENO 100 PN 16 ø=200 mm INCLUYE TERMOFUSIÓN DE TUBERÍA Y ACCESORIOS (ml)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
139 de 187
Equipos - Herramientas / Fusión de tubería
Transporte tuberia hasta el sitio de construccion
Mano de obra Instalación
CAPITULO 9 VALVULAS VENTOSAS Y PURGAS
9.1
Valvula mariposa 3" BxB
Portaflanche PE 100 PN 16 90 mm
Brida Loca 90 mm
Mano de obra instalación Y Equipo de termofusión
9.2
Valvula de compuerta elastica 3" BxB
Portaflanche PE 100 PN 16 90 mm
Brida Loca 90 mm
SUMINISTRO/INSTALACIÓN DE VALVULA VENTOSA 3" INCLUYE ACCESORIOS Y CAJA EN CONCRETO
Tee reducida de polietileno termoemsamblada 200 mm x 90 mm PE 100 PN 16
Válvula de admisión y expulsión de aire doble cámara acción multiple Hf 3" Brida.
Cámara de Inspección/Caída D=1.20 m. Concreto simple Clase II, co ntapa en concreto.
SUMINISTRO/INSTALACIÓN DE VALVULA PURGA 3" INCLUYE ACCESORIOS Y CAJA EN CONCRETO
Tee reducida de polietileno termoensamblada 200 mm x 90 mm PE 100 PN 16
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
140 de 187
Mano de obra instalación Y Equipo de termofusión
CAPITULO 10 OBRAS CIVILES VARIAS
10.1
Porta flanche PE ø=200 mm
Brida loca metálica 200 mm
Adaptador brida universal 200 mm Rango 1 incluye Tornillería
Mano de obra
Cámara de Inspección/Caída D=1.20 m. Concreto simple Clase II, co ntapa en concreto.
EMPALME Empalme (incluye Suministro, Transporte e Instalación Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
141 de 187
ANÁLISIS DE PRECIOS UNITARIOS. APU
CAPITULO 1 PREELIMINARES
Unidad Cantidad Valor unitario Valor Total
DD 0.010 $ 31,399 $ 314
DD 0.02 $ 54,450 $ 817
DD 0.01 $ 92,500 $ 925
SUBTOTAL $ 2,056
LOCALIZACIÓN Y REPLANTEO DE REDES (m)
DD 0.100 12,708 1,271
DD 0.100 1,500 150
SUBTOTAL 1,421
ROCERIA Y LIMPIEZA (m2)
GL 1.00 200 200
m2 1.00 1,059 1,059
SUBTOTAL 1,259
CAPITULO 2 DEMOLICIONES
DEMOLICIÓN DE CONCRETO HIDRÁULICO
Unidad Cantidad Valor unitario Valor Total
GL 1.00 13,205 13,205
HH 7.50 8,150 61,124
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
142 de 187
SUBTOTAL 74,329
CAPITULO 3 SOBREACARREOS
MANEJO/MOVILIZACIÓN DE MATERIALES EN VEHÍCULO-NO AUTOMOTOR (m3)
Unidad Cantidad Valor unitario Valor Total
gl 1.00 $ 900 $ 900
1.00 $ 18,817 $ 18,817
SUBTOTAL $ 19,717
EVACUACIÓN DE ESCOMBROS /SOBRANTES EN VEHICULOS AUTOMOTOR (m3)
Unidad Cantidad Valor unitario Valor Total
GL 1.00 $ 900 $ 900
Día 0.03 $ 406,000 $ 12,180
m3 1.00 $ 480 $ 480
1.00 $ 3,519 $ 3,519
SUBTOTAL $ 17,079
CAPITULO 4 EXCAVACIONES
Unidad Cantidad Valor unitario Valor Total
gl 1.00 $ 1,861 $ 1,861
1.00 $ 12,144 $ 12,144
SUBTOTAL $ 14,005
m3
m3
m3
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
143 de 187
Unidad Cantidad Valor unitario Valor Total
gl 1.00 $ 1,488 $ 1,488
1.00 $ 18,834 $ 18,834
SUBTOTAL $ 20,322
Unidad Cantidad Valor unitario Valor Total
gl 1.00 $ 1,363 $ 1,363
1.00 $ 14,434 $ 14,434
SUBTOTAL $ 15,797
Unidad Cantidad Valor unitario Valor Total
gl 1.00 $ 955 $ 955
1.00 $ 16,854 $ 16,854
SUBTOTAL $ 17,809
CAPITULO 5 RELLENOS COMPACTADOS
Unidad Cantidad Valor unitario Valor Total
gl 1.00 $ 3,200 $ 3,200
1.00 $ 9,546 $ 9,546
m3
m3
m3
m3
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
144 de 187
SUBTOTAL $ 12,746
m3 1.30 32,700 42,510
m3 1.30 20,880 27,144
GL 1.00 900 900
GL 1.00 6,989 6,989
SUBTOTAL 77,543
CAPITULO 6 CONCRETOS
Unidad Cantidad Valor unitario Valor Total
gl 1.00 $ 1,438 $ 1,438
m3 0.05 $ 186,720 $ 9,336
m3 0.05 $ 83,407 $ 4,170
SUBTOTAL $ 14,944
Unidad Cantidad Valor unitario Valor Total
Kg 350.00 $ 500 $ 175,000
0.84 $ 42,000 $ 35,280
0.56 $ 32,000 $ 17,920
día 0.25 $ 31,320 $ 7,830
1.00 $ 12,210 $ 12,210
SUBTOTAL $ 248,240
CAPITULO 7 SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)
m3
m3
m3
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
145 de 187
SUMINISTRO E INSTALACION ACERO DE REFUERZO 60.000 P.S.I. - 4200 kg/cm2 (Kg)
Unidad Cantidad Valor unitario Valor Total
Kg 1.03 $ 2,500 $ 2,575
Kg 0.02 $ 3,480 $ 70
gl 1.00 $ 431 $ 431
gl 1.00 $ 741 $ 741
SUBTOTAL $ 3,817
CAPITULO 8 SUMINISTRO E INSTALACION DE TUBERIA EN POLIENTILENO
Unidad Cantidad Valor unitario Valor Total
m 1.02 $ 51,645 $ 52,678
m 1.00 $ 2,000 $ 2,000
m 0.45 $ 933 $ 420
Día 0.005 $ 210,000 $ 1,050
m 1.00 $ 5,613 $ 5,613
m 1.00 $ 1,200 $ 1,200
m 1.00 $ 3,389 $ 3,389
SUBTOTAL $ 66,349
Unidad Cantidad Valor unitario Valor Total
m 1.02 $ 76,544 $ 78,075
SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIÓN E INSTALACIÓN DE TUBERIA EN POLIETILENO 100 PN 6 ø=200 mm INCLUYE
SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIÓN E INSTALACIÓN DE TUBERIA EN POLIETILENO 100 PN 10 ø=200 mm INCLUYE
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
146 de 187
m 1.00 $ 2,000 $ 2,000
m 0.45 $ 933 $ 420
Día 0.01 $ 210,000 $ 2,100
m 1.00 $ 5,613 $ 5,613
m 1.00 $ 1,200 $ 1,200
m 1.00 $ 3,389 $ 3,389
SUBTOTAL $ 92,796
Unidad Cantidad Valor unitario Valor Total
m 1.02 $ 90,584 $ 92,395
m 0.45 $ 933 $ 420
m 1.00 $ 2,000 $ 2,000
Día 0.01 $ 210,000 $ 2,100
m 1.00 $ 5,613 $ 5,613
m 1.00 $ 1,200 $ 1,200
m 1.00 $ 3,389 $ 3,389
SUBTOTAL $ 107,117
Unidad Cantidad Valor unitario Valor Total
m 1.02 $ 109,950 $ 112,149
m 0.45 $ 933 $ 420
m 1.00 $ 2,000 $ 2,000
Día 0.01 $ 210,000 $ 2,100
SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIÓN E INSTALACIÓN DE TUBERIA EN POLIETILENO 100 PN 12.5 ø=200 mm INCLUYE
SUMINISTRO, TRANSPORTE AL SITIO DE INSTALACIÓN E INSTALACIÓN DE TUBERIA EN POLIETILENO 100 PN 16 ø=200 mm INCLUYE
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
147 de 187
m 1.00 $ 5,613 $ 5,613
m 1.00 $ 1,200 $ 1,200
m 1.00 $ 3,389 $ 3,389
SUBTOTAL $ 126,870
ud 1.00 293,828 310,068
ud 1.00 525,939 525,939
1.00 21,613 21,613
ud 1.00 21,781 21,781
ud 1.00 696,000 696,000
ud 1.00 300,000 300,000
GL 1.00 60,000 60,000
SUBTOTAL 1,935,401
ud 1.00 310,068 310,068
ud 1.00 525,939 525,939
1.00 21,613 21,613
ud 1.00 21,781 21,781
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
148 de 187
ud 1.00 300,000 300,000
GL 1.00 60,000 60,000
SUBTOTAL 1,239,401
CAPITULO 10 OBRAS CIVILES VARIAS
Unidad Cantidad Valor unitario Valor Total
un 1.00 $ 86,966 $ 86,966
un 1.00 $ 74,974 $ 74,974
un 1.00 $ 187,920 $ 187,920
un 1.00 $ 45,708 $ 45,708
SUBTOTAL $ 395,569
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
149 de 187
PRESUPUESTO ARANZAZU
SISTEMA DE ACUEDUCTO
ITEM
1.2
2.1
4.2
3.1
6.1
6.2
7.1
1.1
4.4
3.1
6.1
6.2
7.1
1.2
1.3
2.1
5.2
5.1
8.4
8.3
9.1
10.1
10.2
1.2
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
150 de 187
1.3
2.1
5.2
5.1
8.3
9.1
10.1
10.2
1.2
1.3
2.1
5.2
5.1
8.3
8.4
9.1
10.1
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
151 de 187
PRESUPUESTO ARANZAZU
SISTEMA DE ACUEDUCTO
DESCRIPCION
1. Canal en concreto aducción
Localización y replanteo
Demolición de concreto hidráulico
Excavacion en zanja conglomerado 0-2m
Manejo/movilización de materiales en vehiculo no automotor
Solado de limpieza e=5 cm
Concreto 3000 PSI
Acero de refuerzo 60000 psi- 4200 Kg/cm2
2. Desgravador
Localización y replanteo
Excavacion en conglomerado
Manejo/movilización de materiales en vehiculo no automotor
Solado de limpieza e=5 cm
Concreto 3000 PSI
Acero de refuerzo 60000 psi- 4200 Kg/cm2
Pantalla deflectora metalica
3. Cambio aducción Chambery a PE
3.1 Fase I
Localización y replanteo de redes
Rocería y lipieza
Excavación en Zanja - Material Común - 0.0 a 2.0 m.
Rellenos Compactados con material seleccionado sucio de río
Rellenos Compactados con Material excavación
Tuberia en polietileno PE 100 PN 16 ø=200 mm incluye termofusión de tubería y accesorios
Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Válvulas ventosas 3"
Válvulas de Purga 3"
3.2 Fase II
Localización y replanteo
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm, Codo PE 45° 200 mm)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
152 de 187
Rocería y lipieza
Excavación en Zanja - Material Común - 0.0 a 2.0 m.
Rellenos Compactados con material seleccionado sucio de río
Rellenos Compactados con Material de Obra
Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Válvulas ventosas 3"
Válvulas de Purga 3"
3.3 Fase III Parte 1
Localización y replanteo
Rocería y lipieza
Excavación en Zanja - Material Común - 0.0 a 2.0 m.
Rellenos Compactados con material seleccionado sucio de río
Rellenos Compactados con Material de Obra
Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Tuberia en polietileno PE 100 PN 16 ø=200 mm incluye termofusión de tubería y accesorios
Válvulas ventosas 3"
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm, Codo PE 45° 200 mm)
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm, Codo PE 45° 200 mm)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
153 de 187
PRESUPUESTO ARANZAZU
SISTEMA DE ACUEDUCTO
UNIDAD CANTIDADES COSTO UNITARIO
$ 7,373,040
m 53.51 $ 1,421 $ 76,038
m3 4.00 $ 74,329 $ 297,316
m3 8.63 $ 20,322 $ 175,399
m3 16.22 $ 19,717 $ 319,790
m2 26.76 $ 14,944 $ 399,901
m3 7.57 $ 248,240 $ 1,879,177
kg 1107.00 $ 3,817 $ 4,225,419
$ 1,386,946
m2 4.71 2056.00 $ 9,684
m3 8.68 $ 17,809 $ 154,582
m3 11.28 $ 19,717 $ 222,487
m2 4.71 $ 14,944 $ 70,386
m3 1.08 $ 248,240 $ 268,099
kg 124.00 $ 3,817 $ 473,308
m2 0.63 $ 300,000 $ 188,400
Err:509
m 1051.80 $ 1,421 $ 1,494,608
m2 736.26 $ 1,259 $ 926,951
m3 631.08 $ 14,005 $ 8,838,275
m3 63.11 $ 77,543
m3 534.93 $ 12,746 $ 6,818,202
m 715.94 $ 126,870 $ 90,831,308
m 335.86 $ 107,117 $ 35,976,316
ud4.00
$ 395,569 $ 1,582,275
ud 1.00 Err:509 Err:509
ud 1.00 Err:509 Err:509
Err:509
m 1240.88 $ 1,421 $ 1,763,290
COSTO DIRECTO TOTAL
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
154 de 187
m2 868.62 $ 1,259 $ 1,093,588
m3 744.53 $ 14,005 $ 10,427,115
m3 74.45 $ 77,543
m3 631.09 $ 12,746 $ 8,043,896
m 1240.88 $ 126,870 $ 157,430,446
ud4.00
$ 395,569 $ 1,582,275
ud 2.00 Err:509 Err:509
ud 2.00 Err:509
Err:509
m 394.75 $ 1,421 $ 560,940
m2 276.33 $ 1,259 $ 347,893
m3 236.85 $ 14,005 $ 3,317,084
m3 23.69 $ 77,543
m3 200.76 $ 12,746 $ 2,558,932
m 311.48 $ 44,086 $ 13,731,907
m 83.27 $ 126,870 $ 10,564,465
ud4.00
$ 395,569 $ 1,582,275
ud 1.00 Err:509 Err:509
Costo directo Err:509
AIU (34.36%) Err:509
Costo Total Err:509
PRESUPUESTO ARANZAZU
SISTEMA DE ACUEDUCTO
ITEM
1.2
2.1
4.2
3.1
6.1
6.2
7.1
1.1
4.4
3.1
6.1
6.2
7.1
1.2
1.3
2.1
5.2
5.1
8.4
8.3
9.1
10.1
10.2
1.2
1.3
2.1
5.2
5.1
8.3
9.1
10.1
10.2
1.2
1.3
2.1
5.2
5.1
8.3
8.4
9.1
10.1
10.2
1.2
1.3
2.1
5.2
5.1
8.1
8.2
8.3
8.4
9.1
10.1
10.2
PRESUPUESTO ARANZAZU
SISTEMA DE ACUEDUCTO
DESCRIPCION
1. Canal en concreto aducción
Localización y replanteo
Demolición de concreto hidráulico
Excavacion en zanja conglomerado 0-2m
Manejo/movilización de materiales en vehiculo no automotor
Solado de limpieza e=5 cm
Concreto 3000 PSI
Acero de refuerzo 60000 psi- 4200 Kg/cm2
2. Desgravador
Localización y replanteo
Excavacion en conglomerado
Manejo/movilización de materiales en vehiculo no automotor
Solado de limpieza e=5 cm
Concreto 3000 PSI
Acero de refuerzo 60000 psi- 4200 Kg/cm2
Pantalla deflectora metalica
3. Cambio aducción Chambery a PE
3.1 Fase I
Localización y replanteo de redes
Rocería y lipieza
Excavación en Zanja - Material Común - 0.0 a 2.0 m.
Rellenos Compactados con material seleccionado sucio de río
Rellenos Compactados con Material excavación
Tuberia en polietileno PE 100 PN 16 ø=200 mm incluye termofusión de tubería y accesorios
Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Válvulas ventosas 3"
Válvulas de Purga 3"
3.2 Fase II
Localización y replanteo
Rocería y lipieza
Excavación en Zanja - Material Común - 0.0 a 2.0 m.
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm, Codo PE 45° 200 mm)
Rellenos Compactados con material seleccionado sucio de río
Rellenos Compactados con Material de Obra
Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Válvulas ventosas 3"
Válvulas de Purga 3"
3.3 Fase III
Localización y replanteo
Rocería y lipieza
Excavación en Zanja - Material Común - 0.0 a 2.0 m.
Rellenos Compactados con material seleccionado sucio de río
Rellenos Compactados con Material de Obra
Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Tuberia en polietileno PE 100 PN 16 ø=200 mm incluye termofusión de tubería y accesorios
Válvulas ventosas 3"
Válvulas de Purga 3"
3.4 Fase IV
Localización y replanteo
Rocería y lipieza
Excavación en Zanja - Material Común - 0.0 a 2.0 m.
Rellenos Compactados con material seleccionado sucio de río
Rellenos Compactados con Material de Obra
Tuberia en polietileno PE 100 PN 6 ø=200 mm incluye termofusión de tubería y accesorios
Tuberia en polietileno PE 100 PN 10 ø=200 mm incluye termofusión de tubería y accesorios
Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Tuberia en polietileno PE 100 PN 16 ø=200 mm incluye termofusión de tubería y accesorios
Válvulas ventosas 3"
Válvulas de Purga 3"
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm, Codo PE 45° 200 mm)
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm, Codo PE 45° 200 mm)
Empalme (incluye Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm, Codo PE 45° 200 mm)
PRESUPUESTO ARANZAZU
SISTEMA DE ACUEDUCTO
UNIDAD CANTIDADES COSTO UNITARIO COSTO DIRECTO TOTAL
$ 7,373,040
m 53.51 $ 1,421 $ 76,038
m3 4.00 $ 74,329 $ 297,316
m3 8.63 $ 20,322 $ 175,399
m3 16.22 $ 19,717 $ 319,790
m2 26.76 $ 14,944 $ 399,901
m3 7.57 $ 248,240 $ 1,879,177
kg 1107.00 $ 3,817 $ 4,225,419
$ 1,386,946
m2 4.71 2056.00 $ 9,684
m3 8.68 $ 17,809 $ 154,582
m3 11.28 $ 19,717 $ 222,487
m2 4.71 $ 14,944 $ 70,386
m3 1.08 $ 248,240 $ 268,099
kg 124.00 $ 3,817 $ 473,308
m2 0.63 $ 300,000 $ 188,400
Err:509
m 1051.80 $ 1,421 $ 1,494,608
m2 736.26 $ 1,259 $ 926,951
m3 631.08 $ 14,005 $ 8,838,275
m3 63.11 $ 77,543 $ 4,893,584
m3 534.93 $ 12,746 $ 6,818,202
m 715.94 $ 126,870 $ 90,831,308
m 335.86 $ 107,117 $ 35,976,316
ud4
$ 395,569 $ 1,582,275
ud 1 Err:509 Err:509
ud 1 Err:509 Err:509
Err:509
m 1240.88 $ 1,421 $ 1,763,290
m2 868.62 $ 1,259 $ 1,093,588
m3 744.53 $ 14,005 $ 10,427,115
m3 74.45 $ 77,543 $ 5,773,293
m3 631.09 $ 12,746 $ 8,043,896
m 1240.88 $ 126,870 $ 157,430,446
ud4
$ 395,569 $ 1,582,275
ud 2.00 Err:509 Err:509
ud 2.00 Err:509
Err:509
m 1067.87 $ 1,421 $ 1,517,436
m2 747.51 $ 1,259 $ 941,109
m3 640.72 $ 14,005 $ 8,973,270
m3 64.07 $ 77,543 $ 4,968,327
m3 543.10 $ 12,746 $ 6,922,342
m 311.48 $ 44,086 $ 13,731,907
m 756.385 $ 126,870 $ 95,962,565
ud4
$ 395,569 $ 1,582,275
ud 1.00 Err:509 Err:509
ud 1.00 Err:509
Err:509
m 2569.01 $ 1,421 $ 3,650,563
m2 1798.31 $ 1,259 $ 2,264,069
m3 1541.41 $ 14,005 $ 21,587,391
m3 154.14 $ 77,543 $ 11,952,525
m3 1306.56 $ 12,746 $ 16,653,383
m 1879.74 66349 $ 124,718,869
m 170.49 92796 $ 15,820,790
m 239.78 $ 521,042 $ 124,935,511
m 279 $ 126,870 $ 35,396,730
ud4
$ 395,569 $ 1,582,275
ud 4.00 Err:509 Err:509
ud 3.00 Err:509
Costo directo Err:509
AIU (34.36%) Err:509
Interventoría (7%) Err:509
Costo Total Err:509
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
167 de 187
PRESUPUESTO ARANZAZU RECURSOS FONDO NACIONAL DE CALAMIDADES
ITEM DESCRIPCION
1. Canal en concreto aducción
1.2 Localización y replanteo de redes
2.1 Demolición de concreto hidráulico
4,1,2 Excavacion en zanja conglomerado 0-2m
3.1 Manejo/movilización de materiales en vehiculo no automotor
6.1 Concreto para solados 2= 5 cm.
6.2 Concreto clase II 3000 PSI
7.1 Suministro e instalación Acero de refuerzo 60000 psi- 4200 Kg/cm2
2. Desgravador
1.1 Localización y replanteo
4,2,2 Excavacion para estructuras conglomerado 0-2 m
3.1 Manejo/movilización de materiales en vehiculo no automotor
6.1 Concreto para solados 2= 5 cm.
6.2 Concreto clase II 3000 PSI
7.1 Suministro e instalación Acero de refuerzo 60000 psi- 4200 Kg/cm2
Pantalla deflectora metalica
3. Cambio aducción Chambery a PE
3.1 Fase I
1.2 Localización y replanteo de redes
1.3 Rocería y lipieza
4,1,1 Excavación en Zanja - Material Común - 0.0 a 2.0 m.
5.2 Rellenos Compactados con material seleccionado
5.1 Rellenos Compactados con Material excavación
8.4
10.1
SISTEMA DE ACUEDUCTO (CONSTRUCCIÓN CANAL DE ADUCCIÓN, CONSTRUCCIÓN DESGRAVADOR Y MEJORAMIENTO
LÍNEA DE ADUCCIÓN CHAMBERY DESDE LA ABSCISA K2+520,68 HASTA LA ABSCISA K4+429,48)
Suministro, Transporte hasta el sitio de instalación e Instalación Tuberia en polietileno PE 100 PN 16 ø=200 mm incluye termofusión de tubería y accesorios
Empalme (incluye Suministro, Transporte e Instalación Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
168 de 187
9.1
9.2
3.2 Fase II Parte 1
1.2 Localización y replanteo de redes
1.3 Rocería y lipieza
4,1,1 Excavación en Zanja - Material Común - 0.0 a 2.0 m.
5.2 Rellenos Compactados con material seleccionado
5.1 Rellenos Compactados con Material excavación
8.3
10.1
Suministro/Instalación Válvulas ventosas 3" incluye accesorios y caja en concreto
Suministro/Instalación Válvulas de Purga 3" incluye accesorios y caja en concreto
Suministro, Transporte hasta el sitio de instalación e Instalación Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Empalme (incluye Suministro, Transporte e Instalación Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
169 de 187
PRESUPUESTO ARANZAZU RECURSOS FONDO NACIONAL DE CALAMIDADES
UNIDAD CANTIDADES
$ 10,042,543
m 53.51 $ 1,421 $ 76,038
m3 4.00 $ 74,329 $ 297,316
m3 8.63 $ 20,322 $ 175,399
m3 16.22 $ 19,717 $ 319,790
m2 26.76 $ 14,944 $ 399,901
m3 12.31 $ 248,240 $ 3,055,164
kg 1498.28 $ 3,817 $ 5,718,935
$ 1,836,686
m2 4.71 2056.00 $ 9,684
m3 8.68 $ 17,809 $ 154,582
m3 11.28 $ 19,717 $ 222,487
m2 4.71 $ 14,944 $ 70,386
m3 1.80 $ 248,240 $ 446,832
kg 195.00 $ 3,817 $ 744,315
m2 0.63 $ 300,000 $ 188,400
$ 120,126,069
m 707.07 $ 1,421 $ 1,004,746
m2 494.95 $ 1,259 $ 623,141
m3 424.24 $ 14,005 $ 5,941,509
m3 42.42 $ 77,543 $ 3,289,700
m3 359.60 $ 12,746 $ 4,583,519
m707.07
$ 126,870 $ 89,705,971
ud4.00
$ 395,569 $ 1,582,275
SISTEMA DE ACUEDUCTO (CONSTRUCCIÓN CANAL DE ADUCCIÓN, CONSTRUCCIÓN DESGRAVADOR Y MEJORAMIENTO
LÍNEA DE ADUCCIÓN CHAMBERY DESDE LA ABSCISA K2+520,68 HASTA LA ABSCISA K4+429,48)
COSTO UNITARIO
COSTO DIRECTO TOTAL
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
170 de 187
ud5.00
$ 1,935,401 $ 9,677,005
ud3.00
$ 1,239,401 $ 3,718,203
$ 156,554,122
m 1201.73 $ 1,421 $ 1,707,658
m2 841.21 $ 1,259 $ 1,059,085
m3 721.04 $ 14,005 $ 10,098,137
m3 72.10 $ 77,543 $ 5,591,145
m3 611.18 $ 12,746 $ 7,790,110
m 1201.73 $ 107,117 $ 128,725,712
ud4.00
$ 395,569 $ 1,582,275
SUBTOTAL COSTO DIRECTO $ 288,559,419
ADMINISTRACIÓN 24% $ 69,254,261
UTILIDAD 3% $ 8,656,783
IMPREVISTOS 5% $ 14,427,971
TOTAL $ 380,898,434
INTERVENTORIA 7% $ 26,662,890
SEGUIMIENTO MAVDT 2% $ 8,317,578
TOTAL PROYECTO $ 415,878,902
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
171 de 187
PRESUPUESTO ARANZAZU RECURSOS PLAN DEPARTAMENTAL DE AGUAS DE CALDAS
ITEM DESCRIPCION
3.2 Fase II Parte 2
1.2 Localización y replanteo de redes
1.3 Rocería y lipieza
4,1,1 Excavación en Zanja - Material Común - 0.0 a 2.0 m.
5.2 Rellenos Compactados con material seleccionado
5.1 Rellenos Compactados con Material de Excavación
8.3
9.1
9.2
10.1
3.3 Fase III Parte 1
1.2 Localización y replanteo de redes
1.3 Rocería y lipieza
4,1,1 Excavación en Zanja - Material Común - 0.0 a 2.0 m.
5.2 Rellenos Compactados con material seleccionado
5.1 Rellenos Compactados con Material de Excavación
8.3
8.4
9.1
MEJORAMIENTO LÍNEA DE ADUCCIÓN CHAMBERY DESDE LA ABSCISA K4+429,48 HASTA LA ABSCISA K5+160,84)
Suministro, Transporte hasta el sitio de instalación e Instalación Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Suministro/Instalación Válvulas ventosas 3" incluye accesorios y caja en concreto
Suministro/Instalación Válvulas de Purga 3" incluye accesorios y caja en concreto
Empalme (incluye Suministro, Transporte e Instalación Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm)
Suministro, Transporte hasta el sitio de instalación e Instalación Tuberia en polietileno PE 100 PN 12.5 ø=200 mm incluye termofusión de tubería y accesorios
Suministro, Transporte hasta el sitio de instalación e Instalación Tuberia en polietileno PE 100 PN 16 ø=200 mm incluye termofusión de tubería y accesorios
Empalme (incluye Suministro, Transporte e Instalación Adaptador Brida Universal Rango 1 200 mm , Brida Loca metalica 200 mm, Portaflanche PE 200 mm)
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
172 de 187
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
173 de 187
PRESUPUESTO ARANZAZU RECURSOS PLAN DEPARTAMENTAL DE AGUAS DE CALDAS
UNIDAD CANTIDADES
$ 56,825,788
m 364.14 $ 1,421 $ 517,443
m2 254.90 $ 1,259 $ 320,917
m3 218.48 $ 14,005 $ 3,059,868
m3 21.85 $ 77,543 $ 1,694,190
m3 185.20 $ 12,746 $ 2,360,506
m 364.14 $ 107,117 $ 39,005,584
ud3.00
$ 1,935,401 $ 5,806,203
ud2.00
$ 1,239,401 $ 2,478,802
ud4.00
$ 395,569 $ 1,582,275
$ 48,368,411
m 367.22 $ 1,421 $ 521,820
m2 257.05 $ 1,259 $ 323,631
m3 220.33 $ 14,005 $ 3,085,750
m3 22.03 $ 77,543
m3 186.76 $ 12,746 $ 2,380,472
m309.56
$ 107,117 $ 33,159,139
m57.66
$ 126,870 $ 7,315,324
ud4.00
$ 395,569 $ 1,582,275
SUBTOTAL COSTO DIRECTO $ 105,194,199
MEJORAMIENTO LÍNEA DE ADUCCIÓN CHAMBERY DESDE LA ABSCISA K4+429,48 HASTA LA ABSCISA K5+160,84)
COSTO UNITARIO
COSTO DIRECTO TOTAL
ESTUDIOS Y DISEÑOS DE ACUEDUCTO Y SANEAMIENTO BASICO EN LOS MUNICIPIOS DEL DEPARTAMENTO DE CALDAS ZONA 2CABECERA MUNICIPAL DE ARANZAZU
174 de 187
ADMINISTRACIÓN 25% $ 26,298,550
UTILIDAD 3% $ 3,155,826
IMPREVISTOS 5% $ 5,259,710
TOTAL $ 139,908,284
INTERVENTORIA 8% $ 11,192,663
TOTAL PROYECTO $ 151,100,947
CÁLCULO DEL A.I.U.
EMPOCALDAS S.A. E.S.P.
CALCULO DETALLADO DEL VALOR PORCENTUAL DEL A.I.U.
Duración estimada del Proyecto en mesesCosto directo total del Proyecto
A.I.U. Asumido para el cálculo
Valor total estimado del Proyecto
DESCRIPCION
GASTOS ARRENDAMIENTO Y OFICINA
Valla Informativa General del Proyecto
Arrendamiento de la Oficina Ppal Servicios públicos de la ObraGastos Oficina PpalTransportes en ObraArrendamiento AlmacénGastos oficina principalCosto de ComunicacionesEnsayos de Laboratorio Dotación AlmacenGASTOS DE LEGALIZACIÓN E IMPUESTOS
Póliza de AnticipoPóliza de Cumplimiento
Póliza de Salarios y Prestaciones SocialesPóliza de EstabilidadPóliza de Responsabilidad CivilImpuesto de Seguridad
Estampillas Prouniversidad de Caldas y Universidad Nacional Sede ManizalesEstampillas ProdesarrolloEstampillas ProHospital de CaldasGastos de PublicaciónIca y Reteica (Solo en los municipios que aplique)Impuesto de Industria y ComercioPERSONAL ADMINISTRATIVOSecretaria de la Oficina PpalMensajero de la Oficina PpalElementos de Seguridad Personal en ObraAlmacenista de la Obra (Incluye Prestaciones)Celador de la Obra (Incluye Prestaciones)
OBRA:MEJORAMIENTO DE REDES DE ACUEDUCTO Y ALCANTARILLADO EN EL MUNICIPIO DE VITERBO
PERSONAL TÉCNICOIngeniero Director (Con Prestac. Sociales)Ingeniero Residente (Con Prestac. Sociales)Plan de Gestion Social (Con Prestac. Sociales)
Valor total de los Costos de Legalización y Administración
Valor porcentual de la Legalización y AdministraciónValor porcentual de los ImprevistosValor porcentual de la Utilidad estimada
Valor Total porcentual del A.I.U.
CÁLCULO DEL A.I.U.
EMPOCALDAS S.A. E.S.P.
CALCULO DETALLADO DEL VALOR PORCENTUAL DEL A.I.U.
32.00%
UNIDAD CANTIDAD VR UNITARIO
M2 18.00 $ 81,000 100%Mes 3.00 $ 200,000 25%Mes 3.00 $ 100,000 100%Mes 3.00 $ 200,000 25%Mes 3.00 $ 400,000 100%Mes 3.00 $ 150,000 100%Mes 3.00 $ 100,000 25%Mes 3.00 $ 100,000 100%Mes 3.00 $ 280,000 100%Gl 1.00 $ 500,000 100%
% 0.12% $ 380,898,433 100%
% 0.02% $ 380,898,433 100%% 0.03% $ 380,898,433 100%% 0.24% $ 380,898,433 100%% 0.12% $ 380,898,433 100%% 5.00% $ 380,898,433 100%
% 1.50% $ 380,898,433 100%% 2.00% $ 380,898,433 100%% 0.10% $ 380,898,433 100%% 0.10% $ 380,898,433 100%
% 1.00% $ 380,898,433 100%
Mes 3.00 $ 991,725 25%Mes 3.00 $ 991,725 25%
Frente 3.00 $ 500,000 100%Mes 3.00 $ 1,347,500 100%Mes 3.00 $ 1,239,656 100%
OBRA:MEJORAMIENTO DE REDES DE ACUEDUCTO Y ALCANTARILLADO EN EL MUNICIPIO DE VITERBO
DEDICACIÒN Y/O PORCENTAJE DE
UTILIZACIÓN
Mes 3.00 $ 6,080,000 20%Mes 3.00 $ 2,880,000 100%Mes 3.00 $ 2,400,000 20%
CÁLCULO DEL A.I.U.
EMPOCALDAS S.A. E.S.P.
CALCULO DETALLADO DEL VALOR PORCENTUAL DEL A.I.U.
3 $ 288,559,419
$ 92,339,014
$ 380,898,433
VR. TOTAL
$ 1,458,000 $ 150,000 $ 300,000 $ 150,000 $ 1,200,000 $ 450,000 $ 75,000 $ 300,000 $ 840,000 $ 500,000
$ 457,078
$ 76,180 $ 114,270 $ 914,156 $ 457,078 $ 19,044,922
$ 5,713,477 $ 7,617,969 $ 380,898 $ 380,898
$ 3,808,984
$ 743,794 $ 743,794 $ 1,500,000 $ 4,042,500 $ 3,718,968
$ 3,648,000 $ 8,640,000 $ 1,440,000
$ 68,865,966
24.00%3.00%5.00%
32.00%
CÁLCULO DEL A.I.U.
EMPOCALDAS S.A. E.S.P.
CALCULO DETALLADO DEL VALOR PORCENTUAL DEL A.I.U.
Duración estimada del Proyecto en mesesCosto directo total del Proyecto
A.I.U. Asumido para el cálculo
Valor total estimado del Proyecto
DESCRIPCION
GASTOS ARRENDAMIENTO Y OFICINA
Valla Informativa General del Proyecto
Arrendamiento de la Oficina Ppal Servicios públicos de la ObraGastos Oficina PpalTransportes en ObraArrendamiento AlmacénGastos oficina principalCosto de ComunicacionesEnsayos de LaboratorioDotación AlmacenGASTOS DE LEGALIZACIÓN E IMPUESTOS
Póliza de AnticipoPóliza de Cumplimiento
Póliza de Salarios y Prestaciones SocialesPóliza de EstabilidadPóliza de Responsabilidad CivilImpuesto de Seguridad
Estampillas Prouniversidad de Caldas y Universidad Nacional Sede ManizalesEstampillas ProdesarrolloEstampillas ProHospital de CaldasGastos de PublicaciónImpuesto de Industria y ComercioPERSONAL ADMINISTRATIVOSecretaria de la Oficina PpalMensajero de la Oficina PpalElementos de Seguridad Personal en ObraAlmacenista de la Obra (Incluye Prestaciones)Celador de la Obra (Incluye Prestaciones)PERSONAL TÉCNICO
OBRA:MEJORAMIENTO DE REDES DE ACUEDUCTO Y ALCANTARILLADO EN EL MUNICIPIO DE VITERBO
Ingeniero Director (Con Prestac. Sociales)Ingeniero Residente (Con Prestac. Sociales)Plan de Gestion Social (Con Prestac. Sociales)
Valor total de los Costos de Legalización y Administración
Valor porcentual de la Legalización y AdministraciónValor porcentual de los ImprevistosValor porcentual de la Utilidad estimada
Valor Total porcentual del A.I.U.
CÁLCULO DEL A.I.U.
EMPOCALDAS S.A. E.S.P.
CALCULO DETALLADO DEL VALOR PORCENTUAL DEL A.I.U.
32.00%
UNIDAD CANTIDAD VR UNITARIO
M2 12.00 $ 81,000 100%Mes 1.00 $ 200,000 25%Mes 1.00 $ 100,000 100%Mes 1.00 $ 200,000 25%Mes 1.00 $ 400,000 100%Mes 1.00 $ 150,000 100%Mes 1.00 $ 100,000 25%Mes 1.00 $ 100,000 100%Mes 1.00 $ 280,000 100%Gl 1.00 $ 500,000 100%
% 0.12% $ 138,856,343 100%
% 0.02% $ 138,856,343 100%% 0.03% $ 138,856,343 100%% 0.24% $ 138,856,343 100%% 0.12% $ 138,856,343 100%% 5.00% $ 138,856,343 100%
% 1.50% $ 138,856,343 100%% 2.00% $ 138,856,343 100%% 0.10% $ 138,856,343 100%% 0.10% $ 138,856,343 100%% 1.00% $ 138,856,343 100%
Mes 1.00 $ 991,725 25%Mes 1.00 $ 991,725 25%
Frente 1.00 $ 500,000 100%Mes 1.00 $ 1,347,500 100%Mes 1.00 $ 1,239,656 100%
OBRA:MEJORAMIENTO DE REDES DE ACUEDUCTO Y ALCANTARILLADO EN EL MUNICIPIO DE VITERBO
DEDICACIÒN Y/O PORCENTAJE DE
UTILIZACIÓN
Mes 1.00 $ 6,080,000 20%Mes 1.00 $ 2,560,000 100%Mes 1.00 $ 2,400,000 20%
CÁLCULO DEL A.I.U.
EMPOCALDAS S.A. E.S.P.
CALCULO DETALLADO DEL VALOR PORCENTUAL DEL A.I.U.
1 $ 105,194,199
$ 33,662,144
$ 138,856,343
VR. TOTAL
$ 972,000 $ 50,000 $ 100,000 $ 50,000 $ 400,000 $ 150,000 $ 25,000 $ 100,000 $ 280,000 $ 500,000
$ 166,628
$ 27,771 $ 41,657 $ 333,255 $ 166,628 $ 6,942,817
$ 2,082,845 $ 2,777,127 $ 138,856 $ 138,856 $ 1,388,563
$ 247,931 $ 247,931 $ 500,000 $ 1,347,500 $ 1,239,656
$ 1,216,000 $ 2,560,000 $ 480,000
$ 24,671,021
24.00%3.00%5.00%
32.00%
FASE I FASE II FASE III
FNCPN 16 707.07 - -
PN 12,5 - 1201.73 -
PDAPN 16 - - 57.66